| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.8 CrAccepted-AOC KERADAMATTAM KOTAGIRI | ₹3.8 Cr Quoted ₹3.9 Cr | L1 | Accepted-AOC Lowest bidder accepted after negotiation |
| 2 | L2₹3.9 Cr+₹4.0 L (1.04%)Rejected-AOC | ₹3.9 Cr+₹4.0 L (1.04%) | L2 | Rejected-AOC Other than lowest bidder, rejected. |
| 3 | L3₹4.0 Cr+₹13.0 L (3.37%)Rejected-AOC NO 6 6 PERIYA SENGODAMPALAYAM THINDAL POST ERODE 638012 | ERODE | TAMIL NADU | 638012 | ₹4.0 Cr+₹13.0 L (3.37%) | L3 | Rejected-AOC Highest bidder, rejected. |
| Sl No | Description | Qty | Unit | RAJARAM AND CO L2 | K SARASWATHI AND CO L3 | purushothaman L1 |
|---|---|---|---|---|---|---|
| 1.00Removing the existing vegetation growth in the Building by way of uprooting the plants manually and then drilling with power driller up to the root depth of plants obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growths and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. The cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges, etc., complete and complying with standard specification and as directed by the departmental officers. | ||||||
| 1.10 | Small plant | 10 | Each | 300 ₹3,540 Lowest | 300 ₹3,540 Lowest | 300 ₹3,540 Lowest |
| 1.20 | Medium plant | 5 | Each | 350 ₹2,065 Lowest | 550 ₹3,245 | 350 ₹2,065 Lowest |
| 1.30 | Big plant | 3 | Each | 660 ₹2,336.4 Lowest | 660 ₹2,336.4 Lowest | 660 ₹2,336.4 Lowest |
| 2.00Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers. | ||||||
| 2.10 | For initial 3m height | 586 | Rm | 750 ₹5,18,610 | 572.43 ₹3,95,823.9 Lowest | 600 ₹4,14,888 |
| 2.20 | For every additional 2.50m height | 524 | Rm | 750 ₹4,63,740 | 473.95 ₹2,93,052.76 Lowest | 550 ₹3,40,076 |
| 3.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. | 323 | Sqm | 1,082.88 ₹4,12,728.88 Lowest | 1,082.88 ₹4,12,728.88 Lowest | 1,082.88 ₹4,12,728.88 Lowest |
| 4.00 | Dismantling and clearing away carefully and stacking materials useful for reuse of Cracked Madras terrace roof of approximately 31cm thick and conveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers. | 323 | Sqm | 459.24 ₹1,75,034.73 Lowest | 459.24 ₹1,75,034.73 Lowest | 459.24 ₹1,75,034.73 Lowest |
| 5.00 | Dismantling of Leaky weathering course with pressed tiles and disposing the debris including proper centering for the safety of labours etc., complete complying with standard specification and as directed by the departmental officers. | 582 | Cum | 49.2 ₹33,788.59 Lowest | 49.2 ₹33,788.59 Lowest | 49.2 ₹33,788.59 Lowest |
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
14 Aug 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer, PWD, Heritage Buildings Circle, Chennai -5.
Conservation Renovation and Restoration of Ranipet Revenue Divisional Office at Ranipet District.
2025_PWD_588071_1
26/HBC/2024-25
Open Tender
Civil Works - Buildings
Lump-sum
365 days
Ranipet
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.8 L
Yes
17 Oct 2025
2 Aug 2025
14 Aug 2025
2 Aug 2025
14 Aug 2025
2 Aug 2025
Amount
Removing the existing vegetation growth in the Building by way of uprooting the plants manually and then drilling with power driller up to the root depth of plants obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growths and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. The cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges, etc., complete and complying with standard specification and as directed by the departmental officers.
Small plant
Medium plant
Big plant
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.
For initial 3m height
For every additional 2.50m height
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
Dismantling and clearing away carefully and stacking materials useful for reuse of Cracked Madras terrace roof of approximately 31cm thick and conveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of Leaky weathering course with pressed tiles and disposing the debris including proper centering for the safety of labours etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling and clearing away carefully and stacking materials useful for reuse the damaged brick masonry walls of the building and to dispose debris etc complete complying with standard specification and as directed by the departmental officers.
Removal of damaged wooden doors and windows and clearing away carefully and stacking materials useful for reuse without causing any damage to the existing ancient brick masonry wall including carefully removing brick corners of doors and windows etc complete complying with standard specification and as directed by the departmental officers.
Carefully removing , clearing away and carefully stacking materials useful for reuse of the decayed wooden beam/joist/girder in Madras terrace roofing in all floors by carefully dislodging at ends and top including making necessary notches or openings in the wall on either side of joist, beam to enable it removed etc., complete complying with standard specification and as directed by the departmental officers.
Removal of the existing detoriated lime plastering over the wall, arches, domes and special type of ceiling of Madras terraced type roof carefully without disturbing or damaging the rafters, etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc.,
Dismantling of damaged and undulated flooring, Dadooing walls and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening the existing walls by providing grouting by formation of two holes of size 1" with required intervals - depth of 300mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening of the brick foundation of the wall with similar type of bricks by the method of mending / under pinning/ grouting etc., as per the existing clues with lime mortar 1:2, (one of lime and two of sand) etc., including scooping out the eroded/ damaged brick and cleaning the surface etc., complete complying with standard specification and as directed by the departmental officers.
By using 25 Nos bricks in 1 sq.m of area
By using 50 Nos bricks in 1 sq.m of area
Carefully removing and scooped out the eroded and worn out bricks over the wall, arches and pillar etc and refixing and mending with similar bricks in lime mortar 1:2 (one of lime and two of sand) etc., complete complying with standard specification and as directed by the departmental officers.
By using 25 Nos bricks in 1 sq.m of area
Racking out the brick joints of walls, arches, etc.,to a depth of approximately 5cm for a wall thickness of 45cm and above to remove the dead mortar in between the brick joints and cleaning the surface with coir brush and washed with pure water etc complete complying with standard specification and as directed by the departmental officers.
Pointing,grouting and filleting the brick joint of wall and arches with lime mortar 1:2 (one of lime and two of sand) using lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Reconstruction of brick masonry wall with similar type of bricks in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9"x4"x3" (Specially manufacturing) and using lime in all floors as per traditional preparation and documented type construction such as arches and lintels, walls, etc., complete complying with standard specification and as directed by the departmental officers.
For Ground Floor
For First Floor
Grouting and stitching the cracked wall and arches by toothing method including required terrace bricks of size 8"x 4" x 2" wherever necessary and cutting of groove and fixing of key stone of size 900mm x 230mm x 200mm and finishing the surface with lime mortar 1:2 (one lime and two sand) as per original etc complete complying with standard specification and as directed by the departmental officers.
Renewing the damaged ornamental cornice around the outer wall cornice portion as per existing style and clues to a height of 0.25m with top and bottom width of 0.28m and 0.08m respectively including removing the brick work and redoing the brick work in lime mortar 1:2 (one of lime and two of sand) and plastering with lime mortar 1:2 (one of lime and two of sand) 30mm thick laid in two layers and finishing with lime mortar 1:1.5 (one lime and one and half sand) 6mm thick (Theeravai) using lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Easing and repairing hanging doors, window shutters and refixing the same after attending the petty repairs including fixing furniture fittings and excluding cost of furniture fittings etc., complete complying with standard specification and as directed by the departmental officers.
Renewing and fixing teakwood panelled shutters openable type for Doors by using well seasoned teakwood of superior quality and approved variety as per the original design and pattern instructed by the Engineer In Charge.The door shutter is made with two number of 120mm x 40mm size vertical styles, toprail, lock rails and bottom rail of size 125mm x 40mm , 250mm x 40mm, 170mm x 40mm respectively.The door shutter panels is covered with teakwood planks of 25mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handles, aldrops of same design, size and weight,etc., complete. Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers. (The rate inclusive of cost of all teakwood materials, labour wrought and putup of door frames and shutters , cost of all furniture fittings, labour charges for fixing in position etc., complete complying with standard specifications (two leaves).
Renewing and fixing of panelled window openable type by using well seasoned teakwood of superior quality as per the original design and pattern instructed by the Engineer In Charge. The window shutter is made with two number of 75mm x 35mm size vertical styles, top rail, respectively. The window shutter panels is covered with teak wook planks of 35mm thick including all necessary fittings brass/ steel hardwares like screws, nails, hinges, hooks, tower bolts, handles, aldrops of same design, size and weight,etc Item to also include making all the mouldings and design of the panels as in the existing evidence. Item to include complete finishing of the shutters as directed by the departmental officers.(The rate inclusive of cost of all teakwood materials, labour wrought and putup of door shutters, cost of all furniture fittings, labour charges for fixing the shutters in position etc., complete complying with standard specifications)
Labour charge for removing painting in TW joist , beams , doors , windows etc., as per std specification
Supplying and fixing MS grills for doors, windows and ventilators of approved design and as directed by the departmental officers including cost of MS grills labour charges and cost of one of red oxide primer coat etc., complete complying with std. specification.
Teakwood wrought & putup for joist, beam, rafters and purlins,etc., which are in full length new member placed for supporting the Madras Terrace roof/ Mangalore tiles roof or any other area in all floor as directed by the departmental officers by using well seasoned superior quality and approved variety of teakwood for heritage building work including fixing of iron holdfasts incase of doors, windows and ventilators etc.,and excluding cost of holdfasts and making necessary size holes in the masonry to receive the ends of wooden joists, beams, etc., all fixtures and fastenings etc., complete. Item to include all moulding and chamber to be made as per original design indicated by the Engineer In Charge. (The rate includes the cost of teakwood, labour charges for wrought and putup to the existing clue/design, fixing in position to true alignment and gradient wherever necessary. Complying with standard specifications and as directed by the departmental officers (sample of teakwood to be shown to the Executive Engineer concerned for approval before use on work). Application of Solignum on the wooden surface should also be done. In all floors
Redoing of Madras Terrace roof in all floors with one layer of brick on edge course laid as first layer over the existing Teakwood joists, Beams, I Sections, etc., which are placed at roof level in all floors using specially manufactured Terrace bricks for heritage works of size 150mm x 75mm x 25mm in lime mortar 1:1.5 (one lime and one and half sand). The second layer is laid with specially manufactured Terrace bricks for Heritage works of size 150mm x 75mm x 25mm in flat manner in lime mortar 1:2 ( one lime and two sand) 20mm thick as base layer laid over the top of brick on edge course.
Brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be added) to the proportion of brick jelly to lime being 32:12.50 by volume laid over the second layer of terrace bricks for an average consolidated thickness of 100mm in a single layer of required slope/level as directed and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery (PALM JAGGERY) water. (Galnut of 10kg and jaggery of 10kg per one sq.m). The beating of the concrete is done continuously until the brick jelly lime concrete is well hardened.
After ensuring the harden surface of brick jelly lime concrete, flat tiles of 150mm x 150mm x 25mm of specially manufactured superior quality to suit the heritage works is laid in two consecutive layers in lime mortar 1:2 (one lime and two sand) 15mm thick for each layer of flat tiles. The base mortar provided for the top course of flat tiles is mixed with SBR (Synthetic Butadiene Rubber) Polymer at the rate of 0.5 litres for one sq.m is applied for water proofing chemical treatment including neat finishing. The Materials like Terrace bricks for the heritage work and lime should only be used. The period of interval between laying of I layer, II layer of terrace bricks, brick jelly lime concrete and flat tiles in two consecutive layers as directed by the departmental officers etc., complete complying with standard specifications.
The Madras Terrace roof laid over the roof joist, beam, etc., is well embedded in the wall to the required distance as directed by the Engineer In Charge. (The rate includes the cost of all materials like terrace brick for heritage works, brick jelly 20mm, lime, flat tiles and SBR chemicals and labour charges for laying all items of works). lime should only be used for preparation of mortar, brick jelly lime concrete etc., The Terrace bricks, flat tiles should got approved by the Executive Engineer before use on works. The overall thickness of madras terrace roof laid is to be of 300mm as detailed below. Brick on edge course (I layer) = 75mm Base mortar for laying terrace bricks = 20mm Laying of terrace bricks (II layer) = 25mm Brick jelly lime concrete = 100mm Base mortar for flat tiles = 15mm Laying flat tiles(I course) = 25mm Base mortar for flat tiles (II layer) = 15mm Flat tiles (II course) = 25mm Total thickness = 300mm
Replastering ( base plastering) the brick wall, pillars and arches, etc., with lime mortar 1:2 ( one of lime and two of sand) to a thickness of 30 mm laid in two layers of 15mm thick using lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Replastering the ceiling with Lime mortar 1:1.5 (one Lime and one and half sand), 20mm thick including labour charges for erection and dismantling of scaffolding and curing etc complete complying with standard specifications as directed by the departmental officers.
Applying thin coat of hand grinded lime mortar paste in lime mortar 1:1.5 (one lime and one and half sand) 6mm thick using lime in all floors (mix should be with 5.9 kg of jaggery, 2 kg of glue, 1.1 kg of gallnut, 1.4 kg of oakum, 30 nos eggs, 1 litre curd, 3 kg white marble powder, 0.5 kg vajram, 0.06m3 of surki, (for 10 sq.m area) of mugal plastering (Theervai) over the newly plastered surface as per the existing clues (including finishing the surface with smoothness) `etc., complete complying with standard specification and as directed by the departmental officers.
Revarnishing the old / new wood work with two coats of best melamine varnish of approved quality and brand including preparation of surface etc., in all floors The rate is inclusive the cost of all material, labour charges and finishing neatly etc., complete complying with standard specification and as directed by the departmental officers.
Painting wood work with two finishing coats of synthetic enamel ready mixed paint of good quality and approved variety and colour over one coat priming coat in all floors including the cost of priming coat etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting new/old iron works with two coats of anti corrosive paint of best quality and approved variety of synthetic enamel paint including cost of brushes etc., in all floors complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.).
Providing pest control with antitermite treatement drilling holes at junction of walls with floors at 300mm intervals and injucting chemical emulsion on those with cement etc. making holes along the vertical surface out side the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical.(The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc complete complying with standard specification and as directed by the departmental officers.
Laying Brick jelly lime concrete in lime mortar 1:2 ( One lime and two brick jelly ) (no sand to be added) using 20 mm gauge brick jelly for foundation, flooring including dewatering wherever necessary and laid in layers well rammed, consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:2 (One lime and Two sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of lime used and the joints pointed neatly to full depth of tiles with lime mortar 1:1.5 (One Lime and One and half Sand)mixed with red oxide and water proofing compound etc., complete complying with standard specification and as directed by the departmental officers.
Paving the floor with best quality Matt Finish Heritage pattern Special Desing Vitrified Tiles of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three M-sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make, quality and colour of tiles should be got approved by the Executive Engineer before use on works.)
Painting the wall with two coats of approved weather proof Exterior Emulsion paint over one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Construction of mortar pit of inner size 0.90m x 0.45m with brick partition wall 11.50cm thick in cement mortar 1:3 (one cement and three sand) for 60cm height with necessary earth work open excavation for a size of 1.43m x 0.98m to a depth of 0.91m and sand filling for 15cm thick, Plain Cement Concrete 1:5:10 (one cement, five sand and ten 40mm HBG stone jelly), 8cm thick with plastering 1:5 (one cement and sand), 12mm thick on both sides and top etc., complying with standard specification and as directed by the departmental officers.
Conveying the debris,dismantled materials from the campus and conveying away the same to outside by lorry to a lead of 3km entirely within the city limit including loading and unloading charges and dumping in low lying areas and levelling neatly etc.,complete complying with standard specification
Renewing the damaged sunshade of trapezoidal shape with new superior quality of teak wood, Manglore tile roofing at the top. The sunshade if fixed on wall with teak wood of size 80mmx 100 mm fixed on the wall directly, additional inclined brcing provides on the sides of window using teak wood sized 80mm x 80mm , the top teak wood 50mm x 80mm in cross section from the wall is rested at end running member 80mm x 100mm . The top manglore tiles are rested on best teak wood reepers of size 50mm x 25mm . the rate inclusive of cost of dismantling damged tile, teak wood members without damaging to the wall, refixing, labour charges, but excluding of scaffolding charges, etc., complete complying with standard specification and as directed by the departmental officers.
Providing water membarane treatement to the leaky terrace using Synthetic Butadine Rubber sheet (SBR) including hacking the surfaces and roughening the old RCC roof surface with wire brushes and tools wherever necessary and the Synthetic Butadine Rubber sheet (SBR) has been laying before weathering course brick jelly concrete and with using necessary SBR adhesive to carefuly laying with proper joints ( the joints over lap to be not more than over lap 15cm to 20cm ) etc, including labour for laying the sheets etc complete including curing and finishing neatly complying with standard specification and as directed by the departmental officers.
Dismantling and clearing away carefully and stacking materials useful for reuse of damaged Mangalore tile roofing including removal of pan tiles , wooden reeper with T.W. planks and stocking of the useful materials etc. complete complying with standard specification and as directed by the departmental officers.
Laying of roofing with Mangalore tiles over flat tiles set in Lime mortar 1:2 ( one of lime and two of sand) using lime in all floors with flat tiles of size 150mm x 150mm x 12mm including Teak wood reepers of size (50mm x 12mm) complete complying with standard specification and as directed by the departmental officers. (The rate includes the cost of all materials like Mangalore tiles, flat tiles, and labour charges for laying of Mangalore tiles with flat tiles roof in position)
Making, supplying and fixing of Teak wood Glazed window shutter with new Teak wood glazed window shutter by using Teak wood scantling thickness of size 0.04m both vertical 2-Nos Horizontal 2-Nos and intermediate frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the shutter in position with necessary furniture fittings such as Aluminium Butt hinges 125x30mm-3Nos Aluminium Hooks or eyes -6”-2Nos and tower bolt 3”-1 No including finishing the shutter with one coat of primer and finishing neatly etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and fixing ISMB girder of Suitable size for the various spans using laid below the madras terrace roof in the places of rafters to support the roof and also along the either side of walls below the wooden rafter and fixed ISMB ‘I’ Section over the cable blocks the rate including cost of dismantling the brick work wherever necessary for fixing the ‘I’ Section and redoing the same and also the cost of ‘I’ Section labour charges hire charges for welding machineries, hoist for lifting and hire charges for hydraulic manuals Jacky, two legged scaffolding, centering for adjacent rafters and other allied tools etc., complete including the cost of porting of ISMB ‘I’ section etc and one coat of red oxide primer etc., complete. The I beam has to be supported on brick wall usig appropiate blocks so as to support the madras terrace roofing in all the floors etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and laying of Interlocking Paver Block Stone 60mm thk. Over a base layer of crushed stone sandfilling incl. Cost of materials laying and Labour charges etc.,
RAJARAM AND CO (BID ID -1429072)
K SARASWATHI AND CO (BID ID -1429369)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_702589.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .