| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹27.9 Laccepted-aoc | accepted-aoc |
Tender Value
₹28.1 L
EMD Value
₹28,137
Closing Date
4 Mar 2026, 4:00 pmClosed
The Superintending Engineer
Irrigation Circle, Kalluru
Repairs and replacement of shutters on Mylavaram Branch Canal Km 27.300 to 37.342, Jamalapuram Major, Mulapadu Major, Ibrahimpatnam Major, Nidhanapuram Major and Chevuturu Major pertaining to the Irrigation sub division No.5, Yerrupalem
682569
N I T. No:31/2025-26, Dated:25-02-2026
OPEN
Civil Works
KHAMMAM, TELANGANA
12 documents required · 12 mandatory
₹997
₹28,137
19 Mar 2026
25 Feb 2026
25 Feb 2026
OT sluice EM Parts:Fabrication, supply, erection, testing and commissioning of sill beam,slide tracks,seal seats,guide plates etc with all accessories including cost of material,machinery,labour etc complte as per specification of drawings and approved drawings(Excluding wastage of steel @ 2.5%)
OT Sluice Gate: Fabrication, supply, erection, testing and commissioning of Skin plate,Horizontal and vertical angles , stiffeners, rubber seals ,clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc complete as per specification of drawings and approved drawings (Excluding wastage of [email protected]%)
OT Sluice Hoist & Hoist Bridge Gear Hoist Including Platform for Below 5 Tons Capacity(SmallGates): Fabrication, supply, erection, testing and commissioning of Embedded Parts consisting of Supporting Strucure and Platform etc with all accessories for sluice shutters including cost of all material, machinery,labour, cutting, bending, aligning, anchoring,welding, finishing etc complte as per specification of drawings (Excluding wastage of [email protected]%)
EM PARTS:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
GATES:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
HOIST & HOIST BRIDGE : Painting of Sluices for Maintenance works: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts.
Dismantiling of Stone masonry in cement mortar
Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement), CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)
Cost and Coneyance of 300 mm NP2 R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at exfactory (rate per metre of effective length) including cost of all materials, machinery, transportation, labour charges etc., complete with initial lead upto 50 m and all lifts.
Cost and Coneyance of 450 mm NP2 R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at exfactory (rate per metre of effective length) including cost of all materials, machinery, transportation, labour charges etc., complete with initial lead upto 50 m and all lifts.
Cost and Coneyance of 600 mm NP2 R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at exfactory (rate per metre of effective length) including cost of all materials, machinery, transportation, labour charges etc., complete with initial lead upto 50 m and all lifts.
Cost and Coneyance of 900 mm NP2 R.C.C. Spun / Vibrated Cast (Reinforced) Socket and Spigot pipes conforming to B.I.S. 458/2003 at exfactory (rate per metre of effective length) including cost of all materials, machinery, transportation, labour charges etc., complete with initial lead upto 50 m and all lifts.
Laying and jointing 300 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
Laying and jointing 450 mm dia. NP- 2 class or IRC standard hume pipes in CM 1 : 2 proportion by volume including cost of all materials ( excluding pipes and collars ), machinery, labour, aligning, packing joints with hemp, finishing, curing etc., complete with initial lead upto 50 m and all lifts. (Cement content: 9.9 kg / joint, FA : 0.01cum/joint, Hemp Yarn : 0.091kg/joint)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ Mylavaram Canal Shutters .xls
TENDER_DOCUMENT • 0.57 MB
NIT 31 2025 26 25 02 2026.docx
TENDER_DOCUMENT • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .