| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC Accept |
| 2 | L2₹11.5 L+₹60,503.50 (5.54%)Rejected-AOC | ₹11.5 L+₹60,503.50 (5.54%) | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | BRINDAVAN AGENCY L2 | PERUMAL L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Pressed tiles as per the departmental Officers | 185 | M2 | 50.5 ₹9,342.5 | 50 ₹9,250 Lowest |
| 2.00 | Dismantling plain cement concrete as per the departmental Officers | 19 | M3 | 532 ₹10,108 | 500 ₹9,500 Lowest |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,orsilt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 19 | M3 | 204 ₹3,876 Lowest | 220 ₹4,180 |
| 4.00 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. | 40 | M3 | 97 ₹3,880 Lowest | 104 ₹4,160 |
| 5.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 28 | M3 | 5,545 ₹1,55,260 Lowest | 6,000 ₹1,68,000 |
| 6.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and alsoincluding fixing fan clamps and fixtures in rcc works wherever
necessary as directed by departmental officer etc., complete. | 19 | M3 | 9,065 ₹1,72,235 Lowest | 9,744 ₹1,85,136 |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 19 | Qtl | 8,875 ₹1,68,625 Lowest | 9,500 ₹1,80,500 |
| 8.00 | Supplying and laying in flooring with Shahabed Stone 25mm to 31mm thick (average) of 2' X 2' in size laid over base layer of cementmortar 1:3 (one cement and three Plastering sand) - 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed by the deparmental
officer | 185 | M2 | 1,305.5 ₹2,41,517.5 Lowest | 1,403 ₹2,59,555 |
| 9.00 | UPVC Window Specification:
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered
with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be
welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at
most ranging storms and should have key lockable action,security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from
the Executive Engineer before use on work | 6 | M2 | 6,958 ₹41,748 Lowest | 7,482 ₹44,892 |
| 10.00Supply Fixing Of Gas items as per the departmental Officers | |||||
Tender Value
₹14.8 L
EMD Value
₹14,800
Closing Date
9 Jun 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Supply,delivery and Fixing of Kitchen materials and Repair works for Amma unavagam in ward no 83 central zone of coimbatore corporation
2026_MAWS_678404_10
e35/2026 (Amma unavagam)
Open Tender
Civil Works
Works
60 days
Coimbatore corporation
As Per Tender Document
4 documents required · 4 mandatory
₹0
₹14,800
25 Aug 2026
27 May 2026
10 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Pressed tiles as per the departmental Officers | 185 | M2 | - | - |
| 2 | Dismantling plain cement concrete as per the departmental Officers | 19 | M3 | - | - |
| 3 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,orsilt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 19 | M3 | - | - |
| 4 | Removal of Excavated Excess Earth away from the site to 5K.M including loading and transportation charges etc, complete as per standard specification. | 40 | M3 | - | - |
| 5 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 28 | M3 | - | - |
| 6 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M.sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and alsoincluding fixing fan clamps and fixtures in rcc works wherever
necessary as directed by departmental officer etc., complete. | 19 | M3 | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 19 | Qtl | - | - |
| 8 | Supplying and laying in flooring with Shahabed Stone 25mm to 31mm thick (average) of 2' X 2' in size laid over base layer of cementmortar 1:3 (one cement and three Plastering sand) - 20 mm thick and applying cement slurry &pointed with white cement and colour pigments to the colour of stones and polished neatly as directed by the deparmental
officer | 185 | M2 | - | - |
| 9 | UPVC Window Specification:
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered
with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be
welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at
most ranging storms and should have key lockable action,security protective hinges, strong locking systems and as per size for arresting noise and energy loss. The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from
the Executive Engineer before use on work | 6 | M2 | - | - |
| 10Supply Fixing Of Gas items as per the departmental Officers | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
ITB.pdf
Additional Documents • 0.20 MB
BOQ_815072.xls
BOQ • 0.27 MB
TenderDocumentSingle.pdf
Tender Documents • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .