Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.8 LAdmitted-Finance | -52.10% | ₹28.8 L | L1 | Admitted-Finance |
| 2 | L2₹30.6 L+₹1.8 L (6.24%)Admitted-Finance | -49.11% | ₹30.6 L+₹1.8 L (6.24%) | L2 | Admitted-Finance |
| 3 | L3₹32.4 L+₹3.6 L (12.5%)Admitted-Finance | -46.10% | ₹32.4 L+₹3.6 L (12.5%) | L3 | Admitted-Finance |
| 4 | L4₹35.7 L+₹7.0 L (24.2%)Admitted-Finance | -40.50% | ₹35.7 L+₹7.0 L (24.2%) | L4 | Admitted-Finance |
| 5 | L5₹39.2 L+₹10.5 L (36.4%)Admitted-Finance MASTAN DHARA BAFLAIZ TEHSIL SURANKOTE DISTRICT POONCH JAMMU AND KASHMIR | SURANKOTE | POONCH | JAMMU AND KASHMIR | -34.66% | ₹39.2 L+₹10.5 L (36.4%) | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
17 Jun 2026, 6:00 pmClosed
Executive Engineer I and F C Poonch
Office of the Executive Engineer I and FC poonch
Construction of Main Shahi Khul and Its Distributaries at Various Locations
2026_IFC_311429_1
e-NIT No.06 Of 2026-27
Open Tender
Civil Works - Canal
Percentage
45 days
Surankote
As Per NIT
2 documents required · 2 mandatory
₹1,600
Executive Engineer I and FC poonch
₹1.2 L
Office of the Executive Engineer I and FC poonch
3 Jul 2026
3 Jun 2026
18 Jun 2026
3 Jun 2026
17 Jun 2026
3 Jun 2026
9 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil | 65.57 | cum | 187.3 | ₹12,281.26 |
| 2.01 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 262.28 | cum | 592.9 | ₹1,55,505.81 |
| 3.01 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 582.92 | cum | 5,733.6 | ₹33,42,230.11 |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 716.88 | sqm | 286.35 | ₹2,05,278.59 |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | 1,672.72 | sqm | 628.95 | ₹10,52,057.24 |
| 6.01 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 37.5 | cum | 6,591.25 | ₹2,47,171.88 |
| 7.01 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 229.5 | cum | 371.15 | ₹85,178.92 |
| 8.01 | supply of stones | 195.07 | cum | 700 | ₹1,36,549 |
| 9.01 | supply of K-Crates black annealed wire,crates made from 4.00mm wire (wire as per IS:280)machine,woven bothends bent,with following meshes and nominal sectional weight Mesh +Tol(mm)150x150+6.0;sec.Kg/Sq.M 1.56 including loading unloading and staking(61.5x1.5) | 17 | Nos | 5,620 | ₹95,540 |
| 10.01 | Carriage of stone by an avg 5 km by MT and 200m by HL | 195.07 | cum | 626.44 | ₹1,22,199.65 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.98 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
nit6.pdf
Tender Documents • 1.46 MB
BOQ_1008404.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .