| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-AOC | ₹4.2 L | 1 | Accepted-AOC Lowest Value Quoted |
| 2 | 2₹4.3 LRejected-Finance | ₹4.3 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | T MURUGAN L1 | R SUDALAIKANNU L2 |
|---|---|---|---|---|---|
| 1.00Construction of Cremation shed at Melakulam Nadar Community in Ariyakulam Panchayat of palayamkottai panchayat union | |||||
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation | 14.92 | cum | 263.7 ₹3,934.4 Lowest | 274.2 ₹4,091.06 |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 8.3 | cum | 5,281.1 ₹43,833.13 Lowest | 5,492.3 ₹45,586.09 |
| 4.00 | Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete. | 10.42 | cum | 6,048.25 ₹63,022.77 Lowest | 6,290.2 ₹65,543.88 |
| 5.00 | Filling with Excavated Earth including watering & Ramming etc., complete. | 5.97 | cum | 45.8 ₹273.43 Lowest | 47.6 ₹284.17 |
| 6.00 | Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete. | 63.25 | sqm | 547.45 ₹34,626.21 Lowest | 569.4 ₹36,014.55 |
| 7.00 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 660 | Kg | 91.85 ₹60,621 Lowest | 95.6 ₹63,096 |
| 8.00 | RCC 1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 5.99 | cum | 8,891.9 ₹53,262.48 Lowest | 9,247.6 ₹55,393.12 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 42.16 | sqm | 320.05 ₹13,493.31 Lowest | 332.9 ₹14,035.06 |
| 10.00 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 20.76 | sqm | 281.65 ₹5,847.05 Lowest | 293 ₹6,082.68 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
5 Feb 2026, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Construction of Cremation Shed at Melakulam Nadar Community in Ariyakulam Panchayat GF 2025-26
2026_RDTN_649840_3
A2/3395/2025
Open Tender
Construction Works
Fixed Rate Contract
150 days
Commissioner, Panchayat Union, Palayamkottai.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,000
10 Jun 2026
1 Feb 2026
5 Feb 2026
1 Feb 2026
5 Feb 2026
1 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Cremation shed at Melakulam Nadar Community in Ariyakulam Panchayat of palayamkottai panchayat union | - | - | - | - |
| 2 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation | 14.92 | cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 8.3 | cum | - | - |
| 4 | Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete. | 10.42 | cum | - | - |
| 5 | Filling with Excavated Earth including watering & Ramming etc., complete. | 5.97 | cum | - | - |
| 6 | Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete. | 63.25 | sqm | - | - |
| 7 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 660 | Kg | - | - |
| 8 | RCC 1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 5.99 | cum | - | - |
| 9 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete. | 42.16 | sqm | - | - |
| 10 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 20.76 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_779117.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].