| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.6 L+₹9,026.98 (2.58%)Admitted-Finance SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GT ENTERPRISE L1 | UNITED ENGINEERING ENTERPRISE L2 |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading | |||||
| 2.00Cleaning and dry inspection of boiler | |||||
| 3.00 | Boiler ash cleaning (left, right, back, bottom) & foundation opening(Material) | 1 | LS | 21,563.85 ₹21,563.85 Lowest | 22,116 ₹22,116 |
| 4.00 | Boiler ash cleaning (left, right, back, bottom) & foundation opening(Labour) | 1 | LS | 2,067.45 ₹2,067.45 Lowest | 2,120 ₹2,120 |
| 5.00 | Boiler ash cleaning foundation resetting(material) | 1 | LS | 13,848.45 ₹13,848.45 Lowest | 14,203 ₹14,203 |
| 6.00 | Boiler ash cleaning foundation resetting(labour) | 1 | LS | 9,227.95 ₹9,227.95 Lowest | 9,464 ₹9,464 |
| 7.00 | Arching blocks: | 20 | Nos | 660 ₹13,200 Lowest | 677 ₹13,540 |
| 8.00 | Seating blocks | 20 | Nos | 660 ₹13,200 Lowest | 677 ₹13,540 |
| 9.00 | Fire clay | 20 | Bag | 385 ₹7,700 Lowest | 395 ₹7,900 |
| 10.00 | Lime | 50 | Kg | 77 ₹3,850 Lowest | 79 ₹3,950 |
Tender Value
₹4.1 L
EMD Value
₹5,200
Closing Date
6 Mar 2026, 5:00 pmClosed
Area Engineer(EnM)
Kenda Area
Cleaning and dry inspection of 01(one) No. Lancashire Boiler No. WBL-10964 and installation of IBR steam pressure meter at winding enhine room of North Jambad at Bahula Colliery Under Kenda Area
2026_ECL_353726_1
GM/KND/AE(ENM)/55(TN)/25-26/65
Open Tender
Miscellaneous Works
Item Rate
10 days
Bahula Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,200
23 Mar 2026
19 Feb 2026
7 Mar 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
19 Feb 2026 - 26 Feb 2026
Item Description/ Heading
Cleaning and dry inspection of boiler
Boiler ash cleaning (left, right, back, bottom) & foundation opening(Material)
Boiler ash cleaning (left, right, back, bottom) & foundation opening(Labour)
Boiler ash cleaning foundation resetting(material)
Boiler ash cleaning foundation resetting(labour)
Arching blocks:
Seating blocks
Fire clay
Trolley bricks
Supplying and filling of sand
Rebuilding pitted areas (4-stack shell) via welding/grinding(Material)
Rebuilding pitted areas (4-stack shell) via welding/grinding(Labour)
Rebuilding pitted areas on fuel pipe (Material)
Rebuilding pitted areas on fuel pipe (Labour)
Boiler main hole IBR Stade changing (40mm x 1ft)(Material)
Boiler main hole IBR Stade changing (40mm x 1ft)(Labour))
Fusible plug opening, boring & threading(Material)
Fusible plug opening, boring & threading (Labour)
New fusible plug fitting with IBR T.C (Material)
New fusible plug fitting with IBR T.C (Labour)
New IBR pressure gauge + siphon pipe valve full set(Material)
New IBR pressure gauge + siphon pipe valve full set(Material)
Boiler fittings (tape, nut/bolt, joint, bush, gauge glass, etc.)(Material)
Boiler fittings (tape, nut/bolt, joint, bush, gauge glass, etc.)(Labourl)
Fitting, commissioning, steaming and running condition(Material)
Fitting, commissioning, steaming and running condition(Labour))
Valve mounting repairing, overhauling and inspection
Valve mounting repairing, overhauling and inspection
Dry & Hydraulic test arrangement for Boiler Inspector
Refitting & Commissioning of boiler
Govt. of W.B Inspection fees for test
Boiler fire bar new making & fabricated fitting
EPF @ 12.72% on Labour Cost
Installation of IBR steam pressure meter at winding engine room
3/4" IBR new siphon pipe and ½" dia pressure gauge
IBR new Gauge Glass Valve (Brass)
Siphon pipe and pressure gauge drilling assembly and fitting charges
Cement
Stone chips
Painting materials
Oxygen
Welding Rods
Primer & Paints
Nut & Bolts of Different Size
Pin Assy for hinges
Pin Assy for tie rod
Cement
Stone Chips
Quick F/A materials
Dismantling of existing platform & open
Dismantling of track & keps accessories
Making temporary Platform under the keps
Fabrication of 04 nos. keps girder with pl
Strengthening & making of hole of proper sizes
Dismantling of concrete in 4 corners
Commissioning of Keps Girder 4 nos.
Painting of all girders & keps assy.
Carrying Materials: Unskilled (SF)
Fabrication: High skilled (SF)
Fabrication: Semi-Skilled (SF)
Fabrication: Unskilled (SF)
Dismantling platform: High-skilled (SF)
Dismantling platform: Unskilled (SF)
Dismantling keps/receiver: High-skilled (SF)
Dismantling keps/receiver: Unskilled (SF)
Concrete & girder base cutting: Unskilled (SF)
Installation: High-skilled (SF)
Installation: Semi-Skilled (SF)
Installation: Unskilled (SF)
Jamming girders: High-skilled (SF)
Jamming girders: Semi-Skilled (SF)
Jamming girders: Unskilled (SF)
Painting: High-skilled (SF)
MS Welding Electrodes
Oxygen (full cylinder)
DA (full cylinder)
Cement
Stone chips
Painting materials
Iron-Steel (Joist, Plates, Angles etc.)
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 1.25 MB
BOQ_366528.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .