Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC AT DHAMANAKHOLA PO DIGAPADA | L1 | Accepted-AOC Successful Bidder in Lottery | |
| 2 | L1₹5.0 LRejected-AOC AT NARASINGHAPALLI PO PS ASKA DIST GANJAM PIN 761110 | GANJAM | ODISHA | 761110 | L1 | Rejected-AOC Unsuccessful Bidder | |
| 3 | L1₹5.0 LRejected-AOC AT LAXMI NAGAR 2ND LINE PO ANKULI PS B N PUR DIST GANJAM BERHAMPUR ODISHA | BERHAMPUR | GANJAM | ODISHA | L1 | Rejected-AOC Unsuccessful Bidder | |
| 4 | L1₹5.0 LRejected-AOC | L1 | Rejected-AOC Unsuccessful Bidder | |
| 5 | L1₹5.0 LRejected-AOC | L1 | Rejected-AOC Unsuccessful Bidder |
Tender Value
₹5.0 L
EMD Value
₹5,100
Closing Date
27 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO-II, BERHAMPUR
Repair to Bridge over Verenda Nallah at 3.720 Km on K.S.Nagar to N.K.Kharida Bridge Asset_Road_Color Washing, Approach Road, Ralling Repir_Right Approach0.000 to 0.120Left Approach0.000 to 0.150
2026_CERWI_135172_1
Online Tender/07/SERWD-II/2026-27
National Competitive Bid
Civil Works - Roads
Percentage
30 days
Ganjam
2 documents required · 2 mandatory
₹4,000
₹5,100
Yes
1 Oct 2026
10 Jul 2026
28 Jul 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
10 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil with all leads and lifts including rough dressing and breaking clods to maximum size of 5cm to 7cm and laying in layers not exceeding 0.30M (1-0) in depth with all labour, Cess and T and P etc. complete including compaction with PRR in ordinary compaction including watering and hire and running charges of PRR etc. complete required for the work including Royalty, DMF, EMF and Additional Charges chargesas per specification and direction of the Engineer-in-Charge. The payment will be made by level sections only. | 29.77 | cum | 282.89 | ₹8,421.64 |
| 2 | Providing and filling manualy with aproved quality of sand in layers not exceeding 150mm thick including watering ramming to proper density with cost,conveyance, Royalty, DMF, EMF and Additional Charges , of all materials and cost of alllabour and T and P as required for the item of work including Cess etc complete as per specification & direction ofEngineer-in-charge | 4.25 | cum | 662.4 | ₹2,815.2 |
| 3 | Providing Cement Concrete (1:3:6) with 40mm size clean hand broken granite metal of approved quality from approved quarry includinghoisting lowering and levelling in position to required level in each layer not exceeding 15cm thick in foundation including frame work where neCessary ramming using vibrator to proper slope and levelling curing dewatering with cost conveyance Royalty, DMF, EMF and Additional Charges , labour of all materials and including hire and running charges of machineries T and P required for the work including supplying and working of pumps and Cess as per the specifiction and direction of Engineer-in- charge | 4.25 | cum | 5,815.53 | ₹24,716 |
| 3.01 | Substructure | 38.48 | cum | 5,957.57 | ₹2,29,247.29 |
| 4 | Finishing wall surface two coats with any approved weather shield cement paintto outer wall surface after celaning surface including cost of paint watering curing with cost conveyance andof all materials and labour with T and P and Cessrequired for the work etc, complete in all respect as per the direction of Engineer-in-Charge. | 280.81 | sqm | 161.88 | ₹45,457.52 |
| 5 | Providing weep holes in abutments and wing walls using 10 CM dia AC pipes including metal spall backing in rear side etccomplete including centering and shuttering if required, with cost, conveyance of all materials, labour with T and P, Cess, required for the work and as per direction of EIC. | 9 | rm | 111.05 | ₹999.45 |
| 6 | 20mm (3/4) thick grading plaster with cement mortar (1:4) over roof slab after chipping and chiseling the same and clearing the surface by wire brush laid to proper slope finished smooth to receive tarfelt treatment watering and curing for 7 days including cost and conveyance of all materials and labour, Cess with T and P required for the work with alland Royalty, DMF, EMF and Additional Charges etc. complete in all respect in all floors etc complete and as per specification and direction of Engineer-in-charge but excluding cost of E.C. bags. | 3.69 | sqm | 304.53 | ₹1,123.72 |
| 7 | Providing cement concrete of (1:2:4) using 12mm and down graded size hard granite stone aggregate including cost and conveyance of all materials to site, and all labour charges complete including cost, conveyance, Royalty, DMF, EMF and Additional Charges, labour, Cess and T and P and all other materials required for the work complete as per the direction of the Engineer-in-charge. | 24.75 | cum | 7,733.43 | ₹1,91,402.39 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_600723.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.87 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_600723.xls
BOQ • 0.24 MB
2ndcorrigendum.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .