Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC | ₹2.0 L | L1 | Accepted-AOC AOC |
| 2 | L2₹2.0 L+₹837 (0.42%)Rejected-Finance GRAM BAIJLA PO CHAMU BARA PRAYAGRAJ UTTAR PRADESH 212106 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 212106 | ₹2.0 L+₹837 (0.42%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | REKHA DEVI L2 | SUBHANSHI SINGH ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation in ordinary soil sandy loam clay and sand including lift upto 1.50 m and lead upto 30 m for completion of work as direction of engineer incharge. | 15 | cum | 130 ₹1,950 | 129 ₹1,935 Lowest |
| 2.00 | P.C.C 1:3:6 in bed of protection wall including cost of all material labour T and P for completion of work as direction of engineer incharge. | 4.8 | cum | 5,311 ₹25,492.8 Lowest | 5,311 ₹25,492.8 Lowest |
| 3.00 | Ist class brick masonary with 1:4 cement sand mortar including cost of all material labour Tand P for completion of work as direction of engineer incharge. | 19.17 | cum | 7,008 ₹1,34,343.36 Lowest | 7,008 ₹1,34,343.36 Lowest |
| 4.00 | Cement pointing on brick masonary with1:2 cement and sand mortar completion of work as direction of engineer incharge. | 24 | sqm | 155 ₹3,720 | 154 ₹3,696 Lowest |
| 5.00 | Earth work in srenghthening of bank for protection wall safty with ordinary soil including with dressing and mannual compaction for completion of work as direction of engineer incharge. | 114 | cum | 310 ₹35,340 | 303 ₹34,542 Lowest |
Tender Value
₹2.0 L
EMD Value
₹4,040
Closing Date
17 Jun 2026, 4:00 pmClosed
EXECUTIVE ENGINEER TONS PUMP CANAL DIV PRAYAGRAJ
EXECUTIVE ENGINEER TONS PUMP CANAL DIV PRAYAGRAJ
Construction of Protection wall of Rampur minor at km 0.900
2026_UPIDC_1156554_8
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
10 days
PRAYAGRAJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹4,040
Yes
24 Jul 2026
12 Jun 2026
17 Jun 2026
12 Jun 2026
17 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in ordinary soil sandy loam clay and sand including lift upto 1.50 m and lead upto 30 m for completion of work as direction of engineer incharge. | 15 | cum | - | - |
| 2 | P.C.C 1:3:6 in bed of protection wall including cost of all material labour T and P for completion of work as direction of engineer incharge. | 4.8 | cum | - | - |
| 3 | Ist class brick masonary with 1:4 cement sand mortar including cost of all material labour Tand P for completion of work as direction of engineer incharge. | 19.17 | cum | - | - |
| 4 | Cement pointing on brick masonary with1:2 cement and sand mortar completion of work as direction of engineer incharge. | 24 | sqm | - | - |
| 5 | Earth work in srenghthening of bank for protection wall safty with ordinary soil including with dressing and mannual compaction for completion of work as direction of engineer incharge. | 114 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
DOC.pdf
Tender Documents • 1.34 MB
BOQ_2174170.xls
BOQ • 0.23 MB
RETENDER01.pdf
Additional Documents • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .