Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.5 CrAccepted-AOC 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | ₹31.5 Cr | L-1 | Accepted-AOC RESPONSIVE |
| 2 | L-2₹33.2 CrRejected-Finance 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | ₹33.2 Cr | L-2 | Rejected-Finance NON RESPONSIVE |
| 3 | L-3₹34.1 CrRejected-Finance | ₹34.1 Cr | L-3 | Rejected-Finance NON RESPONSIVE |
| 4 | L-4₹34.8 CrRejected-Finance KOTHI NO 6 CIVIL LINES OPP TB TOWER DISTRICT MORADABAD UTTAR PRADESH | MORADABAD | UTTAR PRADESH | 244001 | ₹34.8 Cr | L-4 | Rejected-Finance NON RESPOSNIVE |
| 5 | L-5₹35.8 CrRejected-Finance | ₹35.8 Cr | L-5 | Rejected-Finance NON RESPOSNIVE |
Tender Value
₹49.7 Cr
EMD Value
₹50 L
Closing Date
15 Feb 2025, 12:00 pmClosed
SE MBD CIRCLE PWD MORADABAD
SE MBD CIRCLE PWD MORADABAD
Year 2024-25 Widening and strengthening of 2 lanes with paved shoulders (10 m) of Moradabad Gwan Bulandshahr road (including Anupshahr-Divai part) SH-148 from Km 40 (590) to Km 61 (570).
2025_CEMBD_1002765_1
7717/E-Nivida-MBD Circle/24-25 DT 09-12-2024
Open Tender
Civil Works - Roads
455 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹50 L
Yes
SE MBD CIRCLE PWD MORADABAD
4 Apr 2025
6 Feb 2025
15 Feb 2025
6 Feb 2025
15 Feb 2025
6 Feb 2025
12 Feb 2025
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Construction of Embankment with approved material obtained form borrow pits with all lifts and leads, transporting 2 km upto site, spreading, grading to required slope and compecting to meet requirement of table 300-2. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion SS2 Stab. 3.5% and OPC Cement @1% by wet of mix. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing and laying dense graded bituminous macadam grade-1 with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing and laying dense graded bituminous macadam grade-II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40@ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Construction of un-reinforced, dowel jointed, controled cement concrete M-40 grade pavement over a prepared sub base with 43 grade cement @ 400 kg minimum per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing for IRC: 15 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Excavation in foundation in ordinary soil (loan, clay or sand) including lift up to 1.5 m and lead up to 30m and including filling waterning and ramming of excavated earth in to the trenches or in to the space in to the building and the side of foundation tranches.3 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floors and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for proper completion of the work. SI No- 281 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1 as per direction of the Engineer-in-Charge including cost of all materials, labour T&P etc. required and including watering & ramming for proper completion of work. and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge. for proper complection of the work. (SI No - 307-309) and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Supply and laying 600 mm dia NP-4 Hume pipe SI No- Chp 1 new item (1) and Chp 18 Item no 1(5) and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Supply and laying 1000 mm dia NP-4 Hume pipe SI No- Chp 1 new item (1) and Chp 18 Item no 1(5) and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work including supply of all materials labour and completion of work. Si No 574 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Concrete with 2 cm guage stone grit instead 4cm guage stone ballastof fine sand of 1.25 F.M and cement in proportion of 1:2:4 in foundation and under floors and incliding supply of all meterial T&P and labour cess etc. as per direction of Engineer in charge.required for proper completion of the work. (SI No- 279 A) and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Applying primer coat over new steel and other metal surface after paint including preparing the surface by thoroughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes fine steel/ wood scrappers and over new wood work and on plastered surfac sand paparing and knotting including coat of all and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. SI No Chp 15 New Item 1 b
Painting two coat over priming coat (but excluding cost of priming coat) on wood or steel and other metal surface with superior synthetic enamel paint of standared make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand paparing and stripping including cost matter and scoured with wire brushes fine steel/ wood scrappers sand papering and knotting including coat of all and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. SI No Chp 15 New Item 2+4(ii)
R.C.C. Work with cement approved coarse sand and 2cm. gauge approved stone grit in proportion of 1:2:4 in lintels of doors, windows and sunshades excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all meterials, labour and T&P etc. required for proper completion of work. Binding wire of supplied by the contractor free of cost. SI No- 283 (A) and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
RCC Grade M25 using batching plant transit mixer & manual placing 12.8 1500, 1700 & 2100 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications as per MORT&H Specification Section 1600 & 2200 and including all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T.
M/S A B INFRAZONE PRIVATE LIMITED (BID ID -4956853)
DR Buildestate Private Ltd (BID ID -4952055)
M/S M A DEVELOPERS AND ENGINEERS (BID ID -4957643)
Krishna Infratec (BID ID -4962423)
Shri Krishna And Company (BID ID -4951000)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid