Tender Value
₹76.6 L
EMD Value
₹1.5 L
Closing Date
9 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD
14 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited\ Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: 1.Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or 2.Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or 3.One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Definition of Similar Work(s) mentioned under Standard Technical Criteria: "Execution of any 1500 V DC or 25 kV AC OHE work"
2 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The tenderer firm should have Valid Electrical Contractors License granted by the Government. Tenderers should submit the copy of these certificates along with the tender document failing which the offer will liable to be rejected.
TRD Work in connection with Provision of 06 meter wide FOB with ramp at Vikramnagar and Ujjain (BPL end) under Simhastha 2028
EL-TRD-58-2025-26-18RT~WR
EL-TRD-58-2025-26-18RT
Open
Works - General
12 Months
Ratlam, Madhya Pradesh
₹0
₹1.5 L
9 Mar 2026
10 Feb 2026
23 Feb 2026
68 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 76,61,631 | ||
| — | Per | Track KM | — | ||
| — | 2.00 | — | — | ||
| Preparation of designs and drawings for over head equipment viz.-sectioning cum wiring diagram,power supply diagram, Traction working rule diagram and instructions etc .required for commissioning of OHE including approval from Consultant,Client & Railway. | — | — | — | 33,420 | |
| — | Breakup for | details. | — | ||
| Supply and erection of all types of galvanized steel structures with SPS. | — | — | — | 29,09,520 | |
| — | 90.00 | — | — | ||
| Casting of foundation in all types of soil. | — | — | — | 6,19,740 | |
| — | Breakup for | details. | — | ||
| Supply and erection of Cantilever assly. | — | — | — | 6,70,020 | |
| — | Breakup for | details. | — | ||
| Supply and erection of a regulating equipment (3 pulley type) with counter weight assembly for Conventional OHE | — | — | — | 1,12,966 | |
| — | Breakup for | details. | — | ||
| Supply & Erection of FTA assly. | — | — | — | 78,350 | |
| — | Breakup for | details. | — | ||
| Supply and erection of guy rod assembly. | — | — | — | 84,231 | |
| — | Breakup for | details. | — | ||
| Supply and erection of copper jumpers. | — | — | — | 2,61,950 | |
| — | Breakup for | details. | — | ||
| Supply and Erection of all type of galvanized bonds (str./cross/long./special etc.) | — | — | — | 2,72,600 | |
| — | Breakup for | details. | — | ||
| Supply and erection of all types of danger/caution boards | — | — | — | 51,780 | |
| — | Breakup for | details. | — | ||
| Supply & Erection of retro reflective number plates for mast. | — | — | — | 21,120 | |
| — | 16.00 | — | — | ||
| Transfer of equipment from one mast or support to another and adjustment ofdroppers | — | — | — | 83,680 | |
| — | Breakup for | details. | — | ||
| Supply and erection of Soild Core Cut-in insulator (9 ton insulator) | — | — | — | 1,13,570 | |
| — | Breakup for | details. | — | ||
| Supply and Erection of Earthing station | — | — | — | 79,656 | |
| — | 20.00 | — | — | ||
| Dismantling of a cantilever assembly with insulators. | — | — | — | 32,440 | |
| — | 2.00 | — | — | ||
| Provision of Splicing and extension of an anchored overhead equipment | — | — | — | 58,680 | |
| — | 16.00 | — | — | ||
| Breaking of concrete foundation of Masts, portals & TTC. | — | — | — | 44,496 | |
| — | 10.00 | — | — | ||
| Providing (Supply and Erection) of sectioning diagram board at station. | — | — | — | 1,06,410 | |
| — | 20.00 | — | — | ||
| Provision of False Catenary under Bridge (Contact Wire supplied by Railway) | — | — | — | 4,94,400 | |
| — | 16.00 | — | — | ||
| Dismantling of mast, portal, TTC &other small part steel | — | — | — | 1,47,152 | |
| — | 8.00 | — | — | ||
| Dismantling and removal of guy rod assembly | — | — | — | 11,368 | |
| — | 2.00 | — | — | ||
| Dismantling of Regulating equipment with Counter Weight Assembely | — | — | — | 15,180 | |
| — | Breakup for | details. | — | ||
| Supply and Erection of 130Sq.mm copper large span wire | — | — | — | 7,64,400 | |
| — | Breakup for | details. | — | ||
| Supply & erection of anti-creep wire with necessary fittings and adjustor | — | — | — | 79,522 | |
| — | 2.00 | — | — | ||
| Dismantling & removal of termination assembly | — | — | — | 12,086 | |
| — | 2.00 | — | — | ||
| Dismantling & removal of existing anti-creep assemblies | — | — | — | 3,614 | |
| — | 500.00 | — | — | ||
| Erection of 150 sqmm copper feeder wire | — | — | — | 15,000 | |
| — | 300.00 | — | — | ||
| Dismanteling of 150 sqmm copper feeder wire | — | — | — | 9,000 | |
| — | Breakup for | details. | — | ||
| Supply & erection of materail of Termination for Copper feeder wire (150 sqmm) including 9-T insulator | — | — | — | 44,816 | |
| — | Breakup for | details. | — | ||
| Supply & erection of 25KV Post insulator | — | — | — | 80,040 | |
| — | Breakup for | details. | — | ||
| Supply & erection of 9-Tonne/suspension Insulator . | — | — | — | 1,01,280 | |
| — | 28.00 Each | Span | — | ||
| Slewing of OHE | — | — | — | 1,19,700 | |
| — | 28.00 Each | Span | — | ||
| Re-Slewing of OHE | — | — | — | 1,29,444 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCApril2022.pdf
ATTACHMENT
GCCACS1to10.pdf
ATTACHMENT
UJNVRGTDRT.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .