| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹76.0 LAdmitted-Finance SHAIKH BAZAR BUXIBAZAR CUTTACK | BALESHWAR | ODISHA | 754223 | -26.51% | ₹76.0 L | L1 | Admitted-Finance |
| 2 | L2₹77.0 LAdmitted-Finance | -25.49% | ₹77.0 L | L2 | Admitted-Finance |
| 3 | L3₹80.9 LAdmitted-Finance | -21.78% | ₹80.9 L | L3 | Admitted-Finance |
| 4 | L4₹84.6 LAdmitted-Finance | -18.18% | ₹84.6 L | L4 | Admitted-Finance |
Tender Value
₹1.0 Cr
EMD Value
₹1.0 L
Closing Date
11 May 2026, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER
Chief Construction Engineer Jeypore R and B circle Jeypore
CIVIL WORKS
2026_EICCL_128474_1
CCEJC R AND B 02/2026-27
National Competitive Bid
Civil Works - Buildings
150 days
JEYPORE
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.0 L
Yes
20 Jun 2026
27 Apr 2026
12 May 2026
27 Apr 2026
11 May 2026
27 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Civil Works
RCC of M-25 grade (equivalent to a nominal mix of proportion 1:1.5:3) as per approved designs and drawings having a minimum compressive strength (in work test) of 200kg/cm2 in 15 cm cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12mm to 20mm size black hard crusher broken granite chips (20mm size chips not to exceed 25%) and screened and washed sharp sand for mortar of approved quality from approved qarry to be mixed in concrete mixture including hoisting, lowering, laying and compacting concerete by using vibrators, watering and curing for 28 days, centring and shuttering then after dismantling and removing debries from the work site and finishing the exposed surface smooth including cost, conveyance, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete but excluding cost and conveyance of M.S. rods or Tor steel and binding wires of 18 to 20 guage and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position in all floors as directed by the Engineer in Charge.
Column Superstructure First floor | 18.65 | Cum | 17,747.4 | ₹3,30,989.01 | BI01010001010000000000000515BI0100001130 |
| 2 | Lintel First floor | 6.19 | Cum | 15,828 | ₹97,975.32 | BI01010001010000000000000515BI0100001129 |
| 3 | Roof Beam First floor | 31.88 | Cum | 17,747.4 | ₹5,65,787.11 | BI01010001010000000000000515BI0100001130 |
| 4 | Roof Slab First floor | 112.26 | Cum | 13,500.4 | ₹15,15,554.9 | BI01010001010000000000000515BI0100001132 |
| 5 | Chajja First floor | 20.16 | sqm | 1,407.9 | ₹28,383.26 | BI01010001010000000000000515BI0100001258 |
| 6 | Supplying, cutting, straightening coiled or bent up M.S. rods or Tor steel of SAIL (HYSD Fe-415) welding or jointing if necessary, bending, binding, tying the grills and laying in position as required for RCC works and hoisting, lowering and placing in position in all floors according to approved designs and drawings including cost, conveyance, taxes of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P etc. complete in all respect as directed by the Engineer in Charge
First floor | 236.11 | Quintal | 8,969.63 | ₹21,17,819.34 | BI01010001010000000000000515BI0100001258 |
| 7 | Fly Ash Brick Masonary in cement mortar (1:6) in superstructure using Fly Ash bricks of 25cm x 12cm x 8cm size having a crushing not less than 35kg per Sq.Cm, including splays cutting, circular moulding, chamfering, corbelling, watering and curing including cost, conveyance, royalties, taxes of all materials and labour with T&P required for the work etc. complete in all respect in all floors.
First floor | 134.58 | Cum | 5,957 | ₹8,01,693.06 | BI01010001010000000000000515BI0100001129 |
| 8 | Supplying, fitting and fixing M.S. Grill made out of structural steel, flats, plates, bars confirming to IS for windows, ventilators etc. as per drawing and design, fixed to walls with clamps including priming 1 coat with all kdamages in walls and floors etc. including cost of all materials, labour, conveyance, taxes, royalties, scaffolding, watering, curing, sundries, tools and plants etc.as per the direction of the Engineer in Charge.
Window | 1,360.8 | Kg | 67.08 | ₹91,282.46 | BI01010001010000000000000515BI0100001124 |
| 9 | Painting two coats with enamel paint including cost and conveyance of all materials, labour T&P, hire charges of machine, all taxes eto completes in all respects as per the direction of Engineer charges. | 20.61 | sqm | 266.2 | ₹5,486.38 | BI01010001010000000000000515BI0100001135 |
| 10 | Labour for fitting, fixing of MS Shutter & Grill including labour T&P, hire charges of machine, all taxes eto completes in all respects as per the direction of Engineer charges. | 38.88 | sqm | 16.22 | ₹630.63 | BI01010001010000000000000515BI0100001135 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
DTCNworkshop.pdf
Tender Documents • 4.42 MB
BOQ_588766.xls
BOQ • 1.29 MB
Download all tender documents and submit your bid