Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 4TH FR FL C 4 43 G S C DEB STREET KONNAGAR HOOGHLY WEST BENGAL 712235 | HOOGHLY | WEST BENGAL | 712235 | ₹1.2 Cr | L1 | Accepted-AOC As per approval |
| 2 | L2₹1.3 Cr+₹12.9 L (10.8%)Rejected-AOC | ₹1.3 Cr+₹12.9 L (10.8%) | L2 | Rejected-AOC As per approval |
| 3 | L3₹1.5 Cr+₹26.6 L (22.1%)Rejected-AOC | ₹1.5 Cr+₹26.6 L (22.1%) | L3 | Rejected-AOC As per approval |
| 4 | L4₹1.5 Cr+₹29.0 L (24.1%)Rejected-AOC 00 HANSH NAGAR RADHA RAMAN ROAD MAINPURI MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹1.5 Cr+₹29.0 L (24.1%) | L4 | Rejected-AOC As per approval |
| 5 | L5₹1.5 Cr+₹34.8 L (29.0%)Rejected-AOC | ₹1.5 Cr+₹34.8 L (29.0%) | L5 | Rejected-AOC As per approval |
Tender Value
₹3.3 Cr
EMD Value
₹5.6 L
Closing Date
13 Jun 2025, 5:00 pmClosed
Abhishek Bhardwaj
GAIL Bhubaneswar Pahala office
1- AMC OF CIVIL WORK OF VARIOUS STATIONS UNDER DAPL ODISHA REGION FOR 02 YEARS 2 - AMC OF CIVIL WORK OF VARIOUS STATIONS UNDER BAPL ODISHA REGION FOR 02 YEARS
2025_GAIL_236108_1
GAIL/BBSR/CnP/25-26/09
Open Tender
Civil Works
Percentage
730 days
GAIL BHUBANESWAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹5.6 L
Yes
GAIL Bhubaneswar Pahala office
2 Feb 2026
23 May 2025
14 Jun 2025
24 May 2025
13 Jun 2025
31 May 2025
30 May 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1AMC for civil work of various stations under DAPL and BAPL Odisha Region for 02 years (Part A - DAPL region) | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m :
All kinds of soil. | 105 | M3 | 260.3 | ₹27,331.5 |
| 1.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. | 105 | M3 | 196 | ₹20,580 |
| 1.03 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 105 | M3 | 700.5 | ₹73,552.5 |
| 1.04 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil. | 525 | M2 | 34.15 | ₹17,928.75 |
| 1.05 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 105 | M3 | 2,123.75 | ₹2,22,993.75 |
| 1.06 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 525 | M2 | 8.95 | ₹4,698.75 |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (Zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 105 | M3 | 7,878.5 | ₹8,27,242.5 |
| 1.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (Zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 105 | M3 | 6,812 | ₹7,15,260 |
| 1.09 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :-
1:1.5:3 (1 cement : 1.5 coarse sand (Zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 42 | M3 | 9,045.75 | ₹3,79,921.5 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.66 MB
Tenderdocument.pdf
Tender Documents • 2.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .