| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical TYPE 2 RITURAJ SINGH AKBARPUR SARAI GHAGH KANNAUJ UTTAR PRADESH SARAIMEERA KANNAUJ UTTAR PRADESH 209725 | KANNAUJ | UTTAR PRADESH | 209725 | Accepted-Technical Qualified |
| 2 | Accepted-Technical NH 148 B NEAR BABA GHISARAM FILLING STATION VILLAGE PALI MAHENDERGARH 123029 | MAHENDERGARH | MAHENDERGARH | HARYANA | 123029 | Accepted-Technical Qualified |
| 3 | Rejected-Technical | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | Rejected-Technical Not Qualified |
Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
17 Aug 2026, 5:00 pmClosed
Manoj Singhal
Executive Engineer (E), Gurugram
S/I/T/C of 340 Kwp Rooftop Grid Connected Solar Power Plant in Distt. Jail Nuh.(Including CAMC of 5 Year).
2026_HBC_538639_1
20265F6470C6 2804 47D8 BA24 A450C90EA15D57HHC
Open Tender
Civil Works
Works
180 days
Salamba
S/I/T/C of 340 Kwp Rooftop Grid Connected Solar Power Plant in Distt. Jail Nuh.(Including CAMC of 5 Year).
2 documents required · 2 mandatory
₹17,700
₹2.8 L
Yes
15 Sept 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | [32.70.3]Supply Installation testing commissioning of Solar Photovoltaic grid connected roof top Plant conforming to MNRE specifications as amended, consisting of Mono/Poly Crystalline silicon solar cells, net metering facility, necessary protections, earthing, mounted on Aluminium/GI structure of suitable strength with following components complete as required:-
(a) Solar Photovoltaic Module manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion efficiency shall not be less than 16.5%. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
(b) Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 400 V AC, three phase, 4 wire, 50Hz plus /- 2.5 Hz, output voltage suitable to generate AC
(c) Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degrees C. The PCU shall adjust the voltage and frequency level to suit grid frequency
(d) Data Monitoring System complete with accessories.
(e) Fixing of Array junction box and Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required.
(f) Lightning and surge voltage protection.
(g) Connections and Interconnections by supplying and fixing required size XLPE insulated copper conductor 1.1 kV grade armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying and fixing of necessary channel/conduit lugs and other accessories etc. as required. 3. Above 100 kWp and up to 500 Kwp [Through Rate] | 340 | KWp | 40,003 | ₹1,36,01,020 |
| 3 | Operation and maintenance of complete Solar Power Plant for 3rd Year on quarterly basis after Completion of Two Year free Operation and Maintenance period Including regular servicing/cleaning of Solar SPV modules, Invertor /PCU and other items with all labour and petty material required to complete the job in all respect upto entire satisfaction of the Engineer-In-charge of the work. | 4 | Each | 34,002 | ₹1,36,008 |
| 4 | Operation and maintenance of complete Solar Power Plant for 4th Year on quarterly basis Including regular servicing/cleaning of Solar SPV modules, Invertor /PCU and other items with all labour and petty material required to complete the job in all respect upto entire satisfaction of the Engineer-In-charge of the work. | 4 | Each | 35,703 | ₹1,42,812 |
| 5 | Operation and maintenance of complete Solar Power Plant for 5th Year on quarterly basis Including regular servicing/cleaning of Solar SPV modules, Invertor /PCU and other items with all labour and petty material required to complete the job in all respect upto entire satisfaction of the Engineer-In-charge of the work. | 4 | Each | 37,488 | ₹1,49,952 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_617837.xls
BOQ • 0.39 MB
CA89FDZ162649.pdf
Additional Documents • 5.53 MB
OT0162649.pdf
Other Document • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .