Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -32.33% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.8 L+₹14,400 (8.51%)Admitted-Fee/PreQual/Technical/Finance GROUND FLOOR 05 WANABAL NEAR RAILWAY BRIDGE WANABAL NOWGAM SRINAGAR GUND CHECK PORA B K PORA KANIPORA BK PORA | -26.57% | ₹1.8 L+₹14,400 (8.51%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹80,325 (47.5%)Admitted-Fee/PreQual/Technical/Finance | -0.20% | ₹2.5 L+₹80,325 (47.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.5 L+₹80,575 (47.6%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹2.5 L+₹80,575 (47.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹12,500
Closing Date
13 Aug 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
Construction of Bathroom or Washrooms near Masjid Hussaini Gamandar at Sonzipora B K Pora
2026_RDPR_317455_21
NIT_18_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
B K Pora
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹12,500
29 Aug 2026
23 Jul 2026
14 Aug 2026
23 Jul 2026
13 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earthwork in excavation by manual means in trenches for foundation drains pipes etc not exceeding 1.5mtr in width and not exceeding 10 sqm on plan depth upto 1.5mtr including backfilling of soil & disposal of excavated soil to be leveled and neatly dressed within 25mts lead. | 6.7 | Cum | 479.3 | ₹3,211.31 |
| 0_) | P/L stone soling hand packed on level incl ramming with heavy rammers incl. all carriage upto site of work | 2.42 | Cum | 1,250 | ₹3,025 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 5.48 | Cum | 5,733.6 | ₹31,420.13 |
| 0_) | P/L in position of Reinforcement cement concrete (1:1.5:3 ) stone aggregate 20mm nominal size aggregate excluding the cost of centring and shuttering all work upto plinth level | 1.54 | Cum | 9,395.7 | ₹14,469.38 |
| 0_) | Reinforcement for RCC works incld. straightening bending cutting placing in position and binding all complete (TMT Bars) | 153.48 | Kg | 115.14 | ₹17,671.69 |
| 0_) | Centring and shuttering incl strutting propping etc and removal of form work | 33.57 | Sqm | 286.35 | ₹9,612.77 |
| 0_) | Centring and shuttering incl strutting propping etc and removal of form work suspended floors, roofs, landings, balconies and access platforms | 10.93 | Sqm | 718.2 | ₹7,849.93 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide. | 21.85 | cum | 262.2 | ₹5,729.07 |
| 0_) | S/S of Boulder/GSB filling under rooms floors incl. watering and ramming with hand rammer including carriage. | 2.86 | Cum | 1,250 | ₹3,575 |
| 0_) | Brickwork with FPS brick of class designated in 1:6mix in superstructure above plinth upto floor five level | 5.68 | Cum | 7,877.4 | ₹44,743.63 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_1040608.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .