Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹8.0 L+₹8,485.80 (1.07%)Rejected-Finance | L2 | Rejected-Finance not ok |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
6 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Officer
33, Kulakarai Street Kilpennathur Tiruvannamalai District
CONSTRUCTION OF WORK PLATFORM (KARIYAMETAI) IN KILPENNATTHUR TOWN PANCHAYAT
2024_DTP_407598_3
149/2023
Open Tender
Civil Works - Others
Works
60 days
Kilpennathur Town Panchayat Limit
IInd Class
2 documents required · 2 mandatory
₹0
₹10,000
3 Mar 2024
2 Feb 2024
6 Feb 2024
2 Feb 2024
6 Feb 2024
2 Feb 2024
Amount
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. as per standard specifications 20B.
Supplying and Filling foundation and basement with filling Stone dust in layers not more than 15cm . Thick well rammed, watered and compacted Complete complying with standard specification.
Plain Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Brick work in CM 1:5mix using Chamber Bricks (II Class) 9"x43/8"x23/4" including cost , conveyance and labour charges, curing etc., complete complying with standard specifications.
Providing Granolithic pattern floor finish to 25mm thick with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed.
Supplying and Fabrication and placing mild steel or ribbed Tor steel bars for all RCC works including cutting ,bending, cranking binding etc., including cost of binding wire, ms chains laps to fix the reinforcement in all position all labours and materials etc., complete complying with standard specification .
Reinforced cement concrete 1:1.5:3 mix, using hard broken granite stone jelly of size 20mm including cost and conveyance of all materials and all labour charges but excluding cost of Steel etc., complete as per SS.
Providing Form work for all RCC works of sides and soffits for plain surface of slabs, beam, columns and etc., with support and strutting up to 3.29m high with all cross bearings using mild steel sheet and supported by casurina props complying with standard specification
Grade Beam
Column
Beam and Slab
Special Ceiling Plastering with cement mortar 1:3 mix to 10 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, compacting etc., complete complying with standard specifications and as directed.
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, compacting etc., complete complying with standard specifications and as directed.
White Washing two coats with Shell Lime of approved quality including cost and conveyance of all materials to Site and all other labour charges Including cost of Brushes etc., complete
Exterior Emulsion Paint Two Coats with Good Quality of approved Emulsion Paint including cost and conveyance of all materials to Site and all other labour charges Including cost of Brushes etc., complete 10 Sqm
Weathering course with Broken Brick Jelly mixing with Pure slavked Lime Over RCC roof slab including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, compacting etc., complete complying with standard specifications and as directed.
Finishing the top of roof with one course of machine pressed tiles 23 C.m x 23 C.m x 2 C.m size using cement mortor 1:3 mix mixed with 2% by weight of Crude Oil and pointing with Cement Mortor 1:3 mix Cost of all materials and labour charges and brick jelly concrete etc., complete as per standard specifications.
VIP CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_496297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .