SE EDC-II GORA BAZAR RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
ANNUWAL MAINTENANCE REPAIRING AND REPLACEMENT OF DAMAGE POLE AND LINE UNDER EDD UNCHAHAR
2024_MVVNL_944014_1
36/EDC-II,R/2024-25
Open Tender
Electrical Works
Item Rate
365 days
EDD UNCHAHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
ICICI BANK A/C 081205500344/ IFS CODE ICIC0000812
₹6,500
Yes
3 Sept 2024
6 Aug 2024
28 Aug 2024
7 Aug 2024
27 Aug 2024
7 Aug 2024
Amount
CORTAGE OF STOR ITEMS FROM ESC TRIPULA RAEBARELI TO DUMP SITE AND DUMP SITE TO WORK SITE ALONGWITH LOADING UNLOADING AND PROPER STACKING:-
11 Mtr long ST Pole.
8.5 Mtr long PCC Pole.
AB Cable in size 3x70/ 3x50 / 3x95 / 3x120 sq.mm
AB Cable in size 1x16/ 1x25 sq.mm
ACSR Weasal Conductor
11 KV Disc Insulator with Disc ftting (B&S) 70 KN
33 KV Disc Insulator with Disc ftting (B&S) 70 KN
11 KV Pin Insulators with G.I. Pin
33 KV Pin Insulators with G.I. Pin
11 KV Stay Set Complete alongwith Clamp
33 KV Stay Set Complete alongwith Clamp
G.I. Wire
M.S. Earthing Complet with Rod (2540X20 MM) with fitting
11 KV "V" Type X-Arms alongwith Clamp
33 KV "V" Type X-Arms alongwith Clamp
11 KV "F" Clamp
33 KV "F" Clamp
Related Loose Line Materials.
ERRECTION & LABOUR CHARGES:-
Dismantling of Broken & damage old PCC Pole 8.5 Mtr long, alongwith all related accessories then Stacking a Place, alongwith loading unloading.
Dismantling of Broken & damage old ST Pole 11.00 Mtr long alongwith all related accessories then Stacking a Place, alongwith loading unloading.
Errection of PCC 8.5 Mtr long, with Fitting of all related accessories as per RESPO Norms.
Errection of ST Pole 11.00 Mtr.long, with Fitting of all related accessories as per RESPO Norms.
Digging of PCC Pole to pit side then Grouting of PCC Pole 8.5 Mtr long, with grouting materials as per RESPO Norms.
Digging of ST Pole to pit side then Grouting of ST Pole 11.00 Mtr long with grouting materials as per RESPO Norms.
Earthing of existing old Poles as per RESPO Norms.
Laying , stringing & sagging of HT/LT Line by AB conductor size in 3x70/3x50/3x95/3x120 sq.mm including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required.
Maintenance & Repairing of old & Jarjar LT ABC Condutor in size in 3x70/3x50/3x95/3x120 sq.mm including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required.
Replacement of old & Jarjar AB Cable be New AB Cable 1X16/1x25 sq.mm
Maintenance & Repairing of LT ABC Line in size in 1x16 / 1x25 sq.mm including all associated work & making clearance of Road with Joint/jumpers & binding on insulators as required.
Replacement of old & Jarjar 11 KV Stay Set Complete by New Stay Set.
Maintenance & Repairing of old & Jarjar 33 KV Stay Set Complete by New Stay Set.
Replacement of 33 KV Stay Set Complete
Maintenance of Old & Jarjar of 33 KV Stay Set Complete
Installaltion of new 33 KV Pin Insulators with G.I. Pin
Installaltion of new 11 KV Pin Insulatiors with G.I. Pin
Making/Fixing/Installation of 33 KV "V" Type X-Arms.
Making/Fixing/Installation of 11 KV "V" Type X-Arms.
Making/Fixing/Installation of 33 KV Disc Insulators alongwith fitting of (B&S) 70 KN
Making/Fixing/Installation of 11 KV Disc Insulators alongwith fitting of (B&S) 70 KN
Making/Fixing/Installation of 33 KV "F" Clamp
Making/Fixing/Installation of 11 KV "F" Clamp
Installation of Earthing Rod (2540X20 mm) with fitting of G.I. Wire as per RESPO Norms.
Replacement of Old & Jarjar ACSR Weasal Conductor of 11 KV HT Line
Maintenance & Re-Stringing & Sagging of Loose Conductor of old 11 KV Line 3 Phase 3 Wire .
Maintenance & Repairing of Tilted PCC/ST Poles.
Febrication of Line Materials and other Misc Work as required
Looping/Chopping/Cutting of Tree branches for Clearance of 11 KV HT Line/ LT Lines & 440 Volt Line due to tuching of 33 KV/11 Kv/LT & 440 Volt Lines.
JYOTI CONSTRUCTION AND SUPPLIER
Jiya Construction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .