| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Lowest Amount Quoted BY Skyline Construction
Called for Negotiation Amount Rs.10573373.33 |
| 2 | L2₹1.1 Cr+₹49,969.46 (0.45%)Rejected-Finance NO 3 VISHNU NAGAR MAIN ROAD PONNIAMMAN MEDU MADHAVARAM CHENNAI 600 110 | THIRUVALLUR | TAMIL NADU | 600110 | ₹1.1 Cr+₹49,969.46 (0.45%) | L2 | Rejected-Finance 6.62 above ER not accepted |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
3 May 2023, 3:00 pmClosed
COLLECTOR / CHAIRMAN
COLLECTOR / CHAIRMAN DRDA TIRUVALLUR
1 STRENGTHENING OF BT ROAD FROM SSTR TO BALAMURUGAN NAGAR VIA SIVANTHI ATHITHAN NAGAR AT NALLUR 2 BT ROAD FROM ALAMATHI B COLONY TO VENMANI NAGAR AT ALAMATHY 3 BT ROAD FROM KANDIGAI VILLAGE ROAD AT BUDHUR PACK 39
2023_RDTN_305241_1
DIPR/2142/TENDER/2023
Open Tender
Civil Works - Roads
Works
180 days
AC D DRDA TIRUVALLUR
AS PER DOCUMENTS
3 documents required · 3 mandatory
₹0
₹1.1 L
Yes
AC D DRDA TIRUVALLUR
19 Jul 2023
22 Apr 2023
3 May 2023
22 Apr 2023
3 May 2023
25 Apr 2023
25 Apr 2023
Amount
1.STRENGTHENING OF BT ROAD FROM SSTR TO BALAMURUGAN NAGAR VIA SIVANTHI ATHITHAN NAGAR @ NALLUR PANCHAYAT CH 0/0 - 0/600 KM
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Applying TACKCOAT over WBM/ WMM surface at 2.50Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous conctrete 25,30/40mm Thick using cmp providing and laying Bituminous concrete to 40mm thick using grades of metal etc
Collection and supply of carted earth from approved quarry
Provision for HM Stone Charges etc,..
Provision for Name board and Painting Charges.,
Provision for sign board
Providing for road marking with hot applied thermoplastic compound with Reflectorising Glass beds on Bitiminious surface etc.,
Provision fot Rumble stripes
Provision for Reflectors
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
2. STRENGTHENING OF BT ROAD FROM ALAMATHI B COLONY TO VENMANI NAGAR @ ALAMATHY PANCHAYAT CH 0/0 - 0/650 KM
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WBM/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Applying TACKCOAT over BM surface at 2.50Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous conctrete 25,30/40mm Thick using cmp (Grade-II) providing and laying Bituminous concrete to 40mm thick using 0.13cum grades of metal etc
Collection and supply of carted earth from approved quarry
Provision for HM Stone Charges etc,..
Provision for Name board and Painting Charges.,
Provision for sign board
Providing for road marking with hot applied thermoplastic compound with Reflectorising Glass beds on Bitiminious surface etc.,
Provision fot Rumble stripes
Provision for Reflectors
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
3.STRENGTHENING OF BT ROAD FROM KANDIGAI VILLAGE ROAD @ BUDHUR PANCHAYAT CH 0/0 - 0/600 KM
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
Applying TACKCOAT over BM surface at 2.50Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Bituminous conctrete 25,30/40mm Thick using cmp (Grade-II) providing and laying Bituminous concrete to 40mm thick using 0.13cum grades of metal etc
Collection and supply of carted earth from approved quarry
Provision for HM Stone Charges etc,..
Provision for Name board and Painting Charges.,
Provision for sign board
Provision for White border line
Provision fot Rumble stripes
Provision for Reflectors
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SREE PACHAIAMMAN CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .