Loading…
Loading…
Tender Value
₹6 L
EMD Value
₹12,000
Closing Date
10 Jul 2026, 4:00 pm3d left
EXECUTIVE OFFICER
Viratnagar
Construction of a Community Hall near Bhomiya Ji Temple Meeno Ka Dhaba Ward No. 14
2026_DLB_572470_1
3988
Open Tender
Civil Works
120 days
VIRATNAGAR KOTPUTLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
EXECUTIVE OFFICER
₹12,000
Yes
2 Jul 2026
2 Jul 2026
13 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of
unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. Dismantling Stone Masonry Rubble stone masonry in cement mortar. | 5.4 | cum | 386 | ₹2,084.4 |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural
ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt,
clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 7.78 | cum | 229.5 | ₹1,785.51 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size).footing floor | 5.26 | cum | 4,575 | ₹24,064.5 |
| 4 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 10.69 | cum | 4,860 | ₹51,953.4 |
| 5 | Earth filling with available surplus soil excavated from foundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift
upto 1.5 m. | 13.06 | cum | 159 | ₹2,076.54 |
| 6 | Random rubble dry stone Kharanja (soling) under floor. | 4.9 | cum | 2,270 | ₹11,123 |
| 7 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including
strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. footing | 6.48 | sqm | 236.5 | ₹1,532.52 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. plinth beam beam | 30.3 | sqm | 426 | ₹12,907.8 |
| 9 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts. Column | 40.8 | sqm | 375 | ₹15,300 |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form Suspended floors, roofs, landings, balconies and access platform roof | 58.5 | sqm | 456 | ₹26,676 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_1018416.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid