| 1 | L1₹46.1 LAccepted-AOC | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹64.8 L+₹18.7 L (40.5%)Rejected-Finance 33 CHANDASI HOUSE LANE NO 11 S K PURAM ARYA SAMAJ MANDIR ROAD RPS MORE BAILEY ROAD DANAPUR PATNA BIHAR 801503 | PATNA | PATNA | BIHAR | 801503 | L2 | Rejected-Finance Not being the lowest bidder | |
| 3 | L3₹65.9 L+₹19.8 L (42.9%)Rejected-Finance | L3 | Rejected-Finance Not being the lowest bidder | |
| 4 | L4₹67.9 L+₹21.8 L (47.3%)Rejected-Finance | L4 | Rejected-Finance Not being the lowest bidder |
| Sl No | Description | Qty | Unit | BRITE INDUSTRIES L3 | M/S Inderjit Sharma and Co. L4 | V.H.Constructions L1 | Roy and Sons Infrastructures L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing and commissioning of 200 KVA (Capacity of Generating set shall be net after all due derating factors as per relevant lSI standard), silent Diesel engine Generating Set, 415volts, 3 phase, 0.8 Power factor, 50Hz, 4 wire system as per IS 10001/10002 comprising of Koel 200 KVA or equivalent, developing suitably derated of Minimum BHP @ 1500RPM, liquid cooled, electric start coupled to alternator as per IS-13364 mounted on a common base frame with standard control panel for manual starting on main control panel having meters, sound proof canopy, integral fuel tank with battery and leads and accessories complete in all respect with emission control device to control the PM within range as prescribed by NGT/ norms of CPCB and CPCB approved acoustic enclosure suitable for ambient condition at Hyderabad /Secunderabad and including necessary PCC foundation as per manufacturers specification and conforming to conditions under IS 10004722/1460 BS 5514/2613/ 5000 ISO 8526/ 3046 along with the following complete all as specified and as directed : - | 2 | EACH JOB | 27,55,243 ₹55,10,486 | 29,50,000 ₹59,00,000 | 20,75,001 ₹41,50,002 Lowest | 28,55,000 ₹57,10,000 |
| 1.01Alternator :- Standard design alternator rated at 200KVA net output at site after considering derating as per site conditions at 0.8 (lag) power factor AC, 3 phase, 4 wire, 415volts 50Hz, 1500RPM, self excited self regulated screen protected drip proof IP 23 enclosure, brushless design with winding in pole faces, insulating class 'H' and voltage regulation of ± 1 % at rated voltage from no load to full load. Alternator shall confirm to BS 2613/5000 and shall be in position to generate supply with frequency regulation with in ± 1% tolerance. Alternator shall be suitable for tropical climate and shall generally confirm to BS - 2613/50001 IS - 4722 with the following provisions:- Make: KIRLOSKAR/JYOTI /STAMFORD/CATERPILLAR (a) Insulation class - 'H' (b) Temperature rise Class - 'H' (c) Excitation: Self Excited (d) Regulation performance: The voltage is kept constant with ± 1 %, manual voltage adjustment within ± 5% (e) Frequency regulation ± 1 % (f) UG cable of suitable size from Alternator to AMP is deemed to be include in quoted rate. (g) Antivibration Pads | |||||||
| 1.02Diesel Engine: - Adequate capacity Diesel engine suitably derated of matching BHP of 200 KVA (as per manufacturer recommended) coupled drive independently above alternator and after considering derating as per site condition's after generating and reducing power consumed by accessories, directly coupled through flexible coupling, multi cylinder multi stroke direct injection, cold starting 1500RPM, as per relevant ISI/BS - 5514 with an overload capacity of 10% for one hour in 12 hours continuous running complete with standard accessories all as specified and required for safe handling and operation, salient features of accessories shall be as under:- Make :- KIRLOSKAR / CUMMINS / CATERPILLAR (GMMCO)/GREAVES COTTON (a) Fly wheel with housing (b) Cooling system :- Mounted radiator with fan & belts. (c) Cooling pump: - Centrifugal type belt driven. (d) Exhaust System:- Exhaust System complete with exhaust piping of suitable dia as per manufacture standard with mild steel pipe light grade upto and away two meters height from top of enclosure including necessary angle iron frame supports from floor to the bottom of exhaust pipe from the enclosure covered with mineral wool of thickness 50mm rapped with chicken wire mesh of size 2.25mm and aluminium sheet of 24SWG to be complete with in the enclosure for safe exhaust without transforming vibration to the wall of the enclosure. Exhaust gas turbo charger type, Exhaust manifold Silencer: Residential type Bellows.B20+B19 | |||||||
| 1.03Fuel System :- Fuel injection system with fuel injectors, fuel injection solenoid switch / nozzles / governor electronic type capable for 1% speed /frequency regulation. (i) Fuel filters. (ii) Fuel hoses (iii) Lub oil System. (iv) Lubricating oil filter (v) Lubricating oil pump (vi) Air Intake System :- a) Air intake Manifold b) Air cleaner dry type | |||||||
| 1.04Governor :- Electronic Governor (a) Starting System :- Electric Self starter with maintenance free batteries including battery charging alternator. (b) Batteries:- Required capacity and size Battery complete with copper conductor multistranded leads of suitable length from self starter to the battery terminals complete with initial charge and initial fill of electrolyte all as specified. Make:- EXIDE / AMRON as approved by original DG set manufacturers (i) Starter gear ring (ii) Start and stop push button (iii) Ignition key / Switch (iv) Handling and operation: Salient features of accessories shall be as under: a) Radiator with blower fan b) Corrosion inhibitor coolant c) Paper element filters for fuel, lubricant oil and by pass. d) Electronic governor controlled direct fuel injection system e) Fly wheel housing and fly wheel. | |||||||
| 1.05Generator Monitoring Panel: AMF (Automatic on Mains Failure) control panel inside the acoustic enclosure including Incoming and outgoing MCCBs, timer, relays, contactor, digital Amp meter, digital Voltmeter, frequency meter, power factor meter comprising of following:- (a) Microprocessor based integrator generator set monitories, metering, protection and control system with built torque matched volts/H3 over load control. (b) Engine protection for low lub oil pressure, high coolant temperature (alarm & shutdown) (c) Alternator protection parameters like under voltage, over current, under frequency, over frequency (alarm & shut down) (d) Relay drivers for remote annunciations (e) Cyclic cranking (f) Auto/manual start stop (g) Alternator trim adjustment from the front key pad (h) Operates within a temperature range 0 to 50°C and upto 95% humidity (j) Remote monitoring capability through separate interface modules (k) Genset metering parameters like lube oil pressure, coolant temperature, engine speed(RPM), run hours, DC voltage, 3 phase volts and 3 phase amperes, frequency, KW, KVA, power factor (l) Safety Controls : - Engine low lube oil pressure, high water temperature and over speeding of engine. (m) Coupling arrangement : - Flexible coupling, fly wheel to suit flexible coupling fly wheel housing. (n) Accessories :-AVM Pads built or separately mounted to manufacturer base frames. (o) Base Frame: - Made out of ISMC 200 of sturdy design made of mild steel channel with necessary reinforcement and predetermined holes. | |||||||
| 1.06Acoustic enclosure: CPCB approved enclosure is free standing floor mounted factory built and modular in construction to facilitate easy assembly at work site and will be drop over housing type. It will consist of acoustically treated panel housed in sheet steel will provide easy access for maintenance, repairs and operation. Enclosure shall be custom built to suit conditions with the following features:- (a) Custom built product for various equipment's to ensure the optimum performance without duration. (b) Rugged in construction maintenance free and modular designs which facilitate easy at site. (c) 16SWG (1.6mm) thick CRCA sheets to be used for enclosure panel to ensure longer life against weathering action. High quality acoustic insulation materials to be used as per IS 8183 for maximum sound absorption. Acoustic layers shall be supported by perforated sheets. (d) Sheet metal components of the enclosure shall undergo various stages of surface treatment prior to painting which leads to be better life of the enclosure against weathering action. (e) Special paint treatment with pure polyester powder/epoxy to be provided for better weather resistance. (f) Well designed ventilation system to be provided to pump up the heat in the chamber efficiently. (g) For effective acoustic / weather sealing a special type weather sealing gaskets, new frame rubber gaskets to be used. (h) Working space is to be provided around the equipment for easy maintenance / repairs. | |||||||
| 1.07(j) Necessary cutout provision for entry and exist of fuel lines cable to be incorporated in the enclosure as per the requirement. (k) A see through transparent window (glass or acrylic) in front of engine panel to be provided for monitoring the operation. (l) Ducting if required, bellows, mechanical hardware like locks, hinges fasteners etc., to be provided. (m) Deliverables 75 dBA @ 1 metre at 75% load under free field conditions. The temperature inside tee enclosure shall be within as per manufacturers recommendations above ambient temperature. (n) The enclosure should be provided with bulk head light fitting for inside illumination (o) The batteries should be placed inside the enclosure beside the DG Set on a suitable insulated platform. (p) The DG Set should be provided with external Emergency stop push button. (q) The acoustic enclosure parts shall be of powder coated after pre treatment process. (r) The powder coating shade should be Genset Green. The base frame should be painted with epoxy based black shade. Make for ACCOUSTIC PANEL: as per DG SET OEM | |||||||
| 1.08Civil Works :- All civil works with PCC platform and related to foundations including of panel and equipment's and making good the existing structure of disturbed during installation and commissioning of Genset. Depth of the foundation shall be minimum 300mm with antivibration pads or as recommended by the manufacturer. The following provisions are deemed to be included in the quoted rate for DG set:- (a) First fill of lubricant oil for final successful acceptance test. (b) DHPP for testing purpose shall be supplied by the contractor without any extra cost to department. (c) Factory Inspection will be carried out before Dispatching the DG Sets by AGE E/M / GE or any representative as detailed by Accepting officer. Necessary arrangement will be done by the contractor for testing. (d) The contractor shall arrange for artificial load for testing for final testing of DG Set at site including fuel and the quoted rate is deemed to be including this provision. (e) Testing of sound level should be carried out at the site in presence of GE (f) The quoted rate shall be deemed to be include the cost of test run at site and including of one hour on 10% overload as directed by engineer-in-charge in presence of representative detailed by Accepting Officer. All arrangements are to be made by the contractor for tests. (g) Making necessary holes to walls and making good the disturbed surfaces to match to original specification and connecting up all as specified and directed. (h) PCC foundation and all connected civil works shall be all as per manufacturer's recommendation (j) After disconnecting the old unserviceable DG Set it should be shifted to AGE E/M Store yard | |||||||
| 2.00 | M&L earthing complete with galvanized steel with plate electrode 600 x 600 x 6.3 mm thick buried directly in ground (earth pit not less than 2.25 m below ground level) with top edge of the plate not less than 1.5 m below normal ground level connected to galvanized iron strip 32 x 6 mm by means of bolts, nuts and washers of galvanized iron or steel all as shown in electrical plate No 3 of SSR Part-I connected to earth test point including necessary earth work and excavation, PCC 1:3:6 type C1 using 20 mm graded stone aggregate for earth chamber with RCC cover 50 mm thick 1:2:4 mix type B1, using 8 mm dia TMT bars reinforcement @ 140 mm c/c both ways, watering funnel with GI pipe 15 mm dia medium grade and protection pipe GI 40 mm dia medium grade complete all as specified and directed. | 20 | EACH JOB | 9,880 ₹1,97,600 | 9,000 ₹1,80,000 | 5,890 ₹1,17,800 Lowest | 8,000 ₹1,60,000 |
Tender Value
₹64.6 L
EMD Value
₹1.2 L
Closing Date
23 Apr 2026, 6:00 pmClosed
CWE NO.2 Secunderabad
CWE NO.2, MUDFORT, SECUNDERABAD- 500003
SPECIAL REPAIRS OF 2 x 200 KVA GENERATOR SET AGAINST BER AT MH GOLCONDA UNDER GE GOLCONDA
2026_MES_757800_1
81335/E8
Open Tender
Civil Works - Others
Item Rate
180 days
GE Golconda
As per tender documents
9 documents required · 9 mandatory
₹1,000
GE Golconda
₹1.2 L
Yes
8 Jun 2026
26 Mar 2026
27 Apr 2026
26 Mar 2026
23 Apr 2026
16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Supply, installation, testing and commissioning of 200 KVA (Capacity of Generating set shall be net after all due derating factors as per relevant lSI standard), silent Diesel engine Generating Set, 415volts, 3 phase, 0.8 Power factor, 50Hz, 4 wire system as per IS 10001/10002 comprising of Koel 200 KVA or equivalent, developing suitably derated of Minimum BHP @ 1500RPM, liquid cooled, electric start coupled to alternator as per IS-13364 mounted on a common base frame with standard control panel for manual starting on main control panel having meters, sound proof canopy, integral fuel tank with battery and leads and accessories complete in all respect with emission control device to control the PM within range as prescribed by NGT/ norms of CPCB and CPCB approved acoustic enclosure suitable for ambient condition at Hyderabad /Secunderabad and including necessary PCC foundation as per manufacturers specification and conforming to conditions under IS 10004722/1460 BS 5514/2613/ 5000 ISO 8526/ 3046 along with the following complete all as specified and as directed : - | - | EACH JOB | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
81335Tender.pdf
Tender Documents • 1.18 MB
BOQ_848832.xls
BOQ • 0.28 MB
corri81335.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .