Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.7 LAdmitted-Finance | -0.05% | ₹14.7 L | L1 | Admitted-Finance |
| 2 | L2₹14.7 L+₹737.45 (0.05%)Admitted-Finance | +0.00% | ₹14.7 L+₹737.45 (0.05%) | L2 | Admitted-Finance |
| 3 | L3₹15.0 L+₹22,860.93 (1.55%)Admitted-Finance | +1.50% | ₹15.0 L+₹22,860.93 (1.55%) | L3 | Admitted-Finance |
| 4 | L4₹15.1 L+₹37,609.92 (2.55%)Admitted-Finance | +2.50% | ₹15.1 L+₹37,609.92 (2.55%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹14.7 L
Closing Date
8 Jul 2026, 6:45 pmClosed
add ceo zp solapur
ee 2 zp
as above
2026_SOLAP_1313540_1
Improvement to 65 Acre To Visava Rasta (V.R No 298) Ch.No 0/300 -to 2/00) ,Tal - Pandharpur, Dist
Open Tender
Civil Works
Percentage
90 days
solapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Exempted
14 Jul 2026
1 Jul 2026
9 Jul 2026
1 Jul 2026
8 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Labour charges for removing grass, thorney shrubs, Jungli shrub, Kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. | 1,107.9 | SqM | 7 | ₹7,755.3 |
| 2 | Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. | 768 | SqM | 49.35 | ₹37,900.8 |
| 2.99 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means -Grading I (Using Screening Type B (11.2 mm) Aggregate) | 398.25 | CuM | 2,680.7 | ₹10,67,588.78 |
| 3.98 | Supplying hard murum/ kankar at the road site, including conveying and stacking complete. | 115.2 | CuM | 655 | ₹75,456 |
| 4.97 | Spreading hard murum/ soft murrum/ gravel or kankar for side width complete | 115.2 | CuM | 79 | ₹9,100.8 |
| 5.96 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete. | 768 | SqM | 21 | ₹16,128 |
| 6.95 | P & F Information Board | 1 | No | 7,814 | ₹7,814 |
| 7.94 | Sieve Analysis H.M.WBM | 2 | No | 725 | ₹1,450 |
| 8.93 | Add Royalti Charges | 147.06 | CuM | 216.18 | ₹31,791.43 |
| 9.92 | Add 18% GST | 1 | Each | 2,19,913.86 | ₹2,19,913.86 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_2252566.xls
BOQ • 0.24 MB
SBD8.pdf
Tender Documents • 2.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .