| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 77 KAILASH PURI BIKANER RAJASTHAN PIN 334001 | BIKANER | RAJASTHAN | 334001 | ₹1.8 Cr | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹2.0 Cr+₹18.4 L (10.4%)Rejected-Finance | ₹2.0 Cr+₹18.4 L (10.4%) | L2 | Rejected-Finance Not L1 |
| 3 | L3₹2.2 Cr+₹41.2 L (23.2%)Rejected-Finance | ₹2.2 Cr+₹41.2 L (23.2%) | L3 | Rejected-Finance Not L1 |
| 4 | L4₹2.2 Cr+₹42.8 L (24.1%)Rejected-Finance | ₹2.2 Cr+₹42.8 L (24.1%) | L4 | Rejected-Finance Not L1 |
| 5 | L5₹2.3 Cr+₹55.7 L (31.4%)Rejected-Finance | ₹2.3 Cr+₹55.7 L (31.4%) | L5 | Rejected-Finance Not L1 |
Tender Value
₹2.5 Cr
EMD Value
₹3.3 L
Closing Date
17 Sept 2022, 6:00 pmClosed
CHIEF ENGINEER
HEADQUARTER CHIEF ENGINEER JAIPUR ZONE JAIPUR
PROVN OF PREPAID METERS FOR MD ACCN AT JAIPUR MIL STN
2022_MES_544909_1
CEJZ/NIT/JPR-04 OF 2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
Jaipur
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
GE (South) Jaipur
₹3.3 L
Yes
1 Oct 2022
12 Aug 2022
19 Sept 2022
12 Aug 2022
17 Sept 2022
12 Sept 2022
Amount
Supply, install, testing and commission of Smart meter Single Phase (AC static watt hour Meter) with the following specifications: • AC Single Phase Two Wire, Tamper Proof, smart meter (AC Static watt hour Meter) of Class 1.0, 240 V, 50 Hz, 5 A-60 A ISI marked with IS-16444:2015(reaffirmed 2020) and relevant IEC standards with inbuilt communication facility as per IS code through any mode and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. However communication mode (wire/ sim/RF) shall be as per site requirement and as approved by GE. MAKE: Secure, L&T, HPL,Elmeasure Notes: (a) Meter Should support sending the following data : 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software including inbuilt storage to store data of last 15 days and minumum 30 Min battry back up. (b) Meter itself capable for data transfer capable to define multiple tariff slabs, happy hour & holiday definition, via mobile app user can decrease its sanctioned load, (c) Meter should have facility to connect / disconnect remotely, functionality operatable through prepaid billing software.
(d) Meter should have online recharge facility and offline recharge facility by authorised person in case of any communication network issue (e) The meter should support open communication protocol DLMS with the software (f) Installation of IP-67 protection outdoor data accumulator for long range communication compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter and with the data server through GPRS/Ethernet. It would have internal memory to store data of at least 200 modules per month. It would have inbuilt battery back-up of 120 min . (g) The contractor would be responsible for removing the existing meter, noting down the reading and depositing it with the MES AGE E/M store complete all as specified & directed.the quoted rates shall be deemed to be included of this aspect. h) The Smart Energy Meter to be capable to detect any tempering with meter and to communicate the server (j) The meters to carry 05 year guarantee. The contractor shall furnish 05 (Five) years replacement guarantee for prepaid meters installed under this contract except damage from water and fire in the form of MoU with OEM or their service provider. The MoU shall be furnished by the contractor at the time of commencement of Work. (k) The unit rate of meter includes 2 years communication network recurring charges after completion of project/work. (l) The Cost of making good disturbed surface & matching with existing surfaces is deemed to included in quated rate
Supply, installation, testing and commissioning Smart Three Phase Meter (AC Static watt hour Meter) with the following specifications: • AC Three Phase Four Wire, Tamper Proof,Smart meter (AC Static watt hour Meter) of Class 1.0, 415 volt 10 A-100 A, ISI marked marked with IS-16444:2015(reaffirmed 2020) and relevant IEC standards with inbuilt communication facility as per IS code through any mode and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry. However communication mode (wire/ SIM/RF) shall be as per site requirement and as approved by GE. Make:-Secure, L&T, HPL,Elmeasure Notes: (a) Meter Should support sending the following data : 15 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software including inbuilt storage to store data of last 15 days and minumum 30 Min battry back up. (b) Meter itself capable for data transfer capable to define multiple tariff slabs, happy hour & holiday definition, via mobile app user can decrease its sanctioned load, (c) Meter should have facility to connect / disconnect remotely, functionality operable through prepaid billing software.
(d) Meter should have online recharge facility and offline recharge facility by authorised person in case of any communication network issue (e) The meter should support open communication protocol DLMS with the software (f) Installation of IP-67 protection outdoor data accumulator for long range communication compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter and with the data server through GPRS/Ethernet. It would have internal memory to store data of at least 200 modules per month. It would have inbuilt battery back-up of 120 min . (g) The contractor would be responsible for removing the existing meter, noting down the reading and depositing it with the MES AGE E/M store complete all as specified & directed.the quoted rates shall be deemed to be included of this aspect. h) The Smart Energy Meter to be capable to detect any tempering with meter and to communicate the server (j) The meters to carry 05 year guarantee. The contractor shall furnish 05 (Five) years replacement guarantee for prepaid meters installed under this contract except damage from water and fire in the form of MoU with OEM or their service provider. The MoU shall be furnished by the contractor at the time of commencement of Work. . (k) The meter cost would include 2 years communication network recurring charges after completion of project. (l) The Cost of making good disturbed surface & matching with existing surfaces is deemed to included in quated rate
Notes for Item No.1&2 : (a) The Meters are to be installed at Married accomadation of Offrs,JCO's ORs and equivalent with in Jaipur Military station .These accomodations are located in Various Pocket of the staion .While installing power shutdown etc needs to be take in consulation with the user and MES .The contractor should ensure Minimum disturbance of Power while changing the old Metering system to New Meters (b) Defect liability peroid shall be of two years , including operating costs in two years of defect liability period. They would include the following items: (i) Monthly charges if any for communucation network for defect liabilty period included in meter cost . The contractor would submit MoU from OEM to ensure supply of appropriate SIMs/ modules to ensure necessary signal availability. The OEM would change the network provider or sim provider as required. In case of network issues, the contractor would liaison with the OEM for necessary resolution. (ii) Recurring SMS charges: The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts. (iii) Software update : This would include necessary upgradations in any type of software/Mobile app/ application software. These changes happen on frequent basis and the software would support all the changes. (c) Contractor will provide neccessary training to E/M / BSO staff for smart metering operation and provide dedicated professonal experincied engineer during defect liability period. However quoted rate against these items includes above aspect and nothing extra shall be paid on this account . (d) The system should have capacity to accomodate upto 5000 meters for any future upgradation.
Supply and Configuration of the Web based Software per meter with following modules: (i) Meter Data Management Module The meter data management module would be responsible for collecting the data from the concentrator /Meter/Accumulator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) 15 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency (b) Monthly billing survey data for cum energy and max demand (ii) Billing Module The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. The system would be setup as prepaid & postpaid billing system. It would allow postpaid and prepaid functionality as required. (iii) Occupation and Vacation Module The system would support occupation / vacation and billing reports. the software would be collecting data from meter/accumulator. The software would provide access to staff as well as the occupant for the data.
(iv) Web site: There would be a dedicated website for the AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use). website must have only access of MES authority, not to any third party or web devloper and OEM team will visit regularly or on request for any bug fixing as required for smooth runnung of website and application software (v) Customer Portal The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. '(vi) Energy Accounting Module The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available for feeder/transformer load distribution. (vii) Communication Module The system would provide communication of energy data and bills via print, email and sms methods. (viii) Meter Master Data The system would support meter master data repository. The system would support meter replacement process.
(ix) Excel Export The system would support export of metering and billing data in excel format. (x) Customer Care Module - the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change to the department on email. contractor should submit MoU from OEM to provide the software & hardware update for smart meter / Data communicator/ website / Mobile app / application software ” (xiii) (a). Application software / Mobile app, website and other connected items must be supplied as recommonded by by OEM (Manufacturar of meter) irrespective of developers and contractor should have submit MOU on 100 rupees non judicial stamp paper to provide the availability of software update / hardware spares for five years. (b) all softwares / applications must have security provisions to protect privacy data and army area security,
(c) The software would be hosted on MEITY (Ministry of Information Technology) approved GCC (Government Community Cloud) (d) One payment gateway would be installed and connected to the SBI public bank account provided by the GE. This payment gateway should have both payment options of online payment and offline payments. (e) The software and system would contain two year defect liability including all operating expenses such as GPRS charges, hosting charges etc. (f) Software has optoin to update govt tariff structure time to time. (e) Remote server admin support - Ensuring adequate database back up and all system as well as software update (f) Software installation on any alternate / backup server if required (g) The communication network monitoring and support (h) Configuration of the repaired / replaced hardware in the system (j) Trouble shooting and bug fixing to run the system. (k) Software to be audited from CERT India empanelled firm before instalation. Cost of audit to be borne by the contractor. (l) Smart meter and software/mobile application will be in compliance with service HQ cyber security norms.
Supply and Installation of suitable Server (one production and one backup) capable to manage, process and store the data upto 5000 smart meters with back up of data for 1 year with inbuilt memory SSD type and latest configuration as reccomonded by OEM and as directed by GE. Note: (1) Suitable UPS would be included of 120 Min cap with pseudo sinewave output of 1.5 times of capacity in VA for sever load as recomonded by OEM. (2) Suitable data switch would be included (3) 2 years internet connection with minimum speed of 100 MBPS would be included
Supply ,install and testing of data security firewall and anti virus for serve and desktop with 5 year subscription for server and computer desktop as recommonded
Supply , Installation and testing of vending station desktop with configuration of i5, 12th generation ,16 GB RAM, 1 TB SSD Hard disk, 19 " monitor, Windows 10/11, MS office, keyboard and mouse, CD ROM Read/Write, USB ports etc inclusing suitable UPS of 30 min bacup with sinewave output of capacity 650 VA. Make: HP, Dell, Lenovo Note (1) internet connection with minimum speed of 100 MBPS would be provided within this contract for defect liabilty peroid.
Supply , installation , testing and commisioning of wireless laserjet b&w printer for print, scan and copy with 40 page per minute capacity for 1200X1200 DPI as reuired and specified suitable for A4 size papers. Make: HP, Canon, Epson
Supply, installation, testing & commissioning of polycarbonate Single phase meter box for outdoor type IP67 with arrangement of fixing in meter box, energy meter and double pole MCB 10KA suitable rating with front open for punching of recharge token.
Supply, installation, testing & commissioning of polycarbonate three phase meter box for outdoor IP67 with arrangement of fixing in meter box, energy meter and four pole MCB 10KA suitable rating with front open for punching of recharge token.
M&L for sub main cable laying and wiring as 2 x single core PVC Insulated copper cable with multistrand of 6 sqmm in rigid PVC conduit from panel/DB to meter connection complete all as specified and directed . Note :- Two run of cable and PVC conduit shall be considered single run as one unit i.e. RM
M&L for sub main cable laying and wiring as 4 x Single core PVC Insulated copper cable with multistrand of 6 sqmm in rigid PVC conduit from panel/DB to meter connection complete all as specified and directed. Note :- Four run of cable and PVC conduit shall be considered single run as one unit i.e. RM
S&F MCB Distribution Board, Powder Coated. Crca Steel Sheet , Degree Of Protection Ip-43, Ik-09 With Reversible Double Door, Recess Mounted, having Insulated 100 Amps Tinned Copper Bus Bar, Neutral Bus Bar, Earth Bar, Din Bar, Detachable Gland Plate, Interconnection, Earthing Connection, Blanking Plates In Unused Spaces As Required With TPN, 415 Volts, 4 Ways complete all as specified and as directed..
S&F MCB Of ‘B’ Series Having Breaking Capacityt 10 KA, ISI Marked Including required wiring connections with copper lugs of suitable size provided In MCB DBs Of TPN 40 Amp complete all as specified and as directed.
S&F MCB Of ‘B’ Series Single Pole 6 To 32 Amps Having Breaking Capacityt 10 KA, ISI Marked Including required wiring connections with copper lugs of suitable size provided In MCB DBs Complete all as specified and as directed.
S&F MCB Of ‘B’ Series Double Pole 6 To 32 Amps Having Breaking Capacityt 10 KA, ISI Marked Including required wiring connections with copper lugs of suitable size provided In MCB DBs Complete all as specified and as directed.
M&L for pipe in pipe chemical earthing with GI pipe electrode 3.0 m long having outer pipe dia 80 mm & inner pipe dia 50 mm duly filled with highly conductive and anti corrosive compound of required quantity having chemical composition Bentonite 40%, copper sulphate 20%, Gypsom 5%, Graphite 10%, Alum 5%, Zinc sulphate 10%, Aluminium sulphate 10% burried in ground by digging a bore of 150 mm dia surrounded by soil friendly backfill compound non soluble in water including connection with galvanised earth strip 32 x 6 mm, making PCC pit of size 0.3 m x 0.3 m x 0.3 m (inner size) in mix 1:3:6 type C1 with RCC 1:2:4 type B-1, 40 mm thick cover reinforced with 8 mm dia MS bars 3 Nos both ways with lifting hook made out of 8 mm dia bar and testing on completion to achieve value not more than 2.0 ohm complete all as specified and directe. (Note - GI strip size 32x6 mm upto 7.5 m included in the unit rate of this item).
M&L For Earthing With Galvanised Steel Earth Plate Electrode 600mm X600mmx6mm Thick Buried Directly Bin Gound (Earth Pit Not Less Than 2.25 Meter Deep Below Normal Ground Level) With The Top Edge Of The Plate Not Less Than 1.5m Below Normal Ground Level Connected To Galvansied Earth Wire 4 Sqmm Mm, By Means Of Steel Bolts, Nuts, Check Nuts And Washers All As Shown In Electrical Plate No 03 Of Ssr Part-I Connected To Earthing Point, Pcc Pit In Mix 1:3:6 Type C1 With Pcc 1:2:4 Type B-1, 40mm Thick Cover, Watering Arrangement With Funnel And Wire Mesh And 20mm Bore Mmedium Grade G.I. Watering Pipe, Common Salt And Charcoal Filling, Necessary Excavation And Earth Work Including Testing On Completion.
UNITED SAINI BUILDERS
VEE SONS BUILDERS PVT LTD
M/s Prem Associates
meenakshi construction
M/S JIWAN KUMAR MITTAL
Pioneer Enterprises
SANJEEV ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .