Loading…
Loading…
Tender Value
₹10.9 L
EMD Value
₹10,851
Closing Date
16 Jun 2026, 5:00 pm
Superintending Engineer
O/o the S.E, RandB Division, Nayagarh
S/R to Baghamari-Gania-Daspalla SH-48 road for 2026-27( Such as cleaning of RCC Drain and new construction RCC Drain with cover slab from 51/400km to 52/100km Left side)
2026_EICCL_131251_3
eTCN04 of 2026-2027
Open Tender
Civil Works - Roads
60 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,851
Yes
6 Jun 2026
6 Jun 2026
17 Jun 2026
6 Jun 2026
16 Jun 2026
6 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth Work in exavation of foundation in oridinary soil within initial leads of 50m & lifts of 1.5m including dressing and levelling of bed etc. and adding contractor's profit and over head charges, etc. complete in all respect | - | cum | 175.44 | - | 1 |
| 2 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials within initial leads and lifts as per direction of E.I.C. | 1 | cum | 282.88 | ₹282.6 | 2 |
| 3 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | - | cum | 865.18 | - | 3 |
| 4 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | - | cum | 5,930.01 | - | 4 |
| 5 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.
Drain Foundation | - | cum | 6,154.82 | - | 5 |
| 6 | Drain Wall ( Sub-Structure) | 1 | cum | 8,528.24 | ₹8,519.71 | 6 |
| 7 | Drain Slab | - | cum | 7,691.29 | - | 7 |
| 8 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | 1 | qntl | 9,551.02 | ₹9,541.47 | 8 |
| 9 | Providing weep holes in Plain/ Reinforced concrete abutment wing wall/ return wall with 100 mm dia AC pipe, extending through the full of the structure with slope of specification | - | rmt | 93.98 | - | 9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.85 MB
BOQ_594865.xls
BOQ • 0.34 MB
DTCN0403.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid