| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.7 LAccepted-AOC GSTIN: 21AIEPK4753A1ZWAT NAKULABASAPUR PO HENSAMULA TALCHER DIST ANGUL ODISHA PIN 759103 | TALCHER | ANGUL | ODISHA | 759103 | ₹69.7 L Quoted ₹59.1 L | L1 | Accepted-AOC Accepted due to becoming techno-commercially eligible L-1 bidder. |
| 2 | L2₹60.9 LRejected-Finance GSTIN: 21BODPK0162D1ZRAT DERA COLLIERY TALCHER ANGUL ODISHA 759100 | TALCHER | ANGUL | ODISHA | 759100 | ₹60.9 L | L2 | Rejected-Finance Rejected due to not becoming techno-commercially eligible L-1 bidder. |
| 3 | L3₹64.0 LRejected-Finance BHUBANESWARI BHUBANESWARI ODISHA | ₹64.0 L | L3 | Rejected-Finance Rejected due to not becoming techno-commercially eligible L-1 bidder. |
| Sl No | Description | Qty | Unit | M/S.RAKHI ELECTRICALS L1 | OMM SHANKAR TRANSPORT L2 | M/S DIVYA SHAKTI ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Fabrication & Erection of new Pontoon (8 m x 6 m) containing 80 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm), MS channel (150 mm x 75 mm) and MS sheet (2 mm thick and 8 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 3 | Nos. | 5,73,800 ₹17.2 L | 5,88,000 ₹17.6 L | 6,15,000 ₹18.4 L |
| 3.00 | Fabrication & Erection of new Pontoon (7.5 m x 6 m) containing 72 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6mm and 50 mm x 50 mm x 6 mm), MS channel (175 mm x 75 mm) and MS sheet (2 mm thick and 7.5 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 3 | Nos. | 5,42,000 ₹16.3 L | 5,56,000 ₹16.7 L | 5,90,000 ₹17.7 L |
| 4.00 | Fabrication & Erection of new Pontoon (6 m x 6 m) containing 60 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm), MS channel (150 mm x 75 mm) and MS sheet (2 mm thick and 6 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 2 | Nos. | 4,44,200 ₹8.9 L | 4,48,600 ₹9.0 L | 4,75,000 ₹9.5 L |
| 5.00 | Fabrication & Erection of new Pontoon (3 m x 2.4 m) containing 12 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm) and MS sheet (2 mm thick and 3 m x 2.4 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 2 | Nos. | 79,600 ₹1.6 L | 94,000 ₹1.9 L | 99,000 ₹2.0 L |
| 6.00 | Fabrication & Erection of new Pontoon (2 m x 1.2 m) containing 06 drums of 210 litre HDPE barrel using MS angle 65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm) and MS sheet (2 mm thick and 2 m x 1.2 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 9 | Nos. | 43,850 ₹3.9 L | 47,000 ₹4.2 L | 48,000 ₹4.3 L |
| 7.00 | Repairing of Old damaged 60 drum of 210 litre HDPE barrel using MS angle, MS channel and MS sheet and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | 5 | Nos. | 2,12,690 ₹10.6 L | 2,17,000 ₹10.8 L | 2,29,000 ₹11.4 L |
| 8.00 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | 1 | Nos | 58,531 ₹58,531 | 60,252 ₹60,252 | 63,400 ₹63,400 |
Tender Value
₹76.3 L
EMD Value
₹95,400
Closing Date
15 Apr 2026, 5:00 pmClosed
STAFF OFFICER (ENM), HINGULA AREA
STAFF OFFICER(ENM), OFFICE OF THE GM HINGULA AREA, MCL, TALCHERPO NS NAGAR, ANGUL, ODISHA, 759148
Fabrication and erection of different sizes on new Pontoons and repairing of old damaged 60 drum pontoons for installation of pumps, accessories shifting and cable laying near Pontoon at different sumps of BOCP, Hingula Area.
2026_MCL_357558_1
MCL/GM/HA/EnM/ e-Tender/25-26/204 Dt. 26.03.26
Open Tender
Electrical and Maintenance Works
365 days
BALRAM OCP
AS PER NIT
5 documents required · 5 mandatory
₹95,400
28 May 2026
27 Mar 2026
17 Apr 2026
27 Mar 2026
15 Apr 2026
30 Mar 2026
27 Mar 2026 - 3 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item Description/ Heading | |||||
| 2Fabrication & Erection of new Pontoon (8 m x 6 m) containing 80 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm), MS channel (150 mm x 75 mm) and MS sheet (2 mm thick and 8 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 3Fabrication & Erection of new Pontoon (7.5 m x 6 m) containing 72 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6mm and 50 mm x 50 mm x 6 mm), MS channel (175 mm x 75 mm) and MS sheet (2 mm thick and 7.5 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 4Fabrication & Erection of new Pontoon (6 m x 6 m) containing 60 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm), MS channel (150 mm x 75 mm) and MS sheet (2 mm thick and 6 m x 6 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 5Fabrication & Erection of new Pontoon (3 m x 2.4 m) containing 12 drums of 210 litre HDPE barrel using MS angle (65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm) and MS sheet (2 mm thick and 3 m x 2.4 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 6Fabrication & Erection of new Pontoon (2 m x 1.2 m) containing 06 drums of 210 litre HDPE barrel using MS angle 65 mm x 65 mm x 6 mm and 50 mm x 50 mm x 6 mm) and MS sheet (2 mm thick and 2 m x 1.2 m size) and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 7Repairing of Old damaged 60 drum of 210 litre HDPE barrel using MS angle, MS channel and MS sheet and applying a priming coat of approved steel primer all complete as per requirement and instruction of Engr. I/C. | |||||
| 8Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.27 MB
Tendernotice_2.pdf
PDF • 0.74 MB
BOQ_370415.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid