Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAdmitted-Finance | ₹19.0 L | L1 | Admitted-Finance |
| 2 | L2₹19.3 LAdmitted-Finance | ₹19.3 L | L2 | Admitted-Finance |
| 3 | L3₹24.3 LAdmitted-Finance | ₹24.3 L | L3 | Admitted-Finance |
| 4 | Rejected-Technical 14 C POCKET A VIKAS PURI EXTN NEW DELHI 110018 | WEST | DELHI | 110018 | - | - | Rejected-Technical Not fulfill the NIT condition no. 2 (Viii) |
| Sl No | Description | Qty | Unit | ARIHANT ENGINEERS AND TRADERS L1 | HYDROCON ENGINEERS L3 | paramount systems L2 |
|---|---|---|---|---|---|---|
| 1.00 | Part A for 15 HP Sewage Trolley Hiring & Running of 15 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | Shifts | 5,67,000 ₹5.7 L | 8,10,000 ₹8.1 L | 5,73,750 ₹5.7 L |
| 2.00 | Hiring of 30 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | 3,44,250 ₹3.4 L | 2,70,000 ₹2.7 L | 3,51,000 ₹3.5 L |
| 3.00 | Part B for 25 HP Sewage TrolleyHiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | Shifts | 5,79,150 ₹5.8 L | 9,45,000 ₹9.4 L | 5,87,250 ₹5.9 L |
| 4.00 | Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | 4,07,700 ₹4.1 L | 4,05,000 ₹4.0 L | 4,18,500 ₹4.2 L |
Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineers E(EnM)M-9
C-2A Block Opp. Geeta Mandir Janakpuri
Installation of different ratings Sewage Pumping Set/Trolley with all allied accessories on hiring basis at any location under Rajouri Garden Constituency, AC-27.
2026_DJB_291077_21
NIT NO. 01 (2026-27)/EE(EnM)M-9
Open Tender
Civil Works
90 days
C-2A Block Opp. Geeta Mandir Janakpuri
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
DJB Account No. 50448339804
₹23,500
16 May 2026
8 May 2026
14 May 2026
8 May 2026
14 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Part A for 15 HP Sewage Trolley Hiring & Running of 15 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | Shifts | 80 | ₹21,600 | item1 |
| 2 | Hiring of 30 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | - | - | item2 |
| 3 | Part B for 25 HP Sewage TrolleyHiring & Running of 25 HP Waste water/Sewage Dewatering Pump-set including all accessories like electric panel, laying of suitable size suction-delivery pipe, delivery length as per site requirement (i/c welding & cutting of MS Pipe, cutting of road, etc.), NRV, cable, etc as per site requirement. The work also includes Operation of P/set round the clock, watch & ward etc. Work shall be on hiring basis including barriers, warning signals, temporary arrangement (tin Shed) for operational staff etc. as per direction of engineer-incharge.
Period :- 90 Days x 3 Shifts = 270 Shifts | 270 | Shifts | - | - | item3 |
| 4 | Hiring of 50 KVA Capacity canopy salient sound proof DG Set floor mounting for Operation of above Sewage Pump-set in good condition. The Job includes Loading/ unloading, cartage, changeover / Main Switch, Electric Panel Board/Starter and cable of suitable size, including consumable items like lubricants etc. and making connection with above said motor/pump-set to made operational in proper way. The Job includes minor maintenance of DG set as per requirement.
Period: 90 Days x 3 Shift = 270 Shifts
Note: If Electric meter will be installed by DISCOM agency then there will be no requirement of said DG set at site. | 270 | Shifts | 80 | ₹21,600 | item4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_386268.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid