| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.1 LAccepted-AOC 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | ₹86.1 L Quoted ₹92.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹92.9 LRejected-Finance GARUI PASCHIM PARA KOLKATA 700065 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700065 | ₹92.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹94.2 LRejected-Finance ALAMPUR NODAKHALI | ₹94.2 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | S. P. CONSTRUCTION L3 | SARKAR ELECTRICAL L2 | H. DEY ELECTRIC STORES L1 |
|---|---|---|---|---|---|---|
| 1.00All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. | 23,000 | Mtr | 3 ₹69,000 | 2.96 ₹68,080 | 2.91 ₹66,930 |
| 3.00 | Carrying of departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC. | 1 | Item | 27,500 ₹27,500 | 27,200 ₹27,200 | 27,000 ₹27,000 |
| 4.00 | Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 01.01.2025 including proper earthing arrangement complete as per direction of EIC. | 35 | Sets | 1,466 ₹51,310 | 1,459 ₹51,065 | 1,454 ₹50,890 |
| 5.00 | Installation of following main switches and changeover switches as per direction of EIC (Main switches and change over switch will be supplied departmentally).
a) 100 Amps. 415 volt TPN (Main switch)
b) 100 Amps. 415 volt (change over switch)
c) 63 Amps. 415 volt (do) 40 nos
d) 63 Amps. 415 volt TPN (Main switch)
e) 32 Amps. 415 volt TPN (Main switch) | 40 | Nos | 103 ₹4,120 | 101 ₹4,040 | 99 ₹3,960 |
| 6.00 | Maintenance of controlling station by engaging skilled labour for operation of the controlling switch from 01.01.2026 to 17.01.2026 as per direction. | 1 | Item | 24,550 ₹24,550 | 24,460 ₹24,460 | 24,100 ₹24,100 |
| 7.00 | Drawing the power line from substation to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. Accessories of the temporary Controlling station. | 40 | Nos | 1,360 ₹54,400 | 1,342 ₹53,680 | 1,336 ₹53,440 |
| 8.00 | Supply on hire bases 4.88 M long 100 mm. Dia (AV) bottom and 50 mm. Dia (AV) top salbollah post and erecting the same at different places as per direction of EIC including excavation of earth and grouting the post as per I.E. rules average distance from post to post is 18 M. | 1,125 | Nos | 37 ₹41,625 | 36 ₹40,500 | 35 ₹39,375 |
| 9.00 | Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.) | 2,100 | Nos | 28 ₹58,800 | 27 ₹56,700 | 26 ₹54,600 |
| 10.00 | Providing Rotary signal lamp on hire basis (colour of lamp should be as per choice of the EIC) & to be fixed on 25 ft long salbollah / bamboo post (materials to be supplied by the agency) & making interconnection all complete as per direction of EIC & taken out the same after completion of Mela. From 05.01.2026 to 16.01.2026 i.e 12 days x 40 nos | 480 | Nos | 54 ₹25,920 | 52 ₹24,960 | 51 ₹24,480 |
Tender Value
Refer Docs
EMD Value
₹1.9 L
Closing Date
16 Dec 2025, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla Kolkata-27
Making temporary illumination arrangement including construction of temporary structure at Ganga Sagar Main Mela Ground in connection with Ganga Sagar Mela - 2026
2025_PHED_926253_10
WBPHE/EE/SMD/NIeT-42 of 2025-26
Open Tender
Electrical Work/ Equipment
60 days
Ganga Sagar
Please refer Tender documents.
7 documents required · 7 mandatory
₹1.9 L
8 Apr 2026
20 Nov 2025
18 Dec 2025
20 Nov 2025
16 Dec 2025
20 Nov 2025
Amount
Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C.
Carrying of departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 01.01.2025 including proper earthing arrangement complete as per direction of EIC.
Installation of following main switches and changeover switches as per direction of EIC (Main switches and change over switch will be supplied departmentally). a) 100 Amps. 415 volt TPN (Main switch) b) 100 Amps. 415 volt (change over switch) c) 63 Amps. 415 volt (do) 40 nos d) 63 Amps. 415 volt TPN (Main switch) e) 32 Amps. 415 volt TPN (Main switch)
Maintenance of controlling station by engaging skilled labour for operation of the controlling switch from 01.01.2026 to 17.01.2026 as per direction.
Drawing the power line from substation to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. Accessories of the temporary Controlling station.
Supply on hire bases 4.88 M long 100 mm. Dia (AV) bottom and 50 mm. Dia (AV) top salbollah post and erecting the same at different places as per direction of EIC including excavation of earth and grouting the post as per I.E. rules average distance from post to post is 18 M.
Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.)
Providing Rotary signal lamp on hire basis (colour of lamp should be as per choice of the EIC) & to be fixed on 25 ft long salbollah / bamboo post (materials to be supplied by the agency) & making interconnection all complete as per direction of EIC & taken out the same after completion of Mela. From 05.01.2026 to 16.01.2026 i.e 12 days x 40 nos
Fixing of 18W/21W/36W CFL lamp at different places from the different feeder line to mela ground as per direction of EIC with supplying on hire basis 7/20 PVC insulated aluminum wire and plastic flexible wire for looping and all other necessary materials required to complete the work[damaged materials will have to be replaced by the agency at their own cost] as per direction of EIC from 06.01.2026 to 17.01.2026 = 12 days x 2,500 Pts
Drawing of flood light points on PCC poles and salbollah post from different feeder line to roads, sea beach, latrine at different places in mela ground and outside mela ground as directed by EIC with the supply of 400 W. SON lamp and fixture and 400 watt. Sodium vapour lamp with shade including 7/20 PVC flexible wire for looping and all other required materials complete (damage materials will have to be replaced by the agency at their own cost from 03.01.2026 to 17.01.2026 = 15 days.
From 03-01-2026 to 09-01-2026=9days x 125 pts
From 10-01-2026 to 17-01-2026=8days x 215 pts
Drawing tube light points from different feeder line to different places on salbollah/Bamboo post inside and outside Mela ground and link road of pilgrim shed as per direction of EIC with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 05.01.2026 to 17.01.2026 = 13 days x 2,700 pts.
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis
Drawing barricade light points from nearest feeder line to end of the barricade from bathing area in both side of the sea as per direction of EIC with supply on hire basis 40 watt coloured red lamp, holder wire, (as required) and controlling main switch etc. including all protection for avoiding any kind of accident as per IE rules (Damaged materials will have to be replaced by the agency at their own cost) from 07.01.2026 to 15.01.2026= 9 days x 50 pts.
Making automatic signal in each point /fire brigade station by specials arrangement with supplying on hire flexible LED rope light on iron ring structure including supplying all required materials to complete the work as per direction of EIC from 05.01.2026 to 17.01.2026.
For Fire brigade station = 11 Nos.
For fire hydrant spout
Fitting fixing of LED board/glow sign Board on suitable position at different places of main mela ground i.e., mela office, hospital, pilgrim shed, temple, NGO and toilets complete as per direction of EIC from 05.01.2025 to 17.01.2025 (LED board/glow sign Board will be supplied from dept. store.)
Dismantling and storage the LED board/glow sign Board from different places i.e., mela office, hospital, pilgrim shed, temple, NGO and toilets complete as per direction of EIC after completeion of mela.
Construction of tower by steel tubular pole with cross arms for four sides 1 meter apart above ground level the tower shall be 11 mtrs. Height x 4 mtrs. Square bottom x 2 m. square top with wooden plank platform by supplying required qty. of steel tubular pipe cross arms horizontal support etc. to complete the above tower on hire basis on or before 05.01.2024 as directed by EIC including drawing all electrical connection and controlling switch on hire basis with all protection to avoid any accident complete as per direction of EIC including decoration of each tower by LED light of required colour maintaining road marking on hire basis and all the tower should be properly earthed as per IE rules. The tower should be constructed as per dept. specification and drawing [Barricade arrangement should be provided around the tower to avoid any accident]
Erection of steel tubular pole inside sea/Latrine area (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 10.01.2025.
Drawing flood light points [in sea/Latrine area] to steel tubular pole (vide item No.19) with supplying and drawing necessary approved brand new PVC insulated wire (660 volt grade) and installation of individual controlling main switch as required on hire basis with fitting fixing of 400 watt. S.V. lamp fixture (son T 400 watt.) Philips make including all necessary accessories complete as per IE rules (Damaged materials will have to be replaced by the agency at their own cost) during Mela period from 05.01.2026 to 16.01.2026 = 12 days x 205 pts.
Carrying charges of luminaries and accessories of fixed type High Mast from Ganga Sagar store to different site i.e. Kiosk cluster, K1 bus stand and K2 bustand by hiring of car and all other necessary arrangement as per requirement
Fitting fixing of the luminaries (9 Nos.) on the lighting tower by engaging skilled technician and laying of the departmental supplied PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC.
Carrying back the luminaries and accessories of fixed type High Mast to Ganga Sagar PHE store after dismantling the luminaries, accessories, cable etc. at by hiring of car and all other necessary arrangement after completion of Mela
Supply and installation on hire basis of temporary fountain with all its accessories i.e. 8 ft fountain frame ring, dom nozzle 50 nos., ring jet nozzle 100 nos. central jet nozzle 1 no., Kirloskar make 5 HP pump 2 nos. and all other necessary materials to complete the work as per direction of EIC from 05.01.2026 to 16.01.2026 including dismantling the same after completion of mela [for PHE mela office and pond near Kapilmuni Temple]
Supply on hire basis and fitting fixing of 9 nos 150 watt fountain light with die cast aluminium toughened glass cover of approve make with epoxy coated MS mounting bracket for fixing of this lamp inside fountain with colour sequence changer for colour changing including connection complete by PVC insulated copper wire, suitable size MCB and other related accessories and also round the clock guarding arrangement from 05.01.2026 to 16.01.2026 including dismantling the same after completion of mela [for PHE mela office, near nut mandir and pond near Kapilmuni Temple]
Fitting fixing the street light fixture on existing PCC pole/tower from different feeder line to different pole inside and outside Mela ground as per direction of EIC with supplying on hire basis 400 watt/250 watt/150 watt/70 watt./400 watt Sodium [Twin] vapour lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 01.01.2026 to 17.01.2026 = 17 days (Damaged materials will have to be replaced by the agency at their own cost, and all the fixture should be of Philips make).
400 watt S.V. lamp = 225 pts. X 17 days
250 watt S.V. lamp = 705 pts. X 17 days
150 watt S.V. lamp = 200 pts. X 17 days
400watt(twin) for tower =21 pts x17 days
400watt(single) SON for tower =84 pts x 17 days
Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different place of road,on hire basis from 01.01.2026 to17.01.2026 (17 days x 310 fittings per day)
Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. [For all CCTV arrangement]
Supply on hire bases 4.88 M long 100 mm.. Dia. (AV). Bamboo post and erecting the same at different places in pilgrim shed as per IE rules and direction of EIC (AV distance from post to post is 20 M.) [For all CCTV arrangement]
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis [For all CCTV arrangement]
Fixing of 18W/21W/36W CFL lamp at different places from the different feeder line to mela ground as per direction of EIC with supplying on hire basis 7/20 PVC insulated aluminum wire and plastic flexible wire for looping and all other necessary materials required to complete the work[damaged materials will have to be replaced by the agency at their own cost] as per direction of EIC from 05.01.2026 to 17.01.2026 = 13 days x 200 Pts [For all CCTV arrangement]
Drawing 250 watt HPSV light on salabollah/ existing post with supplying 250 watt Sodium vapour lamp, fixture, wire, lamp etc as required for the work complete on hire basis from 05-01-2026 to 16-01-2026 = 12 days x 10pts [For all CCTV arrangement]
Drawing ceiling light points from different feeder line to different shed at latrine area as directed by EIC with supply on hire basis 40 watt bulb holder and controlling switch etc. on bamboo post where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 10.01.2026 to 17.01.2026 = 8 days x 300 pts. [For all CCTV arrangement]
Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire by suitable size PVC insulated AL. wire as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C. [For cultural program]
Drawing of flood light points on existing poles with the supply of 400 W. SON lamp including 7/20 PVC flexible wire for looping and all other required materials complete (damage materials will have to be replaced by the agency at their own cost from 05.01.2026 to 16.01.2026 = 12 days. X 3 Points [For cultural program]
Supply & fitting fixing of 2 PIN 5 amps on hire basis from 11-01-2026 to 15-01-2026 [For cultural program]
Making decorative LED lighting arrangement at the function stage with different colour [as per requirement] LED light with all interconnection complete. [For I&CA cultural program]
Drawing tube light points from feeder line to different places on salbollah/Bamboo post with supply on hire basis 40 watt. Tube light complete set etc. with inter connection and controlling switch complete (Damaged materials will have to be replaced by the agency at their own cost) from 11.01.2026 to 15.01.2026 = 5 days x 20 pts. [For cultural program]
Making remote control system on hire basis for inauguration of the lighting system i.e. trident light, high mast light of road No. 2 and temple light of Ganga Sagar Mela by Hon’able MIC, PHE, Dte. at Main Island including necessary interconnection complete
Drawing ceiling light points from different feeder line to different shed at latrine area as directed by EIC with supply on hire basis 40 watt bulb holder and controlling switch etc. on bamboo post where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 08.01.2026 to 17.01.2026 = 10 days x 500 pts.
Beautification arrangement of the Ganga Sagar PHE Mela office with different colour LED Par light, rice light, as per direction of EIC including supply on hire basis of LED display board [subject and design as per EIC] including fitting fixing of the same in front of mela office by suitable arrangement and dismantling of the all arrangement after completion of the mela
Carrying of all accessories of 9 meter long FRP pole i.e. luminaries, bracket and cable etc. FROM Ganga Sagar to site by suitable arrangement including fitting fixing of pole, luminaries and accessories with interconnection complete and dismantling the same after completion of mela with carrying back and storage to the departmental store as per direction of the EIC.
TEMPORARY LIGHTING ARRANGEMENT FROM MASTER SLUICE GATE TO ROAD NO.1 [KALIMANDIR] AT MAIN ISLAND :: Drawing of L.T. distribution line on salbollah/ P.C.C. post by P.V.C insulated aluminum wire of size 16 sq. mm to 50 sq. mm for medium pressure line as per IE rules and ISS by supplying skilled labour and line drawing apparatus etc. and all other necessary materials required to complete the work as per direction of E.I.C.
Fitting fixing the street light fixtures on existing PCC poles from different feeder line to different pole in the road from master sluice gate to road no.1 as per direction of EIC with supplying on line basis 150 watt S.V lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 03-01-2026 to 16-01-2026 = 14 days x 100 pts
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 05.1.2025 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. Accessories of the temporary Controlling station.
Drawing of flood light points on existing poles with supply of 400 W SON lamp including 7/20 PVC flexible wire for looping and all other required materials complete (damage materials will have to be replaced by the agency at their own cost from 08.01.2026 to 15.01.2026 = 8 days. X 10 Points [For latrine area at K1 bus stand]
Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different place of road,on hire basis from 05.01.2026 to16.01.2026 (12 days x 40 fittings per day)
Drawing ceiling light points from different feeder line to different shed at latrine area of K1 bus stand as directed by EIC with supply on hire basis 40 watt bulb holder and controlling switch etc. on bamboo post where necessary (Damaged materials will have to be replaces by the agency at their own cost) from 05.01.2026 to 17.01.2026 = 13 days x 100 pts.
Guarding arrangement for the whole installation of the above items for the entire period round the clock with effect from 05-01-2026 to 17-01-2026 (1 personal / shift x 3 shift x 13 days)
Talking out the whole installation except PCC pole after mela period including salbollah post bamboo post and LT distribution line (which is drawn by PVC AL. wire as temporary basis) and arms brackets from the PCC poles and other places and storing the deptt. Materials properly in good condition at sagar store including testing when issue & return as per direction of EIC.
Construction of tower by steel tubular pole with cross arms for four sides 1 meter apart above ground level the tower shall be 11 mtrs. Height x 4 mtrs. Square bottom x 2 m. square top with wooden plank platform by supplying required qty. of steel tubular pipe cross arms horizontal support etc. to complete the above tower on hire basis on or before 06.01.2024 as directed by EIC including drawing all electrical connection and controlling switch on hire basis with all protection to avoid any accident complete as per direction of EIC including decoration of each tower by LED light of required colour maintaining road marking on hire basis and all the tower should be properly earthed as per IE rules. The tower should be constructed as per dept. specification and drawing [Barricade arrangement should be provided around the tower to avoid any accident]
Erection of steel tubular pole inside sea/Latrine area (overall length 11 meter) on hire basis by excavation of earth of any kind of soil 2.5 mtr. Depth below ground level with proper piling at different places at sea beach with all protection to avoid accidents as per IE rules & as per direction of EIC complete (each pole should be properly earthed) on or before 05.01.2026.
Providing on hire basis including supplying, laying and transportation charges of 4 sq.mm 1.1 kv single core PVC instated and sheathed stranded aluminium cable including dismantling the same after completion of the mela
Supply & hiring basis Installation of power distrubution panel boards for power draw & supply from WBSEDCL in different substation ( 3 No Substation) including electrical inter connectionfrom departmental panel bioard to WBSEDCL panel board for LT distribution line before 05.01.2025 including proper earthing arrangement complete as per direction of EIC.
Providing of hire basis drawing 3.5 core 25 sq. mm. PVC AL. AR. Cable anddismelting the same after mela.
Fitting fixing the street light fixture on existing steel tubular pole/ tower from different feeder line as per direction of EIC with supplying on hire basis 400 watt/250 watt/ 400 watt Sodium [Twin] vapour lamp with all accessories complete with 7/20 PVC wire for looping arrangement including all other materials from 05.01.2026 to 16.01.2026 = 12 days (Damaged materials will have to be replaced by the agency at their own cost, and all the fixture should be of Philips make).
400 watt S.V. lamp = 55 pts. X 12 days
250 watt S.V. lamp = 55 pts. X 12 days
400watt(twin) for tower =30 pts x 12 days
400watt(single) SON for tower =55 pts x 12 days
Fitting fixing of 150 watt LED street light fixture in existing PCC poles at different place of road,on hire basis from 05.01.2026 to16.01.2026 (12 days x 55 fittings per day)
Guarding arrangement of the whole installation for the entire period. [ 12 days x 1 man/shift x 3 shift]
SARKAR ELECTRICAL (BID ID -7417725)
S. P. CONSTRUCTION (BID ID -7463798)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.13 MB
Tendernotice_4.pdf
PDF • 1.14 MB
BOQ_2285195.xls
BOQ • 0.39 MB