| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.5 LAccepted-AOC | ₹83.5 L | L1 | Accepted-AOC As per decision of Tender Committee |
| 2 | L2₹99.3 LRejected-Finance | ₹99.3 L | L2 | Rejected-Finance As per decision of tender Committee |
| 3 | L2₹99.3 LRejected-Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | ₹99.3 L | L2 | Rejected-Finance As per decision of tender Committee |
| 4 | L2₹99.3 LRejected-Finance AT JAYAPATNA PO JAIPATNA PS JAIPATNA KALAHANDI ODISHA | JAIPATNA | KALAHANDI | ODISHA | ₹99.3 L | L2 | Rejected-Finance As per decision of tender Committee |
| 5 | L2₹99.3 LRejected-Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | ₹99.3 L | L2 | Rejected-Finance As per decision of tender Committee |
Tender Value
₹99.4 L
EMD Value
₹1 L
Closing Date
24 Mar 2026, 5:00 pmClosed
Block Development officer, Th.Rampur
O/o Panchayat Samiti, Th.Rampur
Road work
2026_PRTRB_127051_10
PS-THRMPR-T-3/2025-26
Open Tender
Civil Works - Roads
Percentage
270 days
Th.Rampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1 L
Yes
14 Jul 2026
10 Mar 2026
25 Mar 2026
10 Mar 2026
24 Mar 2026
10 Mar 2026
10 Mar 2026 - 17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Paver Block Road with RCC drain | |||||
| 2 | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the bed and depositing the excavated earth at places away from site with all leads and lifts including royalties, cost of all labour, T&P required for the work as direction of the Engineer-in-Charge. | 626.69 | cum | 276.89 | ₹1,73,524.19 |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts & delifts including trimming of slopes and bed to design section 7 depositing the excavated materials away from work site as per the specification and as directed by the Engineer-In-Charge within the initial lead of 1 Km from the place of excavation complete. | 536.85 | cum | 81.96 | ₹44,000.23 |
| 4 | Cement concrete of proportion (1:3:6) in foundation and floor using 40mm size hard black hand broken granite metal of approved quality and from approved quarry including hosting, lowering and laying in layers not exceeding 15cm (6") thick to the required level, ramming, watering and curing etc. complete including cost, conveyence, royalties and taxes of all materials and all labour with T&P required for the work etc complete. | 59.65 | cum | 7,886.37 | ₹4,70,421.97 |
| 5 | Providing, laying, spreading and compacting graded stone aggregates to WMM specification as per Clause 406 of MoSRT&H Specification for Road & Bridge works. | 429.48 | cum | 4,251.55 | ₹18,25,955.69 |
| 6 | Providing and Filling in foundation plinth with sand in layer not exceeding 23.5cm (9") thick including watering and ramming with cost, conveyence, royalties and taxes of sand and all labour with T&P required for the work etc complete. | 107.37 | cum | 2,086.22 | ₹2,23,997.44 |
| 7 | Cement Concrete (1:2:4) using 12mm size cbg chips including all cost, conveyance & royalty etc. complete. | 139.23 | cum | 9,420.58 | ₹13,11,627.35 |
| 8 | RCC M20 grade (1:½:3) using 20 mm and down graded black hbg chips including all cost, conveyance & royalty etc.complete. | 238.6 | cum | 7,916.31 | ₹18,88,831.57 |
| 9 | Supplying and straightening bent up or coiled "Tor Rods" cutting, bending, crakning, hooking, welding or jointing (if required) the tor steel Rods and binding, tying the grills, hosting and placing in position as required for the RCC works including cost, conveyance and taxes of tor steel rods and binding wire of 18 to 20 gauge and labour with T&P required for the works etc complete in all respect ( weight of binding wires will not be considered and measurement of tor steel rod will only be considered for payment) | 35.34 | Qtl. | 8,556.27 | ₹3,02,378.58 |
| 10Rigid and smooth centering & shuttering for RCC works and dismetaling them after casting including all cost, conveyance, royalty etc. complete. | |||||
stage.html
html • 0.21 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.37 MB
BOQ_584463.xls
BOQ • 0.35 MB
DTCNTTHRMPRROAD.pdf
Tender Documents • 1.14 MB
Corrigendum.pdf
PDF • 1.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].