| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹1.6 Cr+₹1.2 L (0.80%)Rejected-Finance | ₹1.6 Cr+₹1.2 L (0.80%) | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
17 May 2023, 3:00 pmClosed
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Strengthening of Pinayur Road (Km 0/0 to 3/50) in Uthiramerur Block having package no. TNKPM22/2022-23 under MGSMT 2022-23
2023_RDTN_308847_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
O/o The Project Director DRDA Kancheepuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹1.6 L
Yes
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
29 Apr 2023
17 May 2023
29 Apr 2023
17 May 2023
29 Apr 2023
8 May 2023
Amount
Strengthening of Pinayur Road km 0/0-3/500 (R-36) In Pinayur Panchayat cost of Construction cost Rs.144.40 Lakh & Maintaenance Cost Rs.12.60 lakh
Clearing the Scrub jungle including all labour charges for burrying and burning etc., KM 0/0-3/500
Picking the worn out BT including all other labour charges etc complete KM 0/0-3/50
Providing & laying spreading & Compacting graded stone aggeragate to wet mix macadam specification including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with paver in Sub base/base course on well prepared surface & compacting with vibratory roller to achieve the desired as per MORT & H specification 406 IV Revision
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over the WMM surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Bituminous Mecadam 50mm Thick incl…all machinery cost of materials,labour charges,rentals for machinery and all other charges etc….completed
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Filling of Gravel for Side Berms including all cost and conveyance and labour charges etc.complete.
Provision For HM Stone
Provision For KM Stone
Road making with hot applied Thermoplastic Compound with Reflectorising Glass beads on bituminous surface
Provision for 90cm Equilateral triangle cautionary Signboard
Provision for 60cm equilateral triangle cautionary signboard
Provision for Speed Breaker Sign-Speed Breaker to be paintend in Black & White & Cautionary Sign board to be Provided
Blind Curve - Cautionary Sign Board needs to be Provided on Blind Curve on RHS with Speed breaker
Provision for 60cm Circle(Mandatory Sign)
Provision for Star Sign Sticker
Provision for Name board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
RMD CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .