Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-Finance 2 373 6 GANDHI NAGAR VADAPUDUR KINATHUKADAVU COIMBATORE | COIMBATORE | 1 | Accepted-Finance Accepted |
Tender Value
₹4.2 L
EMD Value
₹4,170
Closing Date
12 May 2025, 2:00 pmClosed
Executive Engineer(I/C)/Operation/230 KV SS/Myvadi
Executive Engineer(I/C)/Operation/230 KV SS /Myvadi
Supply ,Fabrication and erection of new steel structure and Dismantling ,Erection defective 230KV AB Switch (WOE)by new Switch in 230 KV Myvadi-Kadamparai-I feeder Bus-II at 230 KV Switching Station Myvadi
2025_EB_552188_1
EE/O/MYI/LT04/25-26dt.28.04.25
Limited
Electrical Works
Works
230 KV SS Myvadi
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,170
Yes
14 May 2025
28 Apr 2025
13 May 2025
28 Apr 2025
12 May 2025
28 Apr 2025
Amount
Supply of Iron and Steel as per ISI - RSJ 200X100 mm
Supply of Iron and Steel as per ISI - MS Channel 125X65 mm
Supply of Iron and Steel as per ISI - MS Angle 65X65X6 mm
Supply of Iron and Steel as per ISI - MS Angle 100X100X8 mm
Supply of Iron and Steel as per ISI - MS Flat 75X12 mm
Supply of T clamp for Moose to Moose
Supply of T clamp for Double Moose to Double Moose
Supply of T clamp for Double Moose to 3 " Bus bar
Switch end clamp for Moose
Switch end clamp for 3 " Bus bar
Expansion of Clamp 3 "
Free end clamp 3 "
Corona bell 75 mm
Fabrication of Heavy Section (Sectional weight 14 Kg/m and above
Fabrication of Light Section ( Sectional weight below 14 Kg/m
Labour charges for erection of Heavy section (Sectional weight 14 Kg/m and above ) under LC condition
Labour charges for erection of Heavy section (Sectional weight below 14 Kg/m ) under LC condition
Labour Machinaries,Consumables for erection of earth raisers under LC condition
Dismantling of 230 KV Isolator with out earth under LC condition
Erection of 230 KV Isolator with out earth including Insulator setting,Alignment, and MOM arrangements under LC condition
Dismantling of Droppers and Jumpers above 6 to 10 M
Labour charges for erection of Droppers and Jumpers above 6 to 10 M
Labour charges for Dismantling of 75 mm Aluminium bar
Labour charges for erection of 75 mm Aluminium bar
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only for Tamil Nadu Contractor. If the contractor is outside Tamil Nadu may be quoted as "0" only
Inter-state GST to be quoted in percentage (value alone) Ex. 18%, it should be entered as 18 only for other than Tamil Nadu contractor. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .