Loading…
Loading…
Tender Value
₹19.3 L
EMD Value
₹38,700
Closing Date
10 Oct 2026, 5:00 pm
Executive Engineer, RMC
RMC
Constriction of PCC road and RCC Drain in Haider Ali Colony from Sudhir Toppo house to Anm Toppo house under war No-08
2026_UDD_119275_1
335/eng 2026
Open Tender
Civil Works
Works
90 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹38,700
28 Sept 2026
28 Sept 2026
12 Oct 2026
28 Sept 2026
10 Oct 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Providing man days for site clearence before and after the work etc. | 8 | Each | 326.85 | ₹2,614.8 |
| 2 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. | 203.94 | m3 | 151.82 | ₹30,962.17 |
| 3 | Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.) | 61.26 | m3 | 347.85 | ₹21,309.29 |
| 4 | Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 76.11 | m3 | 1,756.4 | ₹1,33,679.6 |
| 5 | Reinforced cement concrete work in walls (any thickness) including atteched plasters, buttresses plinth and string course, fillets, columns, pillars, piers, abutments, post, and struts etc above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement.RCC
1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | 41.15 | m3 | 6,082.45 | ₹2,50,292.82 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level : 1:1½:3 (1 cemet : 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20mm nominal size ) | 70.69 | M³ | 4,961.73 | ₹3,50,744.69 |
| 7 | Renforced cement conrete work in beams, suspended floors, having slopeup to 15' landing, balconies, shelves, chajjas, lintels, bands, plain windowsill ---------do----do-------E/I
1:1.5:3 (1 Cement : 1.5 coarse sand zone(III): 3 graded stone aggregate 20mm nominal size) | 22.13 | m3 | 6,308.87 | ₹1,39,615.29 |
| 8 | Providing Tor steel reinforcement of 10 mm,12mm &16mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
08mm dia 40% | 2.09 | M.T. | 83,314.02 | ₹1,74,042.99 |
| 9 | 10mm dia 60% | 3.13 | M.T. | 82,096.54 | ₹2,57,290.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_161425.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .