| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹4.1 L+₹3,725.81 (0.93%)Rejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | L2 | Rejected-AOC L2 BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical TECHNCALLY NOT ACCEPTED |
| Sl No | Description | Qty | Unit | M/S KUMAR CONSTRUCTION and CO. L1 | A.K. ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Repairing, replacement of suction and delivery pipe line of following pump section at different level. Dismantling of pipe. | 9.12 | MT | 6,091.48 ₹55,542.11 | 5,900 ₹53,796.2 Lowest |
| 2.00 | Shifting of pipe for repairing & replacment and repaired pipe installation. | 18.24 | MT | 1,490.29 ₹27,176.93 | 1,450 ₹26,442.2 Lowest |
| 3.00 | Fabrication and installation of pipe for operation. | 9.12 | MT | 11,763.58 ₹1,07,260.32 Lowest | 12,000 ₹1,09,416 |
| 4.00 | Dismamtling, shifting and re-installation of 274/1 and 258/1 pump. Dismantling of pipe from base, suction & delivery pipe line. | 6.89 | MT | 6,091.48 ₹41,970.3 | 5,900 ₹40,651 Lowest |
| 5.00 | Shifting of pumps for repairing and repaired pipe installation. | 13.78 | MT | 1,490 ₹20,532.2 | 1,450 ₹19,981 Lowest |
| 6.00 | Fabrication and installation of pipe and pump. | 6.89 | MT | 11,763 ₹81,047.07 Lowest | 12,000 ₹82,680 |
| 7.00 | Fasteners used for above work H.T (M20X90mm) R.S. rate K/W. | 60 | Nos. | 77 ₹4,620 Lowest | 110 ₹6,600 |
| 8.00 | H.T(M16X75mm) R. S. rate K/W. | 60 | Nos. | 51 ₹3,060 Lowest | 80 ₹4,800 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
5 Dec 2025, 11:00 amClosed
SHASHI KANT
Project office, kedla washery
Off-loading mechanical work of main washery plant of Pump section of Kedla Washery under Hazaribagh Area.
2025_CCL_348015_1
PO/KW/E-Tender/25-26/ 63 Date 24/11/2025
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
KEDLA WASHERY
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,600
2 Mar 2026
24 Nov 2025
6 Dec 2025
25 Nov 2025
5 Dec 2025
25 Nov 2025
25 Nov 2025 - 28 Nov 2025
Amount
Repairing, replacement of suction and delivery pipe line of following pump section at different level. Dismantling of pipe.
Shifting of pipe for repairing & replacment and repaired pipe installation.
Fabrication and installation of pipe for operation.
Dismamtling, shifting and re-installation of 274/1 and 258/1 pump. Dismantling of pipe from base, suction & delivery pipe line.
Shifting of pumps for repairing and repaired pipe installation.
Fabrication and installation of pipe and pump.
Fasteners used for above work H.T (M20X90mm) R.S. rate K/W.
H.T(M16X75mm) R. S. rate K/W.
Total impact of GST for the purpose of CTC
A.K. ENTERPRISES (BID ID -1201587)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
2.38 MB
BOQ
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .