Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical GRAM SONPURA PADMA HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical HAZARIBAGH | JHARKHAND | 825301 | Accepted-Technical Responsive |
| 4 | Accepted-Technical DMFT MADHARGAT TATICHHARIYA PRAHAND ANTARGAT KASTURBA GANDHI BALIKA AWASIYA VIDYALAYA TATICHHARIYA | GODDA | JHARKHAND | 813208 | Accepted-Technical Responsive |
| 5 | Accepted-Technical HAZARIBAGH | HAZARIBAGH | JHARKHAND | 825301 | Accepted-Technical Responsive |
Tender Value
₹79.6 L
EMD Value
₹1.6 L
Closing Date
16 Feb 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE RDSD HZB
EE RDSD HZB
Construction of RCC bridge at Village Allounjakalan Panchayat Allounjakhurd under Block Ichak
2026_RDSPL_110196_1
RDSPL/SD/HZB/36/2025-26
Open Tender
Civil Works
Percentage
270 days
ICHAK
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.6 L
17 Jun 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.
Providing tuck pointing in cement on stone masonary (1:3) cement on brick work with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required a nd utilising the remaining earth locally for road work.
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Rate per cum for grading-III Material
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Sand Filling in foundation trenches as per drawing & technical specification
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications. Random Rubble masonry (coursed/uncoursed)
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 using batching plant & Concrete pump
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. PCC Grade M15 using batching plant & Concrete pump
Plastering with cement mortar (1:3) on brick work in substructure as per technical specifications do-----do--------all complete job.
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications Random Rubble Masonry (Coursed/uncoursed)
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications Height upto 5m PCC Grade M15 using batching plant & concrete pump
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications. Sandy material
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump Height upto 5m
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical Specification.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Dry Rubble Flooring. (Construction of dry rubble flooring at cross drainage works for relatively less important works.)
Dewatering During working period with 10H.P diesel set do-----do--------all complete job.
Cement
Stone chips
Steel
Stone Metal
Bricks
Boulder
Goods & Services Tax (G.S.T.) - 18%
Labour Cess - 1%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.33 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tender_Documents.pdf
Tender Documents • 1.07 MB
BOQ_148984.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .