Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹8,943.24 (4.65%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.5 L
EMD Value
₹4,900
Closing Date
10 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt. Of 5 nos of Community Compost Pit 1. at mohalla anchal singh balkar singh wno 3 mai chak. 2. near the land of kewal singh Forelain west A 3. near the land of khajur singh Forelain west 4. pyt Trehara 5. at pyt hardo muthi
2026_RDPR_318477_8
e-NIT No.152/REW/K of 2026-27 Dated 29/07/2026
Open Tender
Civil Works
Percentage
90 days
BARNOTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹4,900
Yes
14 Aug 2026
29 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 31.9 | cum | 592.9 | ₹18,913.51 |
| 2 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 18.75 | cum | 7,571.55 | ₹1,41,966.56 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 0.75 | cum | 5,733.6 | ₹4,300.2 |
| 4 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 190 | kg | 120.8 | ₹22,952 |
| 5 | Carriage of sand and bajri 8 km by mt | 131.5 | Cum | 247.72 | ₹32,575.18 |
| 6 | Carriage of bricks 10 km by mt | 12,585 | no | 0.74 | ₹9,312.9 |
| 7 | Providing and fixing CIB of approved shape and size as per directions of Engineer in charge | 5 | no | 3,000 | ₹15,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_1049692.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .