| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC | ₹3.6 Cr | L1 | Accepted-AOC After Qualifing the technical bid, M/S M/S PRATAP NIRMAN SANSTHAN is found to be first lowest bidder in finecial bid, Hence Agreement No. 03/SE/2020-21 is done with M/S PRATAP NIRMAN SANSTHAN |
| 2 | L2₹4.0 Cr+₹43.4 L (12.1%)Rejected-AOC PLOT NO 63 PAHADIYAN DISTRICT VARANASI UTTAR PRADESH | VARANASI | UTTAR PRADESH | 221001 | ₹4.0 Cr+₹43.4 L (12.1%) | L2 | Rejected-AOC After Qualifing the technical bid,S.P.R.U INFRATECH PRIVATE LIMITED is found to be Second lowest bidder in finecial bid, Hence disqualifing for the Agreement. |
| 3 | L3₹4.1 Cr+₹48.8 L (13.7%)Rejected-AOC | ₹4.1 Cr+₹48.8 L (13.7%) | L3 | Rejected-AOC After Qualifing the technical bid, Rajiv And Company is found to be third lowest bidder in finecial bid, Hence disqualifing for the Agreement. |
Tender Value
Refer Docs
EMD Value
₹8.1 L
Closing Date
23 Feb 2021, 5:00 pmClosed
Superintending Engineer
Office of Superintending Engineer Irrigation Work Circle Obra Sonebhadra 231219
C.C.lining of Sone Pump Canal from Km. 11.183 to Km. 12.750
2021_UPIDC_553269_1
Tender Notice No. 04/S.E./2020-21
Open Tender
Civil Works - Canal
Item Wise
330 days
Gurma, Sonebhadra
Please Refer Tender Document and Tender Notice
2 documents required · 2 mandatory
₹2,750
₹8.1 L
16 Mar 2021
9 Feb 2021
24 Feb 2021
15 Feb 2021
23 Feb 2021
15 Feb 2021
Amount
Ordinary jungle clearance where growth is continuous. Scrapping humas from internal & external slope upto existing ground with its proper disposal including cost of all Labour, material and T&P etc. Complete.
Earth work in filling for widening of Sone pump canal section (Internal & External) with proper dressing and manual compaction including cost of all labour, material and T&P required for proper completion of work.
Dismantling of stone patia lining in 1:4 cement mortar including stacking with 30m as per directed by engineer in charge. Including all cost of labour, material and T&P etc. Complete.
Dismantling 80 mm thick 1:3:6 cement concrete in canal bed. between km 11.183 to km 12.750 of Sone pump canal Including all cost of labour, material and T&P etc. Complete.
E/W in excavation for sleeper in ordinary soil / sandy loam, clay or sand including lift upto 1.50 m and lead upto 30 m and including filling, watering, ramming of excavated earth into the trenches or into the olinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 m from the foundation trenches.
Preparation of subgrade before laying of lining excluding cost of earth work including all cost of labour and T&P etc. Required for proper completion of work.
Centering and shuttering of c.c lining,sleeper and safety ladder etc. including cost of all labour, material , T&P, fixing and removal etc. Required for proper completion of work .
Providing and Laying of cement concrete in (1:1.5:3) sleeper & safety ladder with coarse sand and crushed aggregate size 4.75mm to 20mm grit well graded from dalla quarry including cost of all labour, material and T&P, royalty, taxes etc. required for proper completion of work as per specification.
Providing and Laying of coarse sand in filter including cost of all labour, material and T&P royalty, taxes for proper completion of work .
Supplying and laying of 150 micron LDPE Film including cost of all Labour, material and T&P etc. required for proper completion of work.
Providing and Laying of 100 mm thick C.C. lining in canal. cement concrete in (1:1.5:3) with coarse sand and 4.75mm to 20mm size crushed aggregate of hard stone ballast well graded from dalla quarry by Paver machine. including cost of all labour, material and T&P, royalty, taxes etc. required for proper completion of work as per specification by Paver machine.
Providing and Laying of 100 mm thick C.C. lining in canal. cement concrete in (1:1.5:3) with coarse sand and 4.75mm to 20mm size crushed aggregate of hard stone ballast well graded from dalla quarry by manual. including cost of all labour, material and T&P, royalty, taxes etc. required for proper completion of work as per specification by without Paver machine (Manual in canal bed).
Making contraction groove in lined concrete surface as per drawing including painting with sealing primer on joint and filling groove with sealing compound including cost of all labour ,material and T&P required for proper completion of work.
Patia pitching on dowla in 1:4 cement and coarse sand mortar with lift 3.0 m height & lead upto 60 m including cost of all material, labour ,T&P. Excluding cost of stone boulder . required for proper completion of work.
S.P.R.U INFRATECH PRIVATE LIMITED
Rajiv And Company
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .