Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC | ₹1.8 L | L1 | Accepted-AOC A |
| 2 | L2₹2.4 L+₹56,230.60 (31.0%)Rejected-AOC | ₹2.4 L+₹56,230.60 (31.0%) | L2 | Rejected-AOC A |
| 3 | L3₹2.6 L+₹83,072.81 (45.8%)Rejected-AOC | ₹2.6 L+₹83,072.81 (45.8%) | L3 | Rejected-AOC A |
| 4 | L4₹2.7 L+₹87,921.81 (48.4%)Rejected-AOC VILLAGE DHABKI GUJJAR DISTT SAHARANPUR UTTAR PRADESH | SAHARANPUR | UTTAR PRADESH | 247001 | ₹2.7 L+₹87,921.81 (48.4%) | L4 | Rejected-AOC A |
| 5 | Rejected-Technical | - | - | Rejected-Technical F |
| Sl No | Description | Qty | Unit | RAJ KUMAR L2 | M/S SHIV GORAKH CONSTRUCTION L4 | Poonam L1 | PREM DEVCHAUDHARY ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance/trench digging including lift upto 1.5m and lead upto 6 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,629.1 | CUM | 50 ₹81,455 | 41.5 ₹67,607.65 | 28 ₹45,614.8 Lowest | 40.94 ₹66,695.35 |
| 2.00 | Earth work in silt clearance with Slush & lahel including lift upto 1.50 M and lead upto 2.000 km including proper ramming and dressing the surface to the required level and slopes by manual labour or machines as direted by Engineer-in-charge. | 1,359.36 | CUM | 115 ₹1,56,326.4 | 148.5 ₹2,01,864.96 | 100 ₹1,35,936 Lowest | 145.6 ₹1,97,928.25 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
4 Jun 2026, 2:00 pmClosed
EE LOWER DIVISION YAMUNA CANAL SHAMLI
EE LOWER DIVISION YAMUNA CANAL OFFICE SHAMLI.
01- FUGANA NALE KE KM 0.000 SE KM 3.419 TAK AANTRIK SAFAI KA KARYA
2026_UPIDC_1154822_1
C-35/03/EE/2026-27 DT 27.05.2026
Open Tender
Civil Works - Canal
Item Rate
15 days
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹30,000
2 Jul 2026
29 May 2026
4 Jun 2026
29 May 2026
4 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance/trench digging including lift upto 1.5m and lead upto 6 m, including cost of driver/assistant driver, POL, maintenance of machine, contractor profit, taxes etc but excluding leveling, dressing & compaction. | 1,629.1 | CUM | - | - |
| 2 | Earth work in silt clearance with Slush & lahel including lift upto 1.50 M and lead upto 2.000 km including proper ramming and dressing the surface to the required level and slopes by manual labour or machines as direted by Engineer-in-charge. | 1,359.36 | CUM | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_2163146.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .