Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.5 L
Closing Date
22 Mar 2022, 4:00 pmClosed
Executive Engineer, ED-3rd srinagar
Office of Executive Engineer, ED-3rd srinagar
HT-LT Works of 200 KVA Substation at Usman Abad Lane 3 Maloora falling under jurisdiction of Electric Division 3rd (Turnkey Basis)-under Capex Budget 2021-22 PDDSS2021100647
2022_PDD_164398_1
ED-III/91 of 2022, Dated- 14/03/2022
Open Tender
Electrical Works
Turn-key
10 days
Office of Executive Engineer, ED-3rd srinagar
Refer SBD, Technical Specification
6 documents required · 6 mandatory
₹500
Executive Engineer, ED-3rd srinagar
Exempted
23 Mar 2022
14 Mar 2022
23 Mar 2022
14 Mar 2022
22 Mar 2022
15 Mar 2022
15 Mar 2022 - 22 Mar 2022
Amount
HT-LT Works of 200 KVA Substation at Usman Abad Lane 3 Maloora falling under jurisdiction of Electric Division 3rd (Turnkey Basis)-under Capex Budget 2021-22 PDDSS2021100647
Supply, installation, testing and commissioning of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15 , IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15).Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, installation, testing and commissioning of 300 mm² Single Core Cable, 1.1kV Grade, Armoured, XLPE Insulated Stranded Conductor FRLS type including lugs/clamps
Supply, installation, testing and commissioning of ACSR 50mmSq conforming with the Indian Standard specification IS: 398 (PLI)-1976 and IS : 398 (PL II)- 1976 or the latest version thereof.
Supply, installation, testing and commissioning of Heat Shrinkable Outdoor Cable Termination Kit
Supply, installation, testing and commissioning of Suspension/Tension Clamp with eye hook
Supply, installation, testing and commissioning of 16KN Polymer Shackle Insulator
Supply, installation, testing and commissioning of GI U- Clamps for Shackle Insulator
Supply, installation, testing and commissioning of Galvanized (as per IS ) Nuts & Bolts full thread of sizes.
Supply, installation, testing and commissioning of Pole Earthing complete by G.I Pipe 40 mm or GI rod 20 mm, 2.5 mtr long through G.I Strip of standard size
Supply and fixing of Wedge Connectors / PG Clamps
Supply and Painting of poles with single coat of Red oxide and two coats of Aluminum paint
Supply of material and Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.45M3 per Pole).
Supply and fixing of LT Distribution Fuse Set
M/S ROYAL ELECTRICAL MECHANICAL and SUPPLIERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .