Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-Finance | ₹2.5 L | 1 | Accepted-Finance L1 |
| 2 | 2₹2.5 L+₹1,928.86 (0.77%)Accepted-Finance | ₹2.5 L+₹1,928.86 (0.77%) | 2 | Accepted-Finance L2 |
Tender Value
₹2.4 L
EMD Value
₹13,000
Closing Date
3 Mar 2026, 9:00 amClosed
EE Rampur
EE B and R Division HPPWD Rampur
SH loading, unloading, haulage, providing unskilled labour and excavating machinery
2026_PWD_129614_1
PW/RMP/TA/2025-12979 dated 23.02.2026
Open Tender
Civil Works - Bridges
Percentage
EE B and R Division HPPWD Rampur
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
Yes
₹13,000
Yes
20 Apr 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
25 Feb 2026 - 3 Mar 2026
Hiring of crane/Hydra for loading and unloading of biley bridge (80 feet DSR standard width load class 40R) parts at mechenical workshop Nogli and Ganvi site of work incluidng cost of fuel oil lubricant and wages of operating staffl. any repair/breakage during operation will be absolute responsibility of contractor/owner at his own risk. Shifting of machinary from one place to other place will be absolute responsibility of the contractor and no payment will be made for the same. only actual working hours will be accounted for the payment including all leads and lifts to the entire satisfactions and directions of Engineer-in-charge.
Haulage of all parts of Bailey Bridge (80 feet DSR standard width load class 40R) form mechenical work shop Nogli to site of work at Ganvi in tipper, truck etc. complete including all taxes to the entire satisfaction and direction of Engineer-in-charge.
Hiring of unskilled labour for launching of bailey bridge (80 feet DSR standard width load class 40 R) at Ganvi in the supervision of HPPWD mechanical wing complete to the enitre satisfaction and direction of Engineer-in-charge.
Hiring of earth cutting/excavating machinary of 0.75 cubic meter bucket capacity @ 45 cubic meter per hour loading capacity to be deployed for earth cutting/excavation/ filling/slips and clearance of blocked side drain etc. including cost of fuel oil lubricant and wages of operating staff. any repair/ breakage during operation will be absolute responsibility of contractor/owner at his own risk. Shifting of machinary from one place to other place will be absolute responsibility of the contractor and no payment will be made for the same. Only actual working hours will be accounted for the payment. Cutting in earth work/removal of slips in all kinds of soil including loading in tipper/ truck, removal/disposal of the same in all leads and lifts to the entire satisfactions and directions of Engineer-in-Charge.
stage.html
html • 0.03 MB
techsummary_191625.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
SBD.pdf
Tender Documents • 2.81 MB
BOQ_191625.xls
BOQ • 2.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .