| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.9 L+₹5,873.27 (2.08%)Rejected-Finance PLEASE PROVIDE THE DOCUMENT CONTAINING THE ADDRESS | NEW DELHI | DELHI | 110001 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical DOCUMENTS INCOMPLETE | |
| 4 | Rejected-Technical 01 CHERSOO NH44 PULWAMA PULWAMA JAMMU KASHMIR 192123 | PULWAMA | JAMMU AND KASHMIR | 192123 | - | Rejected-Technical DOCUMENTS INCOMPLETE |
Tender Value
₹3.4 L
EMD Value
₹34,000
Closing Date
15 Nov 2022, 10:00 amClosed
E.E.E.G.C.C.DIV.-2, HARIDWAR
OFFICE OF THE E.E.E.G.C.C.DIV.-2, HARIDWAR
Construction of site office/Quarter for regulation staff at Gulalwali X-Regulator at km. 34.870 left bank of E.G.C. main canal in distt. Bijnor (Year 2022-23).(LOT-02)
2022_UPIDC_746620_2
TENDER NOTICE NO.04/EE/2022-23
Open Tender
Civil Works - Buildings
Item Rate
60 days
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹678
₹34,000
2 Jan 2023
9 Nov 2022
15 Nov 2022
9 Nov 2022
15 Nov 2022
9 Nov 2022
Amount
Earthwork in Excavation in foundation in Ordinary Soil i/c 1.50 m lift and 30 m lead, ramming and dressing the surface to the required levels and slops, labour and T&P required for proper completion of work.
P.C.C in Foundation 1:4:8 with cost of material , labour and T&P etc. all complete.
1st calss brick work in 1:4 C.M. including cost of all material, labour and T&P etc. all complete.
2.00 cm thick Damp Proof Coarse cement and approved coarse 1:2 i/c water proofing material as ordered by Engineering-in-Charge in the proportion as specified by the manufacturer i/c supply of all materials, labour and T&P. etc. required for proper completion of the work and i/c proper curing and shuttering as necessary.
Supplying and Fixing Chaukhats of Structural Steel (Angle) for Doors and Windows
Centering and Shuttring for R.C.C. work with cost of all material ,Labour and T&P etc.(Ordinary)
Steel Reinforcement with Bending, Binding and Placing in Position with cost of all material, Labour and T&P etc .TMT Bar 16 mm Dia
Steel Reinforcement with Bending, Binding and Placing in Position with cost of all material, Labour and T&P etc .TMT Bar 10 mm Dia
Steel Reinforcement with Bending, Binding and Placing in Position with cost of all material, Labour and T&P etc .TMT Bar 8 mm Dia
Steel Reinforcement with Bending, Binding and Placing in Position with cost of all material, Labour and T&P etc .TMT Bar 6 mm Dia
R.C.C. 1:2:4 in slab and caps with cost of material, labour and T& P etc .
2.5 cm thick plain Cement concrete floor with cement, approved coarse sand and 2cm Graded approved grit laid in panels finished with 3 mm floating, cost of cement and marble dust in ratio of 5:1 as specified over and i/c 8 cm thick base concrete consisting of cement, fine sand of 1.25 fineness modulus and brick ballast 4 cm guage in proportion of 1:4:8 and removing and over lapping mortar add the joints of the panels if any and giving them uniform finishing i/c supply of all materials, labour and T&P. required for proper completion of the work .
Supplying and Fixing of Steel Glazed Door,Window/Ventilator etc.
ABHAY SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .