| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC low rate |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance above rate |
| Sl No | Description | Qty | Unit | A P CONSTRUCTIONS L1 | R SABEER ALI L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 800 | M3 | 2,078 ₹16.6 L | 2,182 ₹17.5 L |
| 2.00 | Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH. | 1,200 | M3 | 2,380.3 ₹28.6 L | 2,499 ₹30.0 L |
| 3.00 | Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification | 8,000 | M2 | 85.6 ₹6.8 L | 90 ₹7.2 L |
| 4.00 | Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications. | 8,000 | M2 | 19.5 ₹1.6 L | 21 ₹1.7 L |
| 5.00 | Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5. | 400 | M3 | 10,459 ₹41.8 L | 10,982 ₹43.9 L |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 240 | M3 | 11,014 ₹26.4 L | 11,565 ₹27.8 L |
| 7.00 | Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12) | 940 | M2 | 890 ₹8.4 L | 935 ₹8.8 L |
| 8.00 | Providing and laying U/S Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification. | 360 | M3 | 311.5 ₹1.1 L | 328 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
25 Feb 2026, 3:00 pmClosed
E O
Pannaipuram Town Panchayat
Formation of BT Road at 18th Canal To Kottaimalai Adivaram part
2026_DTP_663271_1
80/2025
Open Tender
Civil Works
180 days
Pannaipuram Town Panchayat
As Per Tender Notice
3 documents required · 3 mandatory
₹0
₹1.6 L
Yes
Pannaipuram Town Panchayat
13 Mar 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
25 Feb 2026
21 Feb 2026
21 Feb 2026 - 25 Feb 2026
21 Feb 2026
Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401.
Providing, Laying, Spreading and compacting graded stone aggregate to Wet Mix Macadam for 100mm thick specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density,including all cost conveyance of materials and labour charges etc. complete as per standard specifications as per clause 406 of MORTH.
Providing and laying Prime Coat over WBM/WMM surface using 7 Kg of Emulsion Bitumen(SS-1) for 10 Sq.m and cost of Emulsion Bitumen which will be supplied and procured by the contractor himself at his own cost as per special condition appended including labour charges for preparing the surface for laying the tack coat and for applying the required quantity of bitumenius Binder as tack Coat by Bitumen sprayer including hire and fuel for all tools and plant employed etc., complete as per clause 502 of MORTH Rev-5 Specification . etc., complete as per standard specification
Applying Tack Coat over existing Prime coating WMM surface using 2.5 Kg of Bitumen emulsion(RS-1) per 10 Sq.m including labour charges for preparing the surface removing of binder materials and other foreign matter with wire brushes and small picks & axes sweeping with brooms on soft brushes and finally dusting with old gunny bag and/or compressed air and applying the required quantity of bitumen emulsion as tack coat manually etc., Complete complying with 503 of MORTH.Rev-5 specifications.
Providing and laying 50 mm conslidated thick Dense Bituminuous macadam using 0.24 cum of 26.50-13.20 mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm and below and with 53.20kg of VG30(60/70Bulk ) Bitumen premixing 10 sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 tons capacity,conveying the mix by tipper trucks to work site,spreading the mix uniform thickness of 50mm with paver to the specified grade and cross sections and compaction by vibratory/ pneumatic roller to the required density etc., including labour for accending to pavor at sites etc., including hire charges and fuel charges for 20-30T CMP with bitumen Boiler,tipper trucks, paver finisher/9 m paver finisher,vibratory/ pneumatic rollers and all other tools and plant required including to all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5.
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 50.30 Kgs of VG30 (60/70Bulk ) Bitumen and for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
Providing and laying of hot applied thermoplastic compound 2.5 mm. thick including reflectorising glass beads @ 250 gms. per sqm. area, thickness of 2.5 mm. is exclusive of surface applied glass beads as per IRC: 35. The finished surface to be level, uniform and free from streaks and holes etc. complete. (as per MORT & H specification No.803). (CE(H) Chennai Memo No.4848/BOE/138/2011-1/ dated:06.01.12)
Providing and laying U/S Gravel for 150 mm thick in layers of finished thickness of 75 mm thick each including cost and conveyance of Gravel from approved quarry to working site and stacking them to departmental gauge for pre measurement including labourcharges for sperading watering including all leads for water and consolidation by power roller rolling including hire and fuel charges for all tools and plants employed and all other incidental charges etc, complete complying as per clause 301&305 of MORTH specification.
Note: 1) The Rate Quoted are excluding the GST, 2) The above item 1 to 10 only taken for Price Bid Evaluation comparision
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_796342.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid