Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.6 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹98.7 L+₹2.9 L (3.05%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹99.0 L+₹3.2 L (3.35%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹99.4 L+₹3.6 L (3.77%)Rejected-Finance COLABA MUMBAI | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹99.9 L+₹4.1 L (4.33%)Rejected-Finance PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
1 Aug 2023, 6:00 pmClosed
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
CARRYING OUT REPAIRS ROUTINE MAINTENANCE MAKE MONARCH OF LIFTS IN KARTIKEYA GEMINI ROHINI REVATI ARCHANA SARVANA VISWAKARMA J BLOCK K BLOCK ALAKANANDHA BHARANI AND VATSALA AT NOFRA INCLUDING MANNING AND OPERATION OF LIFTS UNDER GE (NW) NOFRA COLABA
2023_MES_606080_1
8760/CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) NOFRA
Class C
8 documents required · 8 mandatory
₹1,000
Yes
GE (NW) NOFRA
₹1.6 L
Yes
26 Aug 2023
27 Jun 2023
3 Aug 2023
27 Jun 2023
1 Aug 2023
18 Jul 2023
27 Jun 2023 - 15 Jul 2023
Amount
Repair/maintenance of lifts including carrying out daily check and periodical services of fully automatic electrical lift with power operated door, simplex collective control system with repair/maintenance of unserviceable damaged parts such as bearings, bushes, all type of guide shoes, headers, hangers, door ropes,door cards,car door sills, landing door sills, door locks, control cards, and its contacts, hall push buttons and its spares, connector/links, welding of cracked /broken and mild steel parts, Landing operating Panel of any size and capacity, repairs /maintenance of unserviceable damaged door safety edge and sensor mechanical safety lock, magnetic lock or contact, car position indicator, and all connected accessories, necessary wiring of hall push button assembly, repair/maintenance of broken COP/LOP buttons and display, including cover, Fire alarm, Firemen button glass, Intercom, alarm/hooters, Maintenance of damaged hand rail, Shaft, light/switches, complete with illuminated push button and direction indicator with LED display with LPT/ LPC card of stainless steel inclusive of harness wiring for laminating of push button of each floors and cutting wall making good disturbed surface with masonry work to make similar with existing surface & cable as per requirement for safe operation of lifts ,changing of broken granites, fixing of loose rail bracket with necessary masonry work ,cabin, minor repair of cabin light and minor repair of cabin fan , changing of broken anti skid PVC rubber mat and air freshner at lift cabin, ensure safe and smooth functioning of lift and complete maint of car top, binding of loose wire at control panel and rust painting at car top and door and allied parts with testing, dewatering of lift wells in case of any emergency situation all as directed by Engineer-in-Charge. Lift cell:Location- Kartikeya, Gemini, Revati and Rohini 08 PS (544Kg) - 04 Nos lifts
Ditto all as per Ser item No 1.00 above but 06 PS (408 Kgs) capacity in building : Rohini, Revati, Gemini, Kartikaya (G+9 floors) Make: Must be suitable as per existing make at site complete all as directed by Engr-in-Charge Location 04 Nos lift Note for Ser item No 1.00 & 2.00 (i) The contractor has to carry out the AMC of the lifts through OEM only. (ii) The AMC should cover any minor parts of lifts if its functions are found defective the same should be repaired or replaced by the OEM as per the timeline covered under norms as directed by Engr-in-Charge/GE. (iii) One mechanic shall be available round the clock at lift complaint cell for safe & smooth functioning of the lift. (iv) Rewinding of motor if required will be done by the contractor and no extra cost will be given by the department. (v) The detailed duty mechanics of the firm shall report to the JE Concerned at the Lift complaint cell for receiving the complaints at round the clock daily including Sundays and holidays. (vi) The detailed lift mechanics shall sign ( Their shift wise) in the attendence register kept with lift cell. (vii) Duty Mechanics shall be available as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or moved without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall affected.
Dismantling and taking out old unserviceable landing door from various floors & supply and fixing new landing door comprising of 02 No power operated auto telescopic / side opening by horizontal sliding stainless steel panel 800 mm Opening of 1.2 mm thick complete with door suitable for 06 Ps lifts complete all as directed by Engr-in-Charge Locations : Gemini, Kartikeya, Rohini, Revathi
Dismantling and taking out unserviceable car door from car cabin and supply and fixing new car door comprising of 02 No power operated, auto telescopic / centre opening by horizontal sliding stainless steel panel of 800 mm Opening 18 SWG with hairline finish (N-304) flush type panels complete with removable headers, hangers, door drive unit with full beam infrared sensor up to full length of car door, aluminium sill VVVF door drive unit for motor complete with all accessories control connection etc. for 1000 KG Goods lift all as Specified and directed by Engr-in-Charge Locations : Gemini, Kartikeya, Rohini, Revathi
Disconnecting and taking out old/unserviceable Landing push button box along with illuminated call button with control wiring and Supply & Fixing landing push button box complete with stainless steel face plate 2.0 mm thick having 02 push buttons and combined digital position indicator wih arrow indicator complete including cutting to walls for fixing of push button unit including making good to discturbed wall surfaces for 06/08 Passenger Lifts. Make: Must be suitable as per existing make at site complete all as directed by Engr-in-Charge Location: Gemini, Kartikeya, Rohini, Revathi
Disconnecting &taking out defective COP assembly, supply & fixing new COP assembly suitable for lifts (G+09/G+14) floor complete illuminated push button for floor position indicator, alarm, non stop, door close, door open, cabin light, stop attendant out key etc including direction indicator of 7 segment display with CPI card on stainless steel face plate duly connected with existing control and electric system etc, complete 06/08 Passenger Lifts Make: Must be suitable as per existing make at site complete all as directed by Engr-in-Charge Kartikeya, Rohini, Revathi
Disconnecting and taking out old/unserviceable shaft wiring, supply and fixing of shaft wiring in hoist way upto lower limit with PVC insulated copper conductor cable single core, 1100 Volts grade 0.75 Sqmm single core & 1.0 Sqmm for earth wire duly bunched with wire binding locking strip, drawing through in and including galvanised sheet metal trunking of 24 SWG up to ground floor in hoist for control to all function including in built connection for control panel, PCB, Hall push button, fire switch and lower limit switch all at G+09/G+14 floors 06/08 Passenger Lifts complete all as specified and directed by the Engr-in-charge Location:Gemini, Kartikeya, Rohini, Revathi
Disconnecting and taking out unserviceable Governor steel wire rope after disconnecting from car cabin, supply and fixing in steel wire rope 8 mm dia ungalvanised 08/19 construction in and including necessary connection with machine room and shaft pit complete with clamp nuts bolts and washers complete all as specified and as directed by the Engr-in-charge. Location : Gemini, Kartikeya, Revathi, Rohini
Dismantling existing lift car and supply and fixing new car made of stainless steel hair line finish, 1.5 mm thick, SS 304 grade, as per existing size, arrangement to fix car door operator, made of MS sheet platform covered with 5 mm thick aluminium flooring, SS false ceiling with LED lights, Fan, etc for 08 Passenger Lifts complete all as specified and directed by Engineer-in-Charge. Locations :Gemini and Kartikeya
Disconnecting and taking out unserviceable Main steel wire rope after disconnecting from car cabin supply and fixing main steel wire rope 13 mm dia ungalvanised 08/19 construction in and including necessary connection with machine room and shaft pit complete with clamp nut bolt and washers complete all as specified and directed by Engr-in-charge.Location : Gemini, Kartikeya, Revathi, Rohini
Dismantling and taking out all defective batteries from existing ARD and supply and fixing new maintenance free batteries suitable for ARD including necessary connection like battery terminals of brass and copper lead heavy duty to connect the battery terminal of 12 VDC, 18 AH complete all as specified and directed by Engr-in-charge Location: Kartikeya
Taking down old car door VVVF drive and supply and fixing in replacement car door (VVVF) drive with all accessories confirming to IS and match with existing model, specifications and same capacity of exisiting items complete all as specified and directed by Engineer-in-Charge.
Dismantling and taking out unserviceable travelling cable from hoistway & supply and fixing new travelling cable PVC insulated 12 Core fla round type with standard copper conductor, 1100 volts grade of size 0.75 sqmm conforming to relavent IS in and including thimbles, suspended type freely move with car cabin up and down movement between ground and upper floors including necessary proper connection with mid way junction and other connection require in circuit complete all as specified and as directed; Location Gemini, Kartikeya, Revathi, Rohini
Manning & operation of electrically operated lift 08 passenger/ 13 passenger (544/ 884Kg) and 1000/ 2000Kgs Goods lift to serve upto G+12 upper floors (Bharani, Sarvana),G+15 floors (Archana), G+14 upper floors (Alakhnanda), G+16 floors (Jyestha & Danistha), 6/8 passenger (408/544/ Kg) capacity of Thyssenkrupp/Escon make to serve upto G+9 upper floors in Rohini, Revati, Kartikeya, Gemini, Viswakarma and Vatsala daily 16 hrs in two shift from 0600 hrs to 1400 hrs and from 1400 to 2200 hrs including taking care of from any pilfrerage/ theft or damage etc, complete all as directed by Engineer-in-Charge in Bldgs :Bharani, Alakhnanda, Archana,Sarvana, Gemini, Kartikeya, Revati,Rohini, J Block K Block, Viswakarma and Vatsala bldgs (Total- 12 Nos bldgs) Person: 1 for 2 buildings per shift Persons: 6 for 12 buildings per shift Total shifts: 2 Hence (6 persons x 2 shifts x 11 months) = 6 x 2 x 11 = 132
Notes for Ser item No 14.00 (i) Passes will be processed after verification of certificate, Passes shall not be granted without submission of qualification proof & experience certificate for lift operator. In case of OEM, the qualification shall be verified by the Engineer-in-Charge before the issue of passes. (ii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operators. (iii) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (iv) Lift operators report at lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their directions. If he is found absent or moved without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected. (v) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (vi) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell. (vii) In case of any necessity for rescue operation or in emergency situations, lift operator shall be capable of rescuing the passengers and reacting to the situation (in emergency situations) Rescue operator engaged for rescue operation shall immediately attend the complaint within 30 minutes failing which penalty at Rs 500/- per hour or part thereof shall be levied.
(viii) Contractor shall submit the labour licenece as applicable as per latest laws/acts & Copy of GST Regn registered number issued by concerned authority. (ix) Insurance coverage, compensation if any applicable or necessitated due to mis operation of lift shall be the responsibility of contractor. The quantum of compensation shall be assessed based on the BOO composing of Lift Inspector of Maharashtra State, representatives of both agencies carrying out M&O works and routine maintenance work of lift and members from department. (x) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest laws/acts alongwith RAR failing which RAR will not be progressed for payment. (xi) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable. (xii) Lift attendant (semi skilled ) duly trained for Each shift (xiii) Rescue operator having 10 th pass with atleast 02 years practical experience shall possess thorough knowledge to rescue user in case of emergency like anybody getting trapped in lifts (Rescue operator for all building- Each shift)
(xiv) The bidders are advised not to quote rate less than minimum fair wages as circulated by competent authority . If the quoted amount is less than the estimated cost item No 14.00 i.e Rs. 49,02,480.00. the lowest bidder will have to depost FDR/BGB as elaborated herein after in favour of Accepting Officer within 07 days of opening of financial bid (cover No 2). (xv) The deposited amount shall be the difference between estimated cost i.e Rs. 49,02,480.00 and amount quoted by lowest bidder for respective item. FDR/BGB shall be released only after satisfactory completion of work. If the contractor fails to pay minimum wages to employees, the department shall have right to with hold the said amount which will be verified by GE. The decision of Accepting Officer regarding amount to be withheld shall be final and binding. The withheld amount will be utilised by GE for payment to employees if contractor fails to pay minimum wages and balance amount if any shall only be released. If the lowest bidder fails to deposit the amount as stated above within 07 days, the contractor shall be banned for 06 months & his bid shall be rejected. The contractor shall submit 03 Nos of BGNs/FDRs of equal amount as mentioned above. The BGBs/FDRs validity shall be for 04 months, 08 month & 12 months respectively for the purpose of encashment release as the case may be. (xvi) The rates quoted shall be inclusive of suitable reliver whenever necessary as required and directed by the Engineer in charge.
Escon Elevators Pvt Ltd
Shree Elevator Engineering Co.
Veer High Tech Solution
shakti engineering and electrical works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .