Loading…
Loading…
Tender Value
₹29.9 Cr
EMD Value
₹29.9 L
Closing Date
12 Jun 2026, 9:30 pm7d left
Public Works Department
Construction of Four Lane Road Bangarapet Bagepalli SH-05 from Ch.2.70km to 11.21km in Bangarpet taluk, Kolar District.
301211
PWD/2026-27/RD/WORK_INDENT36119
Open
Roads
PWD Division Office Kolar
7 documents required · 7 mandatory
3.2 b. To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2021-22 to 2025-26 satisfactorily completed (At least 90% of the Contract Value) as a prime contractor at least ONE SIMILAR NATURE OF WORK Such as IMPROVEMENTS TO ROAD to an extent of 50% of the cost of the work of any construction work of value not less than Rs.1492.74 Lakhs (Past experience)Certified duly by the 0fficer not below the rank of Executive Engineer
3.2 c. executed in any one year in the last five years i.e. 2021-22 to 2025-26, the following minimum 80% quantities of work: 1) EWE/Embankment/Subgrade/Earthen Shoulders in Cum-82733.00 2) GSB in Cum- 11474.00 3) WMM in Cum- 11095.00 4)BM/BC/DBM/SDBC-5822.00 Cum 5)PCC/RCC In Cum - 4596.00 5)Steel Reinforcement in MT -112.50 (80% of peak rate of construction)
Owning the following key and critical equipment for this work (minimum capacity of 40/60 TPH ) Hot mix plant/Batch Mix Plant 1 No, Static road roller 1 No. Vibratory road roller 1 No. Mechanical Paver finisher 1 No. Tippers 2 Nos Concrete Batching Plant 1 No.
3.1All Tenderers shall provide the requested information accurately and in sufficient detail in Section 3 Qualification information. 1.To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2021-22 to 2025-26 achieved in at least two financial years a minimum financial turnover(in all classes of civil engineering construction works only) of Rs.3970.68 Lakhs Financial Status(Certificate from CA with UDIN Number, if Failed to satisfy the condition tender will be rejected) (The turn over certificate shall have UDIN generated through ICAI Portal. Turn over certificate without UDIN will not be considered and treated as invalid. The confirmation letter issued by Chartered Accountant shall also have UDIN generated through ICAI Portal)
Liquid assets and /or availability of credit facilities of no less than Rs.497.58 Lakhs (estimated cash flow for 3 months of peak construction period)
Balance sheet for the past five years stating the gross civil engineering contract reciepts.The balance sheet uploaded should be auidted by the Chartered Account and should consist of valid UDIN Number
The Contractor should upload the GST returns (GSTR-3B / GSTR-9) , Income Tax Return (ITR) filed for the relevant assessment year(s) and matches with the Year-wise statement of gross civil engineering contract receipts
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Construction equipment on lease or hire basis by the tenderer and equipment proposed to be deployed on this contract, if awarded ( Wet mix plant/pugmill 1 No, Truck mounted bitumen sprayer 1 No, Motor Grader 1 No, Excavator 0.90 cum bucket capacity 1 No, Tipper Trucks 2 Nos, Self-Loading Concrete mixer 2m3 capacity 1 No, Water Tanker 2 Nos)
₹7,500
₹29.9 L
27 May 2026
27 May 2026
15 Jun 2026
11 Jun 2026
10 Jun 2026
Construction of Four Lane Road Bangarapet Bagepalli SH-05 from Ch.2.70km to 11.21km in Bangarpet taluk, Kolar District.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Pavement Milling - Milling of existing Bituminous surface to a specified depth up to 40mm using Milling machine including disposal of removed material. ---- With all leads and lifts c...
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (R...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Tack coat on Granular surface treated with primer - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. R...
Dense Graded Bituminous Macadam Grading - II for traffic >20 MSA - Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified gradi...
Bituminous Concrete Grading II for traffic >20 MSA - Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre...
Removal of stumps and roots including backfilling with suitable material to required compaction - Girth from 300 mm to 600 mm. Ref to MoRT&H : IRC - 201 ---- With all leads and lifts cost and conveyan...
Removal of stumps and roots including backfilling with suitable material to required compaction - Girth from 900 mm to 1800 mm. Ref to MoRT&H : IRC - 201 ---- With all leads and lifts cost and conveya...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coars...
Construction of Median and Island with Soil Taken from Roadway Cutting - Construction of Median and Island above road level with approved material deposited at site from ...
Painting on concrete surface - Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and apply...
Precast Cement Concrete Interlocking Blocks - Providing and laying 100mm thick factory made precast M -40 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Providing and Fixing Logo of PMGSY Project - Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing.
i) The board will be a composit...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Direction and Place Identification Signs upto 0.9 m2 Size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 made of high intensity...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Tack coat on Bituminous surface - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface clean...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Road Delineators - Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fit...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 200 m stone (precast). ...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - 5th kilometre stone (pr...
Providing and Fixing of Median Marker that are made of tough, high impact resistant, injection-molded, thermoplastic body with an isosceles trapezoidal structure of length, width...
Pedestrian Crossings as per IRC 99-2018 - Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of...
Improvements to Junctions from 4.60km to 10.65km of Bangarapet Bagepalli SH-05 Road in Bangarpet taluk, Kolar District.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. Ref to MoRT&H : IRC - 3...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Granular Sub-Base - Plant Mix Method - Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Tack coat on Granular surface treated with primer - Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. R...
Dense Graded Bituminous Macadam Grading - II for traffic >20 MSA - Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified gradi...
Bituminous Concrete Grading II for traffic >20 MSA - Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre...
Construction of Box Cell Culvert at Ch.7.50km of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District.
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.3.35km, 3.90km, 5.55km, 8.90km, 10.30km (1 Vent 2x1.5m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District.
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all leads and lifts cost and conveyance of all materials, cost of labour...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.8.39km, 8.5km (1 Vent 4x1.5m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all leads and lifts cost and conveyance of all materials, cost of labour...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.4.5km (1 Vent 2.0x2.0m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.4.7km (1 Vent 3.0x2.5m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.6.7km (2 Vent 3.0x3.0m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Providing Size Stone masonry with hard stone in foundation & plinth with
Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all leads and lifts cost and conveyance of all materials, cost of labour...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Construction of Box Cell Culvert at Ch.7.9km (1 Vent 3.0x1.50m) of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Dismantling of Structures - Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, inc...
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite...
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. Ref to MoRT&H : IRC - 2700 ---- With all leads and lifts cost and conveyance of all materials, co...
Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant). Ref to MoRT&H : IRC - 15...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of ...
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and ...
Boundary pillar / Guard Stone - Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding...
Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification - Granular material. Ref to MoRT&H : IRC - 710.1...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea...
Construction of Utility Duct of Size 1.50m x 1.50m of Bangarapet Bagepalli SH-05 in Bangarpet taluk, Kolar District
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED)
pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work ...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating Each depos...
Mechanical Means -
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of ...
Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and ...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting Each deposited layer by ramming after watering with a lea...
Estimate for Shifting of HT/LT/25/63/100kVA line and DTCs as peer requset of AEE,PWD,Bangarpet subDivision from S N Resort to Dhimba Gate in Bangarpet O &M 3 Section ,Bangarpet Sub Division
Supplying and Errection of Spun pole 11 Mtr Long as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equi...
Providing Concreting materials for 11 Mtrs
Spun Pole - Base concreting 1:2:4,
1000x1000x150 mm as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of ...
Providing Concreting materials for 11 Mtrs
Spun Pole - Pole concreting 1:2:4,
1000x1000x2500 mm as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of...
Providing Concreting materials for 11 Mtrs
Spun Pole - Coping 1:2:4 (as per actuals] as
per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, cu...
Supplying and fixing of Special Cross Arm
with Cross Arm for EG Stirrups,
braces, clamps, bolts nuts and washers
complete as per BESCOM Specification. ---- With all leads and lifts cost and conveyance...
Releasing and Re- erection of 3 Phase,
11kV/433V, 25 kVA BEE 4/5 Star Rated
Single Pole Mounted Transformer
Centre on 9 Mtr RCC Pole (Square
Section) as per BESCOM
Specification.[Rs.17685 x1.9 =33601....
Releasing and Re-Erection of 3 Phase,
11kV/433V, 25 kVA BEE, 4/5 Star Rated
Distribution Transformer Centre Using 9
Mtr RCC Pole DPT as per BESCOM
Specification. (Rs.18669.00x1.9 = 35471.10) ---- With...
Releasing and Re- erection of 3 Phase,
11kV/433V, 63 kVA BEE, 4/5 Star Rated
Distribution Transformer Centre Using 9 Mtr
RCC Pole DPTC as per BESCOM
Specification.[Rs.19095.00 x1.9 = 36147.50
Releasing and Re- Erection of 3 Phase,
11kV/433 V, 100 kVA BEE, 4/5 Star Rated
Distribution Transformer Centre Using 9
Mtr RCC Pole DPTC as per BESCOM
Specification.[Rs.19095.00 x1.9 = 36280.50 ] ----...
Releasing and Re- Erection of 2 Pole
Structrue at the Tapping Point Using RCC
Pole as per BESCOM Specification.
[Rs.7784.00 x1.9 = 14789.60 ] ---- With all leads and lifts cost and conveyance of all m...
Supplying and fixing of 11 kV, Horizontal
Cross Arm with HT Single Top supports,
clamps, bolts, nuts & washers - MS - For RCC
Pole as per BESCOM Specification. ---- With all leads and lifts cost and c...
Supplying and fixing of LT 4 Pin Cross Arm
with clamps, bolts, nuts & washers with
brace - MS For RCC Pole as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materia...
Supplying and fixing of LT 2 Pin Cross Arm
with clamps, bolts, nuts & washers with
braces - MS for RCC Pole as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materi...
Supplying and fixing of Rabbit ACSR Conductor as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipme...
Supplying and fixing of 11 kV, 5 KN Polymeric
Pin Insulator (24 mm Dia FRP
Rod) as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing,...
Supplying and fixing of 11 kV, 45 KN
Polymeric Insulator as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machin...
Supplying and fixing of No. 8 Strain Insulator
as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery equipm...
Supplying and fixing of 1.1 kV Pin Insulator with
GI Pin as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machin...
Supplying and fixing of Pole clamp for HT/LT AB
cable as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery...
Supplying and fixing of Suspension Clamp
Assembly suitable for 70 sqmm insulated massanger (Excluding pole clamp &
Eye Hook ) as per BESCOM Specification. ---- With all leads and lifts cost and convey...
Supplying and fixing of Dead End Clamp/Anchor
Clamp Assembly 16 to 70 Sqmm (excluding pole
clamps and Eye hook) as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all ma...
Supplying and fixing of 11 kV, 3 Phase Aerial
Bunched Cable 3x95 + 70 Sqmm as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire...
Supplying and Fixing of V-Shape/Horizontal cross
arm including Single Top Support Brace and
Insulator fixing as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all mater...
Releasing and Refixing of LT 4 Pin Cross Arm with
clamps, bolts, nuts & washers with brace - GI as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of...
Releasing and Refixing of PSCC Pole - 9 Mtr Long,
300 Kg WL as per BESCOM Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of mac...
Releasing and Re restinging of Rabbit ACSR
Conductor as per BESCOM Specification ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of machinery e...
Supplying and Fixing of Guy Set Complete with
No. 15 Strain Insulator as per BESCOM
Specification. ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire char...
Providing guarding for HT< Lines at Road crossing ,Telephone line crossing etc,.up to span of 60M[Including labour for fixing of necessary cross arms][Rs.78.00 Per mtr x 60 Mtr span =4680.00] ---- W...
Estimates for periodicity of routine Maintenance Activities for Third Year
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Maintenance of Road Signs - Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as ...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Painting Two Coats on New Concrete Surfaces - Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. Ref to MoRT&H : IRC - 8...
Printing New Letter and Figures of any Shade - English and Roman. Ref to MoRT&H : IRC - 801 ---- With all leads and lifts cost and conveyance of all materials, cost of labour, curing, hire charges of ...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Estimates for Road Maintenance - Activities to be carried out for the Fourth Year.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Estimate for Road Maintenance - Activities to be carried out for the Fifth Year.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut ...
Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical speci...
Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor. Ref to MoRT&H : IRC - 3003 --...
Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with app...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Patching of Potholes - Patching of Shallow Potholes using SDBC Gr II 25 mm thick - Patching of shallow potholes on asphalt surfaces by using Semi Dense Bituminous Concrete 25mm thickness. The ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
36119 KW4 Bid.doc
Tender Document • 0.31 MB
Download all tender documents and submit your bid