Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.3 L
EMD Value
₹4,500
Closing Date
22 Jul 2025, 3:00 pmClosed
Bdo,Gandarvakkottai
Pt.Union Office,Gandarvakkottai
Package No. 1 Renovation of Building 2 Nos at Kattunaval PUMS in Kattunaval Panchayat
2025_RDTN_583756_1
Gkt/A2/4986/2024/SIUS--1
Open Tender
Civil Works
Item Rate
180 days
Gandarvakkottai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,500
Yes
26 Jul 2025
19 Jul 2025
22 Jul 2025
19 Jul 2025
22 Jul 2025
19 Jul 2025
Amount
Renovation of School Building RCC Roof PUMS East Facing 3 class room at kattunaval in Kattunaval Panchayat.
Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28))
pointing with Cement Mortor 1:3 Mix to full depth of tiiles including cost and conveyance of all materials to wrok site including all labour charges etc, complete
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (20% New Tiles)
Cipping of concrete and roughening the surface and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0036 (Page-28))
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Chappal Rack
Brick Masonry IN CM 1:5 mix using courntry bricks of size 83/4x41/4x23/4 incluidng cost and conveyance and all labour charges etc., complete - 1 CU.M
PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Provsion for Cudappa slab For Chappel rock etc complete
Renovation of School Building RCC Roof PUMS North Facing 2 class room at kattunaval in Kattunaval Panchayat
Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28))
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (20% New Tiles)
Cipping of concrete and roughening the surface and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0036 (Page-28))
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Chappal Rack
Brick Masonry IN CM 1:5 mix using courntry bricks of size 83/4x41/4x23/4 incluidng cost and conveyance and all labour charges etc., complete - 1 CU.M
PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Provsion for Cudappa slab For Chappel rock etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 47 of Section 2 of Instruction to Bidders (ITB) of SBD)
K. SARAVANAN (BID ID -1408834)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .