| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.0 LAccepted-AOC CAMP Q NO H 54 WARD NO 17 HALLOW BLOCK KOTMA COLLIERY DIST ANUPPUR MP | KOTMA | ANUPPUR | MADHYA PRADESH | 1 | Accepted-AOC Accepted as L1 bidder and work is divided 50 percent to each L1 bidder. Awarded amount is including GST. | |
| 2 | 1₹34.0 LAccepted-AOC CAMP VILLAGE DEVGAI POST KUDRI SHADOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | 1 | Accepted-AOC Accepted as L1 bidder and work is divided 50 percent to each L1 bidder. Awarded amount is including GST. | |
| 3 | 2₹59.3 L+₹1.7 L (2.92%)Rejected-Finance | 2 | Rejected-Finance Rejected as L2 Bidder. |
Tender Value
₹98.2 L
EMD Value
₹1.2 L
Closing Date
21 Aug 2023, 11:00 amClosed
General Manager(Oprn.), JK Area
Office of The General Manager(Oprn.), JK Area, P.O-Jamuna Colliery, Dist. Anuppur (MP), Pin-484444, SECL, Bilaspur BILASPUR
Wet drilling of holes in the roof/sides by providing 03 Nos Hydraulic power pack drilling arrangement and loading, Transporting, Unloading and laying, fixing/joint 2 inch water supply MS/GI pipeline in 40LE/19D, 37LW/19D and 34LE/19D in Bartarai
2023_SECL_285039_1
SECL/JK/GM(O)/2023-24/eT/19 Dated 04.08.2023
Open Tender
Miscellaneous Works
Item Rate
305 days
Bartarai Colliery, Amadand UG Sub Area, JK Area
AS PER NIT
5 documents required · 5 mandatory
₹1.2 L
23 Oct 2023
4 Aug 2023
22 Aug 2023
4 Aug 2023
21 Aug 2023
5 Aug 2023
5 Aug 2023 - 14 Aug 2023
Amount
Hiring of 03 Nos. DGMS approved portable hydraulic wet drilling arrangement drill 1.5 to 1.8 Mtr long hole drill in roof/sides in UG gallery of roof bolts with resin capsule and fitting of bearing plate & tightening of nut bolts grouted should be complete with the test as per DGMS CIRCULAR (Dia of hole 27MM, Depth of hole-1.50 to 1.8 Mtr for roof bolting). Junction support roof bolt grouting should be completed with W-strap. Particulars: 1. Roof bolt rod, bearing plate,nut, resin capsule, electric power & water will be provided by department on free of cost. 2. Transportation of roof bolts, rod, W-strap, bearing plate, nuts, resin capsule, power cable, water hoses & shifting of power pack shall be done by the contractor. 3. Hydraulic hoses, water pump for wet drilling & hoses from power pack to drill machine shall be supplied by contractor. 4. Hydraulic oil for power pack shall be supplied by contractor. 5. Hydraulic drill machine with power pack, drill rod, drill bits & other necesary parts/hoses etc. of the mechanised hydraullic drilling machine required there in will be done by contractor. 6. All maintenance & related shifting will be done by contractor. 7. All electricals installation like switch/control panel cabel will be done by contractor. 8. Contractor will deploy workers as required under the provision of Mines Act 1952 and will be resposible to follow the provisions of CMR/CMPF/CMPS and other applicable laws and by laws. 9. Assistance in anchoring testing of 10% installation roof bolt.Anchoring machine will be provided by company & manpower will be provided by contractor. 10.Contractor will install 03 nos. of hydraulic power pack machine in well maintained condition so as to cater all the working faces.He will also provide sufficient no. of manpower in all the shifts for the purpose. 11. 2" pipe provided by departmentally. 12. Total Manpower required for completed the work:- 4076 Nos. Manpower
Transportation, loading, unloading, stacking of M/S /G.I. pipes from surface to UG at working site.
Laying & fitting of pipes in U/G galleries including carrying manually from track end/lift up to 100 Mtr and joining etc. complete (with all complete work.)
Total impact of GST for the purpose of CTC
RAVI KUMAR JAISWAL
PARMANAND KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .