Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹3.4 L+₹9,175.68 (2.77%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹3.8 L+₹47,569.68 (14.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹3.9 L+₹57,775.68 (17.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹4.0 L+₹69,439.68 (21.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹14,580
Closing Date
18 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
vWALLING OF SUB CENTRE CHAMBGUND 31
2026_RDPR_319319_1
e- NIT No. 51 OF REWK/PRI/2026-27 Dated 04-08-2026
Open Tender
Civil Works
Percentage
45 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹250
EX ENGINEER REW KULGAM
₹14,580
29 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearence by mannual means including cutting of plants bushes trees etc and disposal of the same. | 15 | No | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms in All kind of soil. | 11.16 | cum | - | - |
| 3 | P/L stone solling hand packed with 20% Plums including all carriages | 8.57 | cum | 1 | ₹8.56 |
| 4 | Providing and laying in position Cement concrete of specified grade M10 (1:3:6) mix using Graded stone aggregate 40mm Nominal size including curing excluding cost of centering and shuttering etc complete all work upto plinth level. | 20.56 | cum | - | - |
| 5 | Brick work with common burnt clay (non-Modular) bricks of class designation 7.5 in foundation and plinth and in super structure cement mortar (1:6)mix.complete job. | 25.31 | cum | - | - |
| 6 | Formwork of ordinary timber planks for in situ concrete work | 97.58 | sqm | - | - |
| 7 | P/A 12mm thick cement sand plaster. | 102.95 | sqm | 1 | ₹102.85 |
| 8 | Finishing walls with snowcem cement paint two or more coats . | 195.12 | sqm | - | - |
| 9 | P/F Steel Gate including all fixtures and painting complete job. | 1 | No | - | - |
| 10 | P/F sign board of approved Quality including photograph charges and manhole for storage tank. | 1 | job | 0.8 | ₹0.8 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_1057066.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .