Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC WZ 109 PLOT NO 327 CHAND NAGAR NEW DELHI | L1 | Accepted-AOC Lowest tender | |
| 2 | L2₹2.8 L+₹750 (0.27%)Rejected-Finance H 13 GEETANJALI PARK WEST SAGARPUR NEW DELHI 110046 | NEW DELHI | DELHI | 110046 | L2 | Rejected-Finance Other than lowest tender | |
| 3 | L3₹2.8 L+₹1,050 (0.38%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 IP EXTN PARPARGANJ DELHI 110092 | EAST | DELHI | 110092 | L3 | Rejected-Finance Other than lowest tender | |
| 4 | L4₹2.8 L+₹1,750 (0.63%)Rejected-Finance 1001 63 SHALIMAR GARDEN ISMAILGANJ NEAR INDIRA NAGAR SECTOR 08 CROSSING LUCKNOW 226016 | LUCKNOW | UTTAR PRADESH | 226016 | L4 | Rejected-Finance Other than lowest tender | |
| 5 | L5₹2.8 L+₹2,450 (0.88%)Rejected-Finance | L5 | Rejected-Finance Other than lowest tender |
Tender Value
Refer Docs
Closing Date
11 Nov 2021, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
MAINTENANCE AND REPAIR OF EOT CRANES AND HOIST INSTALLED AT 505 ABW UNDER GE (U) P AND M DELHI CANTT - 10
2021_MES_485780_1
GE(U)/PM/3011/B/JO/R-123/E3
Limited
Miscellaneous Works
Piece-work
60 days
Delhi Cantt
PLEASE REFER NOTICE INVITING QUOTATION
1 document required · 1 mandatory
₹0
Exempted
13 Dec 2021
2 Nov 2021
13 Nov 2021
5 Nov 2021
11 Nov 2021
5 Nov 2021
Amount
1.Preventive maintenance and repair by technically qualified technician and rendering operationally of EOT crane/Hoist complete including checking / tightening of all nut , bolt & breaks any type any size complete system, adjusting etc of all breaks motions and VFD /VVVF drive adjustment setting of EOT / HOT cranes with having single or double girder type and providing greasing & oiling of traveling / moving parts of crane with connecting motor girder parts for movement of crane hoist / long / cross traveling and including maintaining the controlling of speed / creeping micro speed of motors with minor maint / repair electrically operated main control panel wire with connecting control wiring system consisting of main switch, step down transformer, contactor, HRC fuse, VFD, PLR, control pendent ,wire rope with break drum unit, gear box unit , oil levels, motor bed / foot ,electrical control cable, motor terminal, end cable carriage trolly , motor shaft, bush flange bearing with lathe work ,chain pulley block, ratchet clutch, gear block, chain wheel, chain etc and including locating the defect or fault and rectification of the fault and rectification of oil leakage etc any type any size and replacement of defected nut, bolt & washer and making it soundless/sound proof and after trails testing run of crane for smooth functioning / operation satisfactorily for the following mentioned capacity cranes/Hoist complete all as specified and directed by Engineer-in-Charge. Details of Cranes are under mentioned located at 505ABW (a) EOT crane of 50 Ton (Make of Cranex Ltd.) - 01 No (b) EOT crane of 45 Ton (Make of Rockwell Hoist) - 01 No (c) EOT crane of 20 Ton (Make of Cranex Ltd.) - 01 No (d) EOT crane of 20/05 (Make of Cranex Ltd.) - 01 No (e) EOT crane of 10 Ton (Make of Cranex Ltd.) - 01 N0 (f) EOT crane of 05 Ton (Make of Cranex Ltd.-07, Tojyam Steel-02 Nos, Grip Engineers) 10 Nos. (g) EOT crane of 03 Ton (Make of Dinesh Enterprises - 02 Nos, USGC-01No)-03 Nos (h) EOT crane of 02 Ton (Make of Cranex Ltd.-12 Nos, Grip Enterprises-01 No) - 13 Nos. Total =31Nos of Cranes for 02 Month
1. Notes for item No 01 :-The including the properly checks as mentioned as following:- (i) LT AND CT MOTION :- (a) Checking Gear box oil level and filling with required oil and rectification of leakages if any.(Note: Note: Brake Oil shall be included in quoted rate by the contractor) (b) Brake adjustment (c) Checking of long travel & cross travel wheel for any noise/malfunctioning. (d) Checking grease of geared couplings, complete nut, bolt work for tightening and replacement of grease nipple. (e) Checking of oil in Hydraulic thruster brake, rectification of leakages if any and filling with required quantity of oil.(Note: Brake Oil shall be included in quoted rate by the contractor) (f) Checking of electric motor connections, insulation resistance value etc (g) Checking the cut-off at extreme ends with the limit switch. (j) Checking and greasing of shaft pedestal. (ii) HOIST MOTION:- (a) Checking gear box oil level and filling with required oil and rectification of leakages if any.(Note: Gear Oil shall be included in quoted rate by the contractor) (b) Brake adjustment (c) Checking of main bearings of the rope drum including greasing the same (d) Checking grease of geared couplings and nut tightening.
(e) Checking of oil in hydraulic thruster brake, rectification of leakages if any and filling with required quantity of oil.( (Note: Brake Oil shall be included in quoted rate by the contractor) (f) Checking of electric motor connections, insulation resistance value. (g) Checking wire rope for any damage & greasing the rope. (h) Adjustment of the rotary limit switch. (j) Checking of bearing of the hook and greasing the same. (iii) ELECTRICAL PANEL (a) Checking the contactors for overheating or flashing. (b) General checking of contacts and connections. (c) Cleaning of control panels and checking of connections. (d) Checking of connections of VVVF drives/other drive, calibrating VVVF drive and PLC to get smooth movement & maximum efficiency / other drives for smooth functioning of the same. (e) checking the serviceability of bus bar of travelling cranes ,cable including power/control cable, (f) Cleaning of the moving/sliding objects. (g) Checking function ability of motion push buttons, function lock key operated switch, "ON &OFF" , lamps. (iv) Maintenance and Servicing of Cranes/Hoist complete adjusting and testing run work will be carried out by well qualified technician having good experience in the repairing field of EOT / HOT cranes or as approved by GE or Engineer-in-Charge (v)It is responsibilityof contractor for maintenance and repair of cranefor 02 month after the handing / taking over the site without any extra cost to department. And also included the consumable items i.e Push button for pendent, nuts& bolts, wiring, lubrication oils for gearbox (LT/CT/Hoist) & thruster brake oil of Cranes. (vi) Contractor shall immediately depute suitable Nos of technician/trade men which is experience of Crane operations and to attend the complaints on required basis forcranes /hoist found unserviceable within the effected time after complaint by Engineer-in-charge and rectify the same all as specified and directed by Engineer-in-Charge. (vii) Repair/Replacement MajorParts of Cranes/ Hoist shall be measured and paid separately.
J.P. Enterprises
Saini Enterprises
RK Enterprises
Ahuja international
R.P. Enterprises
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_542158.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .