| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Valid | |
| 2 | L2₹30.8 L+₹93,750 (3.14%)Rejected-Finance RCP GURUDWARA ROAD WARD NO 29 SURATGARH SRI GANGANAGAR 335804 | SURATGARH | SRI GANGANAGAR | RAJASTHAN | 335804 | L2 | Rejected-Finance NOT BEING LOWEST | |
| 3 | L3₹32.3 L+₹2.4 L (8.13%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L3 | Rejected-Finance NOT BEING LOWEST |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
26 Dec 2020, 6:00 pmClosed
GE (AF) SURATGARH
GE (AF) SURATGARH
MANNING AND OPERATION OF AC PLANTS DG SETS STP RO PLANTS AT AF STATION SURATGARH
2020_MES_399260_1
8831/E8
Open Tender
Civil Works
Item Rate
334 days
GE (AF) SURATGARH
AS PER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹500
Yes
GE (AF) SURATGARH
₹80,000
Yes
2 Feb 2021
28 Nov 2020
28 Dec 2020
28 Nov 2020
26 Dec 2020
12 Dec 2020
Amount
BOQ (MANNING AND OPERATION OF AC PLANTS/DG SETS,STP, RO PLANT AT AF STATION SURATGARH)
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant Comm IT (b) DG Set 200 KVA -01
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant SEL (b) AC Plant ATC (c) DG Set 200 KVA -01 (d) DG Set 160 KVA -01
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant Bison Lab (b) AC Plant Spl eqpt Sec (c) DG Set 200 KVA -01(R&SS Hanger) (d) DG Set 380 KVA -01 (Bison Lab)
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant Bomb Dump-P-457 (b) AC Plant Bomb Dump-P-458 (c) AC Plant PMS (d) DG Set 125 KVA -01 (e) DG Set 110 KVA -01 (f) DG Set 75 KVA -01
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant MLH-02 nos (b) DG Set 400 KVA -03 nos
Operation & maintenance of AC Plant with DG set comprising of below mentioned items in note, round the clock in SUMMER , MONSOON and WINTER season including on Sundays & holidays for cooling/Heating to achieve desired temperature and other conditions thorough out the period at following installations:- (Total 03 shifts with one Refrigeration Mech in each shift) (a) AC Plant 275 SU (b) DG Set 82.5 KVA -01
Manning and operation of sewage treatment plant round the closk in 1 shift of eight hours with operator ITI certificate holder to maintain the effluent quality as below ::- (a) BOD < 10 mg/ ltr (b) COD - 150 mg/ ltr (c) DO - 20 mg/ ltr or more (d) TSS < 10 mg/ ltr (e) PH - 6.5-8.5 (f) Oil and Grease < 10 mg/ ltr (g) Coliform < 100 MPN/ 100 ml (h) Res Chlorine < 1 mg/ ltr (i) Testing from NABL certified laboratories to be carried out by contractor and report to be submitted to AGE E/M subdivision all as specified and directed by Engr-in-Charge.(a) to (g) above and proper record to be maintined. (ii) Residual Chlorine test to be carried out daily and proper record will be maintained. The testing record to be shown to JE concerned daily and weekly to Engr-in-Charge. (iii) Area cleaning of STP .(iv) Proper uniform to the operator/helper. (iv) Remove Mud and sludge from centrifuge pump motor (Total 01 shift with one FGM) (a) Sewage treatment plant (capacity 1 MLD ) - 01 No (b) DG Sets 100 KVA - 01 No
Note for Serial item No 1.00 to 7.00 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (a) AC plant comprising of compressor, motors, condenser, AHU, refrigerant piping, electrical panel board, pipe lines, ducts, cables, cooling tower, strip heaters, DG set etc & other connected parts installed for smooth & efficient performance of AC plant to achieve desired ambient temperature conditions throughout the period. (b) DG set shall comprise of complete set including alternator, motors AMF panel etc and other connected items for smooth & efficient performance of DG set throughout the period. (c) Maintenance shall be as per periodical maintenance schedule ( i.e daily, weekly, monthly & seasonal) (d) The attendance register of all the operators will be submitted by the contractor on weekly basis to GE with signature of Engineer-in-charge and JE concerned and Log sheet of AC plants/DG sets duly maintened as per prescribed format will be submitted to E/M sub division on daily basis duly signed by the concerned users. (e) Qualification of refrigiration mech/electrician should have ITI or above including three years experience in refrigiration/electrician works. (f ) The contractor will ensure daily cleaning of plant Room and surrounding area of the installation ie. upto 05 metre around bldg and for all fenced installations within the installation fence. Dusting/sweeping & mopping shall be done daily. Stores/expendables as deemed fit shall be responsibility of contractor. Disinfactarent (toilet cleaner/floor cleaner) shall be used during mopping as a daily practice.
Note for Serial item No 1.00 to 7.00 Contd/.... (g) The opration and maintenance includes replacement/fixing of minor spare parts required for smooth functioning of plant spare part issued by department, if not available to be arranged by the contractor for smooth running of equipment (h) Contactor will provide reliver for weekly rest at all installation by providing one reliever of same trade. (j) It is the responsibilities of Contractor to maintain the required humidity and temperature at all times. (k) It is the responsibilities of Contractor to rectify the damage/repair occurred due to negligencey of the plant being operated by the operator. (l) Proper uniform, label containing name plate of the operator and safety shoes as approved by Engineer-in-Charge shall be worn by operator on duty. If any operator found in improper uniform and or found without proper name plates contractor shall be liable to pay penalty at the rate of Rs 150.00 per shift of 8 hours per person. (m) Proper facilities for sitting/ rest area shall be the responsibility of contractor. (n) Operator on duty shall not be allowed to leave the installation without reliever. Any operator found absent from duty a recovery of Rs. 150/- per hour per installation for the period of absent will be made from the contractor. (o) First aid box kit with required medicines will be properly maintained by the contractor at all installations. (p) Generator set will be operated on the failure of electricity supply or as directed by Engineer in Charge. Contractor shall be responsible for removal of minor faults such as air lock in fuel supply, leakage of fuel, cleaning of fuel tank, tightening of connections of batteries, dynamo and self starter etc.
Note for Serial item No 1.00 to 7.00 Contd/.... (q) All the installations will be maintained neat and clean with removal of grass/ bushes on daily basis. (r) Contractor will submit details of deployed manpower along with qualification certificate such as ITI certificate (Refrigeration/Electric) for qualified personnel and and alongwith experience certificate for three years for skilled personnel, within fifteen days from the date of commencement of work to GE duly verified by Engineer-in-Charge. A minimum ratio of one is to three be maintained for ITI qualified personnel to skilled tradesmen. Contractor shall be liable to pay penalty at the rate of Rs 100.00 per person per day if required qualification certificates of deployed manpower not submitted after fifteen days from the date of commencement of work. (s) Duty roaster for deployment of manpower installation wise will be prepared by the contractor and submitted to Engineer-in-Charge for verification. (t) The payment of contractor’s employees will be made through Nationalized bank account of individual only. Contractor will submit the payment proof i.e. passbook of bank account (showing the payment entry of every month from the date of commencement onwards till completion of work) at the time of submission of RAR and final bill. Contractor’s shall ensure minimum fare wage as applicable of his employees and proof of payment duly verified by Engineer-in-Charge shall be submitted at the time of submission of RAR and final bill. No RAR/Final bill will be paid without submission of proof of payment.
Note for Serial item No 1.00 to 6.00 Contd/.... (u) Contractor shall upload copy of registration certificate of his firm with Employee Provident Fund organization while uploading of tender documents. It is a mandatory requirement and tender will be rejected in case of non submission of EPF registration certificate. Contractor will maintain all necessary documents regarding deposit of Provident Fund of employees during currency of contract period. It will be the responsibility of contractor to follow the rules and regulations of Employee Provident Fund organization strictly. (v) Daily inspection report as per prescribed format will be submitted to GE by contrctor duly signed by user, Engr-in-charge and JE concerned. (w) Operating staff shall wear uniform of white colour or as approved by GE (x) Contractor will be responsible for collection and consumption of fuel. for running of DG Set in AC Plants while Break Down of electricity supply. Transportation of fuel shall be the responsibility of contractor. Proper record/ log book of running of DG set shall be maintained by the contractor duly singed by JE and Engineer-in-Charge. Any consumption without run of DG Set will be recovered at double the market rate from contractor’s dues. Fuel shall be issued through issue vouchers duly signed by contractor and concerned staff at the time of collection of POL. (y) Switch on/off the security lights are in the surrounding area of the AC plants and DG sets as per time schedule fixed by the Engineer-in-Charge (z) Constractor shall arrange mobile set for inter commucication with all and mobile bill shall be born by the contractor.
Note for Serial item No 1.00 to 7.00 Contd/.... (aa) Requirement of T&P for day to day maintanence of refrigeration mech like piler, screw driver, test lamp, tong tester, temperature meter, humidity meter, first aid box etc are arrange by contractor for each plant.
M & L for overhauling & servicing of RO Plant of capacity 11000 Ltrs/hrs including replacement of all bag filters ,catridge filter,backwash of membrane (including chemical ) ,tightening of all bends and coupling of PVC Pipe ,checking of electrical and control wiring etc including testing of water from authorised lab after every service to check the desired value of drinking water ,complete all as specified and directed by Engineer-in-charge . Note :- Spare parts suitable for existing plant required to be replaced shall be separately under respective items .
Supply only Bag filter of size 7 "x 32 "
Supply only Catridge filter of size 40 x 2.5 "
Supply only anti scaling chemical (Sodium hydrocide cytric acid ) for R O Plant.
Supply only chemical for maintainiing PH value of RO Plant within permisible limit
Supply only salt (NACL) used for regeneration of resin filter installed in RO Plant .
Supply only granuler activated carbon material for Ro Plant
Disconnecting & dismantling the defective three phase induction motor squirrel cage of any make and of capacity 2 HP 415 Volts, 50 HZ, 2850 RPM and rewinding the motor with super enamelled copper wire of first quality of existing size/gauge and weight including replacement of all insulation materials, varnish and all other petty items required to make motor functional and re-assembling the motor including installation commissioning and testing on full load complete all as specified and directed. Note:-(a) Transportation charges from installation to contractor works shop and back after repair are included in the rates quoted against the above items. (b) Cost of nuts, bolts, washers, connection plate, grease/ lubrication to bearing bushes etc, are deemed to be included in this item. (c) Old dismantled winding wire will be contractor property for which credit has been considered under schedule of credit.
All as per srl item No.15 here-in-before but motor of capacity 3 HP.
All as per srl item No.15 here-in-before but motor of capacity 5 HP.
All as per srl item No.15 here-in-before but motor of cap 7.5 HP.
All as per srl item No.15 here-in-before but motor of cap 15 HP.
All as per description of serial item No.15 here-in-before but motor of capacity 30 HP.
“Supply only Stequa 411 AE plastic cylindrical sealed disposable sanitiser refill for disinfication of drinking water with arrangement for operation through suitable feeder in pressurezed line. Replacement Indication : visual & weight variation Operation type : Non Contact,non inhalatory Cylinder Dia : 2.5 Inches +/- 0.5 Inches Cylinder height : 1q0.0 Inches +/- 0.5 inches Model :Stequa 411 AE or Equaivalent Make :Declibac Technologies Pvt Ltd” or Equaivalent
Supply only Altoch-GP (Calcium based granular disinfectant more stable than chlorine gas & stronger than bleaching powder and sodium hypochlorite) for treatment of drinking water. Packing in 45 Kg plastic drums. Make : Declibac, Brand name : "ALTOCH-GP" or equivalent.
Supply Dewatering Polyelectrolyte (DWPE ) powder ,dewatering of organic sludge from sewage complete all as specified and directed by Engr-in-charge
Contract Amount shall be derived after affecting the amount of Schedule of Credit in General Summary on serial page No 15 of tender documents.
SRI SAI CONSTRUCTION COMPANY
Vishal Traders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .