Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹19,480
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer Irrigation Division Tral
Executive Engineer Irrigation Division Tral
Grata Khul/ Bud Khul Const. of flood protection bund at from RD 180 m onwards
2026_IFC_321191_3
e NIT No 06 of 2026-27
Open Tender
Civil Works
Percentage
25 days
Irrigation Division Tral
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Irrigation Division Tral
₹19,480
17 Aug 2026
17 Aug 2026
9 Sept 2026
17 Aug 2026
8 Sept 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 166 | Cum | 592.9 | ₹98,421.4 |
| 2 | Supply of stones(Nallah) | 18.36 | Cum | 927.28 | ₹17,024.86 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering.
All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 97.2 | Cum | 6,591.25 | ₹6,40,669.5 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 432 | Sqm | 286.35 | ₹1,23,703.2 |
| 6Carriage of material by mechanical transport, from source to road site / actual site of work including loading / unloading and stacking | |||||
| 6.1 | Stone aggregate 20mm avg lead 5km | 82.62 | Cum | 218.19 | ₹18,026.86 |
| 6.2 | Sand avg lead 15 km | 41.31 | Cum | 344.19 | ₹14,218.49 |
| 6.3 | Stone (Nallah) 6km | 18.36 | Cum | 254.59 | ₹4,674.27 |
| 6.4 | Cement avg lead 1 km | 31.1 | MT | 114.44 | ₹3,559.08 |
| 7Carriage of material by Manual Means from road site / source to actual site of work including loading, unloading and stacking | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_1071705.xls
BOQ • 0.25 MB
corrigendumnit0626.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].