| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 CrAccepted-AOC | ₹19.1 Cr | L1 | Accepted-AOC Being Lowest Bidder and Reasonable Bid |
| 2 | L2₹21.3 Cr+₹2.3 Cr (11.9%)Rejected-Finance 54 AKASH DEEP COLONY CHAKRATA ROAD DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹21.3 Cr+₹2.3 Cr (11.9%) | L2 | Rejected-Finance Other than lowest Bidder |
| 3 | L3₹22.8 Cr+₹3.7 Cr (19.4%)Rejected-Finance 200 C P COLONY MORAR GWALIOR M P 474006 | GWALIOR | GWALIOR | MADHYA PRADESH | 474006 | ₹22.8 Cr+₹3.7 Cr (19.4%) | L3 | Rejected-Finance Other than lowest Bidder |
| 4 | L4₹23.4 Cr+₹4.3 Cr (22.6%)Rejected-Finance 14 KISHANGARH WEST IDGAH AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | ₹23.4 Cr+₹4.3 Cr (22.6%) | L4 | Rejected-Finance Other than lowest Bidder |
| 5 | L5₹23.8 Cr+₹4.7 Cr (24.6%)Rejected-Finance 61 LAALA LAJPAT RAI COLONY BHOPAL M P 462023 | BHOPAL | MADHYA PRADESH | 462023 | ₹23.8 Cr+₹4.7 Cr (24.6%) | L5 | Rejected-Finance Other than lowest Bidder |
| Sl No | Description | Qty | Unit | M/S SURAT SINGH AND SONS L2 | Raja enterprises L6 | JASPAL SINGH & CONST L4 | ATUL CONSTRUCTION CO. L3 | M/s Khialdas Constructions L1 | SHREE KRISHNA INFRASTRUCTURE L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Note:-Please refer schedule 'A' notes before quoting the tender. | |||||||||
| 2.00GENERAL SUMMARY | |||||||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part- I (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 13,59,99,999 ₹13,59,99,999 | 18,20,00,000 ₹18,20,00,000 | 15,37,00,000 ₹15,37,00,000 | 14,19,36,786 ₹14,19,36,786 | 12,59,99,952.1 ₹12,59,99,952.1 Lowest | 15,30,00,000 ₹15,30,00,000 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,69,999 ₹1,69,999 | 1,50,000 ₹1,50,000 | 1,44,481.3 ₹1,44,481.3 Lowest | 1,61,918.76 ₹1,61,918.76 | 1,65,425 ₹1,65,425 | 1,80,000 ₹1,80,000 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part- III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 14,99,999 ₹14,99,999 | 17,50,000 ₹17,50,000 | 14,12,090 ₹14,12,090 Lowest | 15,18,376.45 ₹15,18,376.45 | 18,90,000 ₹18,90,000 | 14,40,000 ₹14,40,000 |
| 2.04 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 5,29,999 ₹5,29,999 | 7,69,000 ₹7,69,000 | 5,00,253.3 ₹5,00,253.3 Lowest | 6,03,754.2 ₹6,03,754.2 | 6,93,825 ₹6,93,825 | 6,30,000 ₹6,30,000 |
| 2.05 | Lump sum price worked out by the contractor for EXTERNAL ELETRIC SUPPLY WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 23,49,999 ₹23,49,999 | 24,50,000 ₹24,50,000 | 21,14,785.25 ₹21,14,785.25 Lowest | 25,01,359.03 ₹25,01,359.03 | 23,40,000 ₹23,40,000 | 30,60,000 ₹30,60,000 |
| 2.06 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,89,99,999 ₹1,89,99,999 | 1,91,62,000 ₹1,91,62,000 | 1,81,82,033.42 ₹1,81,82,033.42 | 1,94,80,750.09 ₹1,94,80,750.09 | 1,44,00,000 ₹1,44,00,000 Lowest | 1,89,90,000 ₹1,89,90,000 |
| 2.07 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 49,99,999 ₹49,99,999 | 56,20,000 ₹56,20,000 | 51,53,853.27 ₹51,53,853.27 | 52,64,688.84 ₹52,64,688.84 | 37,84,030 ₹37,84,030 Lowest | 45,00,000 ₹45,00,000 |
| 2.08 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL AND RCC SEPTIC TANK WORKS as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 5,99,999 ₹5,99,999 | 6,45,000 ₹6,45,000 | 5,24,150.05 ₹5,24,150.05 | 5,63,602.31 ₹5,63,602.31 | 3,36,180 ₹3,36,180 Lowest | 6,03,000 ₹6,03,000 |
Tender Value
₹22.3 Cr
EMD Value
₹14.4 L
Closing Date
17 Dec 2025, 6:00 pmClosed
Chief Engineer Bhopal Zone
HQ CHIEF ENGR BHOPAL ZONE, MES SI LINE BHOPAL 462001
PROVN OF OTM ACCN (KLP) FOR ASC (SUP) AT MILITARY STATION BHOPAL UNDER GE DRONACHAL
2025_MES_739316_1
CA NO. CEBZ/ BPL /TOKEN/ 22 OF 2025-26
Open Tender
Civil Works
Lump-sum
730 days
Bhopal
As per NIT
4 documents required · 4 mandatory
₹3,000
GE DRONACHAL
₹14.4 L
Bhopal
1 Jul 2026
11 Nov 2025
19 Dec 2025
11 Nov 2025
17 Dec 2025
10 Dec 2025
21 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part- I (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 13,21,72,800 | ₹13,21,72,800 |
| 2.02 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,24,552.89 | ₹1,24,552.89 |
| 2.03 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part- III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 15,18,376.45 | ₹15,18,376.45 |
| 2.04 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 4,31,253 | ₹4,31,253 |
| 2.05 | Lump sum price worked out by the contractor for EXTERNAL ELETRIC SUPPLY WORKS as listed in Schedule ‘A’ Part- V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 22,73,962.75 | ₹22,73,962.75 |
| 2.06 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,16,45,277.88 | ₹2,16,45,277.88 |
| 2.07 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 55,41,777.73 | ₹55,41,777.73 |
| 2.08 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 2,84,950.76 | ₹2,84,950.76 |
| 2.09 | Lump sum price worked out by the contractor for COMPOUND WALL FENCING AND GATE WORKS as listed in Schedule ‘A’ Part-IX (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,48,70,420.68 | ₹1,48,70,420.68 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
BOQ_827835.xls
BOQ • 2.33 MB
Drawings.pdf
Additional Documents • 26.90 MB
tender.pdf
Tender Documents • 2.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .