Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.1 LAccepted-AOC | ₹29.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.1 L+₹1.1 L (3.66%)Rejected-AOC | ₹30.1 L+₹1.1 L (3.66%) | L2 | Rejected-AOC L2 |
| 3 | L3₹34.8 L+₹5.8 L (19.9%)Rejected-AOC | ₹34.8 L+₹5.8 L (19.9%) | L3 | Rejected-AOC L3 |
| 4 | L4₹35.4 L+₹6.4 L (21.9%)Rejected-AOC | ₹35.4 L+₹6.4 L (21.9%) | L4 | Rejected-AOC L4 |
| 5 | L5₹38.0 L+₹9.0 L (30.9%)Rejected-AOC NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | ₹38.0 L+₹9.0 L (30.9%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Prabhavathi L4 | K.Sakthivel L2 | CHINNAMUTHU CONTRACTORS L5 | SIVA KUMAR L1 | Jayakumar L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Renewal of Road form Annanagar road to Goodalur X Road @ Veerappanaickanpatti pt., (km 0/0-1/700(R-186)) | ||||||||
| 2.00 | Clearing and grabbing road land including uprooting wild vagetation, grass, bushes, scrubs, saplings and trees of girths upto 300mm. Removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctional utpo a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clauses 201 in all etc., complete] | 765 | sqm | 6 ₹4,590 | 5.41 ₹4,138.65 | 7 ₹5,355 | 5.22 ₹3,993.3 | 5 ₹3,825 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M lift of 2M including all labour charges and incidental charges, such as shorting strutting, providing coffer dams, bailing out of water as per 20A | 99 | Cum | 140 ₹13,860 | 119.38 ₹11,818.62 | 155 ₹15,345 | 115.17 ₹11,401.83 Lowest | 125 ₹12,375 |
| 4.00 | Picking up existing BT surface upto 5 to 10 cm if old metalled surface, cambering, sectioning of carriage wat etc., complete | 125 | sqm | 23 ₹2,875 | 19.86 ₹2,482.5 | 35 ₹4,375 | 19.16 ₹2,395 Lowest | 20 ₹2,500 |
| 5.00 | Providing and laying including cost and conveyance of gravel from approvaed sources to waork site including labour for spredding, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing dangerlightes etc., comp for side berms - KM 0/0-1/0 | 75 | Cum | 409 ₹30,675 | 348.02 ₹26,101.5 | 500 ₹37,500 | 335.73 ₹25,179.75 Lowest | 395 ₹29,625 |
| 6.00 | Providing and laying including cost and conveyance of gravel from approvaed sources to waork site including labour for spredding, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing dangerlightes etc., comp for side berms - KM 1/0-1/700 | 52.5 | Cum | 423.11 ₹22,213.28 | 359.64 ₹18,881.1 | 500 ₹26,250 | 346.95 ₹18,214.88 Lowest | 395 ₹20,737.5 |
| 7.00 | Providing and laying speading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with persons in Subbase/Base Course on well prepared surface and compacting with vibratory roller to achieve the desired including cost of material balour chrges rental for machienry, fuel and all other incidental charges etc., complete | 37.5 | Cum | 2,603.78 ₹97,641.75 | 2,213.21 ₹82,995.38 | 2,780 ₹1,04,250 | 2,135.1 ₹80,066.25 Lowest | 2,400 ₹90,000 |
| 8.00 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS 1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended inclduing labour charges for preparing the surface for laying prime coatand for applying required quantity for bituminous emulison by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per chase 503 of MOST specification | 375 | Sqm | 108.32 ₹40,620 | 92.07 ₹34,526.25 | 150 ₹56,250 | 88.82 ₹33,307.5 Lowest | 100 ₹37,500 |
| 9.00 | Providing and laying TACK COAT over the WMM surface (treated with Primer) using 2.50Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bitumious emulsion which will be supplied by the department at section stores and its coast will be recovered as per special condition appended including labour charges for preparing the surface for laying tacj coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST speficiation | 375 | sqm | 20.31 ₹7,616.25 | 17.26 ₹6,472.5 | 20.31 ₹7,616.25 | 16.65 ₹6,243.75 Lowest | 20 ₹7,500 |
| 10.00 | Advance patch work for making up the undulation in the exisiting BT surface to an average thickness of 25mm suing 13.20mm IRC size HBG metal - KM 0/0-1/0 | 3.7 | Cum | 4,536.61 ₹16,785.46 | 3,856.12 ₹14,267.64 | 4,536.61 ₹16,785.46 | 3,720.02 ₹13,764.07 Lowest | 4,200 ₹15,540 |
Tender Value
₹35.8 L
EMD Value
₹36,000
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer (BP) Harur
Panchayat Union Harur
Renewal of Road From Annanagar road to Goodalur X Road in Veerappanaickenpatti
2026_RDTN_651550_1
Harur Block/SFC-Road Maintenance 25-26/P01/Renewal of Road From Annanagar road to Goodalur X Road
Open Tender
Civil Works
Item Rate
Goodalur
Can be seen in the Tender Documents
3 documents required · 3 mandatory
₹0
₹36,000
Yes
6 Jul 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Renewal of Road form Annanagar road to Goodalur X Road @ Veerappanaickanpatti pt., (km 0/0-1/700(R-186)) | - | - | - | - |
| 2 | Clearing and grabbing road land including uprooting wild vagetation, grass, bushes, scrubs, saplings and trees of girths upto 300mm. Removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctional utpo a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clauses 201 in all etc., complete] | - | sqm | - | - |
| 3 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M lift of 2M including all labour charges and incidental charges, such as shorting strutting, providing coffer dams, bailing out of water as per 20A | - | Cum | - | - |
| 4 | Picking up existing BT surface upto 5 to 10 cm if old metalled surface, cambering, sectioning of carriage wat etc., complete | - | sqm | - | - |
| 5 | Providing and laying including cost and conveyance of gravel from approvaed sources to waork site including labour for spredding, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing dangerlightes etc., comp for side berms - KM 0/0-1/0 | - | Cum | - | - |
| 6 | Providing and laying including cost and conveyance of gravel from approvaed sources to waork site including labour for spredding, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing dangerlightes etc., comp for side berms - KM 1/0-1/700 | - | Cum | - | - |
| 7 | Providing and laying speading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with persons in Subbase/Base Course on well prepared surface and compacting with vibratory roller to achieve the desired including cost of material balour chrges rental for machienry, fuel and all other incidental charges etc., complete | - | Cum | - | - |
| 8 | Providing and laying PRIME COAT over the WMM surface using 7.00 Kg of Bituminous Emulsion SS 1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended inclduing labour charges for preparing the surface for laying prime coatand for applying required quantity for bituminous emulison by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per chase 503 of MOST specification | - | Sqm | - | - |
| 9 | Providing and laying TACK COAT over the WMM surface (treated with Primer) using 2.50Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bitumious emulsion which will be supplied by the department at section stores and its coast will be recovered as per special condition appended including labour charges for preparing the surface for laying tacj coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST speficiation | - | sqm | - | - |
| 10 | Advance patch work for making up the undulation in the exisiting BT surface to an average thickness of 25mm suing 13.20mm IRC size HBG metal - KM 0/0-1/0 | - | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.97 MB
BOQ_781308.xls
BOQ • 0.31 MB
Tenderdoc1.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .