| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.1 L+₹1.6 L (23.8%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹12.4 L+₹5.9 L (90.2%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected | |
| 5 | Rejected-Technical HEAD OFFICE PLOT NO A 9 IDCO INDUSTRIAL ESTATE NEAR SAI INTERNATIONAL SCHOOL PATIA BHUBANESWAR 751024 ODISHA PATIA | KHORDHA | ODISHA | 751024 | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹17,600
Closing Date
24 Jul 2021, 6:00 pmClosed
GE North Bangalore
GARRISON ENGINEER NORTH BANGALORE T 64 MEANEE LINES MEG AND CENTRE BANGALORE 560042
SOIL INVESTIGATION FOR PROVN OF STP AT VARIOUS LOCATIONS UNDER GE NORTH GE SOUTH AND GE CENTRAL AT BANGALORE
2021_MES_457288_1
8240
Open Tender
Civil Works
Item Rate
30 days
GE North Bangalore
Class E Category a(i)
6 documents required · 6 mandatory
₹500
Yes
GARRISON ENGINEER NORTH BANGALORE
₹17,600
Yes
28 Aug 2021
5 Jul 2021
26 Jul 2021
5 Jul 2021
24 Jul 2021
12 Jul 2021
5 Jul 2021 - 10 Jul 2021
Amount
Carrying out geological investigation and sub soil extraction by drilling of 150 mm dia holes at required locations upto 10.00 m from existing GL to determine SBC of soil / soft rock, profile of strata, water table, sub water pressure etc complete all as per IS as specified and as directed on site. NOTE:- SBC shall be determined at every 1.0 m interval upto the depth of bore hole, Quoted rate shall deemed to be included for drilling bore holes and determining SBC complete with field and lab investigation according to relevant specification of IS-2131, IS-6403, IS-1498 & IS-2720 as mentioned below:- (a) Conduction of 150mm bore diameter bores upto 10m depth according to IS 1892-1988 and 1892-1979. (b) Conducting standard penetration tests (SPT) as per 2131-1988 .The testing shall be made at every change in strata or at the interval of not more than 1.5 mtr which ever is less. The test may be made at least intervals if specified or considered necessary as per 3.31 of IS 2131-1988. Contd.. 1.002
1.001 contd.. (c) Collection of disturbed and undistrubed soil samples at interval of 1.00 mtr or at change of strata or as per relevant IS code. (d) Conduction of laboratory tests on disturbed/undisturbed (soil/soft rock samples). As considered necessary according to the relevant of IS specification of 2720 as given below:- (i) Sieve Analysis (ii) Atterberg limits (iii) Natural moisture content (iv) Particle size analysis test (v) Bulk Density (vi) Specific Gravity (vii) Free swell index and swelling properties of soil (viii) Organic mater in soil if any (ix) Consolidation test (Compressed index value) (x) Triaxial compression test and determination of shear parameter (C & φ Test) as per relevant IS (xi) Harmful salt (complete investigation as already ref) (e) Ground Water Table :- (i) Maximum and minimum levels of ground water in the area with source of information (ii) Ground water table during the investigation
Carrying out geological investigation and sub soil extraction by drilling of 100 mm dia holes at required locations upto 5.00 m from existing GL to determine profile of strata, water table, sub water pressure etc complete all as per IS as specified and as directed on site. NOTE:- Quoted rate shall deemed to be included for drilling bore holes and determining field and lab tests according to relevant specification of IS-2131, IS-6403, IS-1498 & IS-2720 as mentioned below- (a) Collection of disturbed and undistrubed soil samples at interval of 1.00 mtr or at change of strata or as per relevant IS code. (b) Conduction of laboratory tests on disturbed/undisturbed (soil/soft rock samples). As considered necessary according to the relevant of IS specification of 2720 as given below:- (i) Sieve Analysis (ii) Atterberg limits (iii) Natural moisture content (iv) Particle size analysis test (v) Bulk Density (vi) Specific Gravity (vii) Free swell index and swelling properties of soil (viii) Organix mater in soil if any. (ix) Consolidation Test (Compressed index value) (x) Triaxial compression test and determination of shear parameter (C&O Test) as per relevant IS (xi) Harmful salt (complete investigation as already ref) (e) Ground water table :- (i) Maximum and minimum levels of ground water in the area with source of infromation. (ii) Ground water table during the investigation NOTE FOR Sl ITEM NO. 1 AND 2 :- (a) Preparation and submission of soil report duly incorporating all above factors and should clearly bring out recommendation for foundation based on total size/ loading of structure and 1.004 contd..
1.003 contd.. soil profile .Report should also include the recommendations for filiing of soil with type and replacement of soil in case if it is required .Recommendations for floor design to be given in case of black cotton soil. in 6 hard copies and one soft copy. (b) The SBC of the soil is required to be given at every 1 m interval upto the depth of bore hole . Calculation of bearing capacity will be governed generally as per IS-8009 (Pt-I)-1976, IS 2720 (Pt-II)-1980, IS 6403-1981, IS-1904-1986 & IS-1080-1985 and other relevant IS codes. (c) With every site's soil Investigation Report, a details site plan showing the aprox location of each bore duly numbered as per log of bore hole should be enclosed. (d) Every Page of the soil Investigation Report should have the Name of the Job for which soil Investigation is being carried out. In case of multiple sites of a single Job area being investigated name of each site shall be put on each page of report pertaining to the sites. (e) All pages of the Soil Investigation Report shall be serially numbered, stamped and signed by the agency carrying out the soil Investigation. (f) As the locations of each bore hole is spread in 10 km diameter as shown in site plan attached, Transportation charges including loading and unloading of heavy girders, T&P, technician etc complete from laboratory to work site and back shall be deemed to be included in rates quoted by the tenderer.
AN-ICON Engineering Technologies And Infrastructure Developments Pvt. Ltd
J PUSHPALATHA ENGINEER AND CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .