The project focuses on integrated natural resource management livelihood enhancement and innovative climate resilient agricultural practices. The targeted blocks include Mandro in Sahebganj district Littipara in Pakur district and Mahagama
2026_BRLF_841826_1
BRLF/2026-27/05
Limited.
Civil Works - Others
Local Purchase Committee
60 days
Pakur, Sahebganj and Godda District in Jharkhand
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
23 Jun 2026
17 Jun 2026
17 Jun 2026 - 22 Jun 2026
Marking
Excavation (Layers 1-10)
Excavation (Layers 6-10)
Stone pitching in Side walls
Grass pitching in Side walls
Cleaning work
Security work
Other Housekeeping works
Miscellaneous works
Grass seeding on bunds
Total Cost (INR)
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Quote for Bill of Quantity for construction of Farm Pond with dimensions 18.3 meters (length) × 18.3 meters (width) × 3 meters (depth).
Marking
Excavation (Layers 1-10)
Excavation (Layers 6-10)
Stone pitching in Side walls
Grass pitching in Side walls
Cleaning work
Security work
Other Housekeeping works
Miscellaneous works
Grass seeding on bunds
Total Cost (INR):
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Quote for Bill of Quantity for construction of Form pond with dimensions 15.2 meters (length) × 18.3 meters (width) × 3 meters (depth).
Marking
Excavation (Layers 1-10)
Excavation (Layers 6-10)
Stone pitching in Side walls
Grass pitching in Side walls
Cleaning work
Security work
Other Housekeeping works
Miscellaneous works
Grass seeding on bunds
Total Cost (INR)
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Quote for Bill of Quantity for construction of Cattle Protection Trench (6ftX 3ft X 4ft).
Marking
Excavation of Trench (TW 6ft. x BW 3ft. x D 4ft. = C/s area 18 Sqft.)
Cleaning work
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Construction of Bricks Work Irrigation Well (Size: 12'0" dia, 32'0" depth)
of Measure
Marking
Earthwork in surface excavation (By Hydraulic Machine).
Earthwork by manual in Hard Soil.
Supplying materials and labour for providing R.C.C well curb(1:2:4) including centring and shuttering but excluding the cost of reinforcement all complete job as per specification and direction of E/I. Curb- ᴫ x 12'10" x 0'10"x0'4", Band-1 - ᴫ x 12'10" x 0'10"x0'4", Band-2- ᴫ x 12'5" x 0'10"x0'4",
Footrest- 15 x 1'0" x 0'6" x 0'4"
Providing TMT bar reinforcement (tor steel) - do- do- all complete job.) For Curb-
For Band & Footrest
Supplying materials and labour for providing brick masonry work with designation 75B in cement mortar (1:6) in staining well of the well including shuttering scaffolding if needed and providing adequate number of weep holes etc all complete as per specification and direction of E/I . Provision is for remaining masonry height of 24'0" below G.L.
Supplying materials and labour for providing brickwork with definition 75B in cement mortar (1:6) in parapet of the well including shuttering scaffolding if needed etc all complete as per specification and direction of E/I. Parapet: -- ᴫ x 12'5" x 0'10" x2'0"
Providing PCC M-150 for Copping of Parapet in nominal mix of 1:2:4 (1 cement: 2 coarse sand(zone-III):4 graded stone aggregate 20mm nominal size) - do- all complete job. Parapet: - ᴫ x 12'5" x 0'10" x 0'2"
Supplying materials and labour for 25 mm thick CP (1:6) cement mortar with 1.5 mm cement punning on parapet including curing, carriage of water with all leads and lifts as per building specification and direction of E/I. Outer: - ᴫ x 13'8" x 2'0", Top :- ᴫ x 12'10" x 0'10", Inner :- ᴫ x 12'0" x 2'0"
Supplying equipment and labour for back filling the excavated earth around staining well - do - do-all complete job. ᴫ x 16'0" x 1'3" x 10'8” and ᴫ x 15'0" x 2'0" x 21'4"
I. Providing cost of dewatering during digging/ masonry work in well - do - all complete job (LS)
II. Providing cost of pully, lathha, rope etc. - do - do- all complete job.
Carriage cost of materials
Contingencies (Photography, first aid box, Temp. Shed, C.I.B.)
Total
Total in Words
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Detailed Estimate for Construction of Irrigation Well (Size : 20'0" dia, 25'0" depth) (Brick+Stone, Masonry)
Providing earth work in digging in well all kinds of soil - do- do - all complete job.
(a) Earthwork in surface excavation (By Hydraulic Machine).
ᴫ/4 x (26'0")2 x 20'0" = 10613.20 cft
(b) Earthwork by manual in Hard Soil.
ᴫ/4 x (26'0")2 x 5'0" = 2653.30 cft
1 MD / 26 cft =
Total =
As Per SOR' 2022
Total Qty.
For Curb
For Band
Total Qty.
4. 3.1.69 (A)-DWSD
Dry masonry work of 6'6" above the bottom curb (RCC Curb).
Providing Dry Rough dressed stone masonry
6th Lift
For 8 lift @Rs.22.54 /lift= 8 X Rs. 22.54 =
Total (A) =
5th Lift
For 7 lift @Rs.22.54 /lift= 7 X Rs. 22.54
Total (B) =
Net Amount=(A+B)
5. 3.1.69 (A)(i) -DWSD
4th Lift
For 4 lift @Rs.22.54 /lift= 4 X Rs. 22.54
Total =
3rd Lift
For 3 lift @Rs.22.54 /lift= 3 X Rs. 22.54
Total =
2nd Lift
For 2 lift @Rs.22.54 /lift= 2 X Rs. 22.54
Total =
1st Lift
For 1 lift @Rs.22.54 /lift= 1 X Rs. 22.54
Total =
Upto G.L.
6. 3.1.69 (C- ii) DWSD
Parapet:- ᴫ x 21'25" x 0'10" x2'0" =
Parapet :- ᴫ x 21'3" x 1'3" x 0'2" =
Outer :- ᴫ x 22'6" x 2'0" =
Top :- ᴫ x 21'3" x 1'3" =
Inner :- ᴫ x 20'0" x 2'0" =
Supplying equipment and labour for back filling the excavated earth around steining well - do - do-all complete job.
Total Quantity
1MD/73 cft =
Providing cost of dewatering during digging/ masonry work in well - do - all complete job (LS)
Lumpsum
Sub-Total:
Add carriage cost of materials
(Payment should be made as per actual lead)
(i) Sand: (lead - 3P+2K) Km
(ii) Chips: (lead - 10P+2K) Km
(iii) Boulder: (lead - 10P+2K) Km
(iv) Bricks: (lead - 5P+3K) Km
(v) Cement+Steel: (lead - 8P+2K) Km
Sub-Total:
Sub-Total (Including Carriage):
Contingencies:
Photography
First Aid Box
Temp Shed
Sub-Total:
Total Cost
Say Total Cost for the Construction of Irrigation Well
*All prices to be quoted above should be inclusive of all taxes and any other charges that may be levied.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
RFP.pdf
Tender Documents • 1.21 MB
Financial Sheet.xls
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .